Difference between revisions of "Aljunied station"

From SgWiki
Jump to navigation Jump to search
m
m (Updating)
Line 61: Line 61:
!width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service
!width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service
{{BusGuide|81089|Aljunied Stn|A}}{{Bus|40|SBST}} {{Bus|62|GAS}} {{Bus|63|SBST}} {{Bus|80|SBST}} {{Bus|100|SBST}} {{Bus|137|SBST}} {{Bus|158|SBST}}
{{BusGuide|81089|Aljunied Stn|A}}{{Bus|40|SBST}} {{Bus|62|GAS}} {{Bus|63|SBST}} {{Bus|80|SBST}} {{Bus|100|SBST}} {{Bus|137|SBST}} {{Bus|158|SBST}}
{{BusGuide|81011|Aft Aljunied Stn|A}}{{Bus|2|GAS}} {{Bus|13|SBST}} {{Bus|21|SBST}} {{Bus|26|SBST}} {{Bus|40|SBST}} {{Bus|51|SBST}} {{Bus|67|SMRT}} {{Bus|137|SBST}} {{Bus|853#|SMRT}}
{{BusGuide|81011|Aft Aljunied Stn|A}}{{Bus|2|GAS}} {{Bus|13|SBST}} {{Bus|21|SBST}} {{Bus|26|SBST}} {{Bus|40|SBST}} {{Bus|51|SBST}} {{Bus|67|SMRT}} {{Bus|137|SBST}} {{Bus|853M|SMRT}}
{{BusGuide|81081|Opp Aljunied Stn|B}}{{Bus|40|SBST}} {{Bus|62|GAS}} {{Bus|63|SBST}} {{Bus|80|SBST}} {{Bus|100|SBST}} {{Bus|125|SBST}} {{Bus|137|SBST}} {{Bus|158|SBST}}
{{BusGuide|81081|Opp Aljunied Stn|B}}{{Bus|40|SBST}} {{Bus|62|GAS}} {{Bus|63|SBST}} {{Bus|80|SBST}} {{Bus|100|SBST}} {{Bus|125|SBST}} {{Bus|137|SBST}} {{Bus|158|SBST}}
|}
|}

Revision as of 20:54, 13 September 2019


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
1

Aljunied
阿裕尼
அல்ஜூனிட்
Aljunied-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 81 Geylang Lorong 25
Singapore 388310
Line(s) East–West Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation ALJ

Aljunied (EW9) is an elevated Mass Rapid Transit (MRT) station on the East–West Line.

History

Date Event
4 November 1989 Station officially opens

Layout

L2 Platform A Template:RailRoute/3
Platform A/B
Platform B Template:RailRoute/1
L1 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
Street Level

Exits

Exit Disabled-Access Location/Nearby
A Sims Avenue, Geylang Chinese Methodist Church, Lorong 25 Geylang, Taxi Stand
B Handicapped/disabled access Aljunied Road, Geylang Methodist School (Primary), Geylang Methodist School (Secondary)

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png East West Line

Template:MRTTime Template:MRTTime

Bus

Bus Stop Exit Bus Service
81089 Aljunied Stn
40
62
63
80
100
137
158
81011 Aft Aljunied Stn
2
13
21
26
40
51
67
137
853M
81081 Opp Aljunied Stn
40
62
63
80
100
125
137
158

References


Template:East West Line