Geylang Bahru station

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Template:Code/1
Geylang Bahru
芽笼巴鲁
கேலாங் பாரு
Geylang Bahru-DTL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 541 Kallang Bahru
Singapore 339355
Line(s) Downtown Line
Structure Underground
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation GLB

Geylang Bahru (DT24) is a Mass Rapid Transit (MRT) station on the Downtown Line.

History

Date Event
21 October 2017 Station officially opens[1]

Artworks

  • DT24-Constructed Memories.png
    Downtown Line: Constructed Memories by Marienne Yang
    This series of pictograms recreates daily sights and scenes, injecting them into the daily commute. From a bag of kopi-o to construction workers hard at work, these pictograms add fun and intrigue in unexpected places around the station.[2]

Layout

L1 Street Level
B1 Underpass
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre
B3 Template:Route/2
Platform A/B
Template:Route/1

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Kallang Bahru, Geylang Bahru, Kallang Bahru Swimming Complex, Kolam Ayer NPP
B Handicapped/disabled access Kallang Bahru, Geylang Bahru Terrace

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png Downtown Line
DT1Bukit Panjang 06:00 06:00 06:18 00:04
DT35Expo 05:59 05:59 06:19 00:18

Bus

Bus Stop Exit Bus Service
60221 Blk 73/Geylang Bahru Stn
60229 Blk 68
80291 Blk 82
80299 Opp Blk 82

References

  1. "Factsheet: Downtown Line 3 to Open on 21 October 2017". Land Transport Authority (31 May 2017).
  2. "Art in Transit". Land Transport Authority.
icon Downtown Line [ VTE ]
Stations Bukit PanjangCashewHillviewHumeBeauty WorldKing Albert ParkSixth AvenueTan Kah KeeBotanic GardensStevensNewtonLittle IndiaRochorBugisPromenadeBayfrontDowntownTelok AyerChinatownFort CanningBencoolenJalan BesarBendemeerGeylang BahruMattarMacPhersonUbiKaki BukitBedok NorthBedok ReservoirTampines WestTampinesTampines EastUpper ChangiExpo
DTL3eXilinSungei Bedok
Rolling Stock 951
Depots Gali BatuKim ChuanEast Coast
Others Bridging Service