Bukit Gombak station

From SgWiki
Revision as of 15:20, 4 September 2017 by SG1000G (talk | contribs) (Created page with "{{Infobox/Station |Code={{Code|1|NSL|NS3}} |Name=Bukit Gombak<br>武吉甘柏<br>புக்கிட் கோம்பாக் |Img=<!---Pls add---> |Info= {{Infoline|Add...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service on the East–West Line between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

SBS Transit SMRT Buses Go-Ahead Tower Transit
  • On Saturday, 30 November, Services , , , , /, , , , , , , , , , , , , , , , , , , , , , , , / & will be diverted to travel on alternative routes from the First Bus to 11.45am. They will skip bus stops along their regular routes, which will include Bayfront Avenue, Beach Road, Nicoll Highway as well as those in the Civic District, Central Business District and Marina Central.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses
    • Go-Ahead
    • Tower Transit

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

SBS Transit SMRT Buses Go-Ahead Tower Transit
  • On Sunday, 1 December, from the First Bus to 3.00pm, Services , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , & will be similarly affected by lane/road closures with bus stops skipped along their regular routes. The affected roads include Bayfront Avenue, Beach Road, Nicoll Highway, Fort Road and Keppel Road as well as those in the Civic District, Central Business District and Marina Central.
  • With the road closures on 1 December, Service will also commence operations at a later time at 12.00pm. Service will be diverted from its regular route along the ECP (towards Bedok North Depot) from the start of operations to 10.30am. However, no bus stops will be skipped. *Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses
    • Go-Ahead
    • Tower Transit

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Bukit Gombak
武吉甘柏
புக்கிட் கோம்பாக்
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 802 Bukit Batok West Avenue 5
Singapore 659083
Line(s) North–South Line
Connections Bus, Taxi
Abbreviation BGB

Bukit Gombak (NS3) is an elevated Mass Rapid Transit (MRT) station on the North–South Line.

History

Date Event
10 March 1990 Station officially opens
16 August 2010 Half-Height Platform Screen Doors operates
31 October 2012 High Volume, Low Speed Blade fans operates

Layout

L2 Platform A North–South Line
Template:Terminus
Platform A/B
Platform B North–South Line
Template:Terminus
L1 Concourse Faregates, Ticketing Machines, Passenger Service Centre
Street Level

Exits

Exit Disabled-Access Location/Nearby
A Bukit Gombak Stadium, Bukit Gombak Sports Hall
B Handicapped/disabled access Bukit Batok East Avenue 5, Bukit Gombak Stadium, Choa Chu Kang Town Council (Bukit Gomak Branch)
C Handicapped/disabled access Bukit Batok West Avenue 5
D Handicapped/disabled access Bukit Gombak Sports Hall

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
43571 Opp Bt Gombak Stn
43579 Bt Gombak Stn