Tuas Link station

From SgWiki
Revision as of 22:38, 10 February 2019 by Usurpation (talk | contribs) (from the Template:Infobox/Station, the default is aligning the image to the centre from style="text-align:center;")
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Tuas Link
大士连路
துவாஸ் லிங்க்
Tuas Link-EWL.png*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 20 Tuas West Drive
Singapore 638418
Line(s) East–West Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation TLK

Tuas Link (EW33) is an future elevated Mass Rapid Transit (MRT) station on the East–West Line.

It is the first elevated station to have its platforms lower than the concourse area as the track going Westward (Northwards) will be leveled out with the ground due to the at-grade Tuas Depot.

History

Date Event
18 June 2017 Station officially opens[1]

Casualty incident

An Indian national died after falling into a 68m deep bore hole at the Tuas West Extension worksite off Tuas West Road near Raffles Marina. The police was notified of the accident at around 2.50 pm on 25 August 2012 and subsequently dispatched Singapore Civil Defence Force (SCDF) rescue vehicles to the scene. Eyewitnesses said that the SCDF officers continued the rescue operation until the body of the worker was recovered the next day, almost 24 hours later. The Indian worker was pronounced dead by SCDF officers at 1.40 pm the next day. The Ministry of Manpower (MOM) said its preliminary findings revealed that the workers were in the process of lowering a rebar cage when it got dislodged from its lifting chains and dragged the 30-year-old worker into a 1.5m wide bore hole.[2]

Layout

L3 Concourse Faregates, Ticketing Machines, Passenger Service Centre
L2 Platform A Template:RailRoute/3
Platform A/B
Platform B Template:RailRoute/3
L1 Street Level

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Tuas West Drive, Tuas Bus Terminal, Tuas Depot
B Handicapped/disabled access Tuas West Drive, Tuas Checkpoint

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png East West Line

Template:MRTTime

Bus

Bus Stop Exit Bus Service
25421 Opp Tuas Lk Stn
25429 Tuas Lk Stn

References

  1. "Tuas West Extension Opens on 18 June 2017". Land Transport Authority (27 April 2017). Retrieved 27 April 2017.
  2. "Worker dies after falling into hole at worksite". AsiaOne (27 Aug 2012). Retrived 29 Aug 2012.

Template:East West Line