Bugis station

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service on the East–West Line between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

SBS Transit SMRT Buses Go-Ahead Tower Transit
  • On Saturday, 30 November, Services , , , , /, , , , , , , , , , , , , , , , , , , , , , , , / & will be diverted to travel on alternative routes from the First Bus to 11.45am. They will skip bus stops along their regular routes, which will include Bayfront Avenue, Beach Road, Nicoll Highway as well as those in the Civic District, Central Business District and Marina Central.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses
    • Go-Ahead
    • Tower Transit

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

SBS Transit SMRT Buses Go-Ahead Tower Transit
  • On Sunday, 1 December, from the First Bus to 3.00pm, Services , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , & will be similarly affected by lane/road closures with bus stops skipped along their regular routes. The affected roads include Bayfront Avenue, Beach Road, Nicoll Highway, Fort Road and Keppel Road as well as those in the Civic District, Central Business District and Marina Central.
  • With the road closures on 1 December, Service will also commence operations at a later time at 12.00pm. Service will be diverted from its regular route along the ECP (towards Bedok North Depot) from the start of operations to 10.30am. However, no bus stops will be skipped. *Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses
    • Go-Ahead
    • Tower Transit

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

2

Bugis
武吉士
பூகிஸ்
Bugis-EWL.png
Bugis-DTL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 320 Victoria Street
191 Rochor Road
Singapore 188045/188476
Line(s) East–West Line
Downtown Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation BGS

Bugis (EW12/DT14) is an underground Mass Rapid Transit (MRT) station on the East–West Line and the Downtown Line.

It is the third station to have travelators within the paid area as the distance between the East West Line and Downtown Line platforms is relatively long.

History

Date Event
4 November 1989 Station officially opens
22 December 2013 Station interchanges with Downtown Line

Casualty incident

On 18 July 2012, two Chinese workers died after a temporary scaffolding, about 4m high, used for the construction of the new Downtown Line station subway link roof slab gave way. The incident happened at about 6.50am. The eight other injured workers who were working on top of the structure, were sent to the nearby Raffles Hospital before rescuers arrived. They had minor injuries and five of them have since been discharged. Of the remaining three workers who were warded, one suffered from abdominal and chest injuries, while another suffered a back injury and the last had a finger injury. Seven of the injured are from Bangladesh while the eighth is from China.

The Ministry of Manpower (MOM) has ordered all construction work to stop, while the Building and Construction Authority (BCA) has revoked the construction permit for the site while investigations are underway. MOM said that based on preliminary information gathered, workers were pouring concrete, also known as the casting process, into the formwork when the structure supporting the formwork collapsed. The formwork, located between the new and old sections of the station, was part of the structure being built to form the underground linkway, which is about three to four metres deep. The area affected is localised, measuring about five metres by 10 metres and the entire station is about 7,500 square metres. The Land Transport Authority said the station structure is substantially complete and structurally sound, and that the incident posed no risk to surrounding developments and the public.[1][2][3]

Art in Transit

Ephemeral by Patrick Chua, attempts to make different experiences of commuters passing by the artwork in their daily journey.[4]

Layout

L1 Street Level Bugis Junction
B1 Service Level Restricted access
B2 EWL Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
DTL Concourse Faregates, Ticketing Machines, Passenger Service Centre
B3 Platform A Template:RailRoute/3
Platform A/B
Platform B Template:RailRoute/1
B4 Transfer Linkway between East West Line Concourse & Downtown Line Platforms
B5 Platform A Template:RailRoute/1
Platform A/B
Plaftom B Template:RailRoute/2

Exits

Exit Disabled-Access Location/Nearby
A Victoria Street, Rochor Road
B Handicapped/disabled access Victoria Street, Raffles Hospital
C Handicapped/disabled access Bugis Junction, Bugis+
D Handicapped/disabled access Tan Quee Lan Street
E DUO
F Handicapped/disabled access

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png East West Line

Template:MRTTime Template:MRTTime

File:MRTFFF.png Downtown Line

Template:MRTTime Template:MRTTime

Bus

Bus Stop Exit Bus Service
01113 Bugis Stn
07551 Fu Lu Shou Cplx
01059 Bugis Stn
01112 Opp Bugis Junction
01119 Bugis Junction
01139 Parkview Sq
01541 Bugis Stn Exit D

References

  1. "Two dead, eight injured at MRT construction site". Channel NewsAsia. Retrieved 18 July 2012.
  2. "Two bodies recovered from MRT work site". Channel NewsAsia. Retrieved 18 July 2012.
  3. "MRT worksite accident: why scaffolding collapsed". Channel NewsAsia. Retrieved 18 July 2012.
  4. "Downtown Line 1: Art-In-Transit". Land Transport Authority. Retrieved 16 October 2013.

Template:East West Line

icon Downtown Line [ VTE ]
Stations Bukit PanjangCashewHillviewHumeBeauty WorldKing Albert ParkSixth AvenueTan Kah KeeBotanic GardensStevensNewtonLittle IndiaRochorBugisPromenadeBayfrontDowntownTelok AyerChinatownFort CanningBencoolenJalan BesarBendemeerGeylang BahruMattarMacPhersonUbiKaki BukitBedok NorthBedok ReservoirTampines WestTampinesTampines EastUpper ChangiExpo
DTL3eXilinSungei Bedok
Rolling Stock 951
Depots Gali BatuKim ChuanEast Coast
Others Bridging Service