Difference between revisions of "Bombardier Innovia 801A"

From SgWiki
Jump to navigation Jump to search
m
m (Supernutorcrazy moved page Bombardier INNOVIA 801A to Bombardier Innovia 801A)
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Infobox/Train
{{Infobox/Train
|Name=Bombardier INNOVIA C801
|Name=Bombardier INNOVIA C801A
|Img=[[File:C801A-Ext.png|center-left|160px]] [[File:C801A-Int.png|center-right|160px]]
|Img=[[File:C801A-Ext(1).png|center-left|160px]] [[File:C801A-Int(1).png|center-right|160px]]
|Info1=
|Info1=
  {{Infoline|In service|2014 – Present}}
  {{Infoline|In service|2014 – Present}}
Line 23: Line 23:


==History==
==History==
On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. <ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> Under the contract, all of the 19 C801A trains would be retrofitted with the new signalling system by 2022.
On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. <ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> Under the contract, all of the 13 C801A trains would be retrofitted with the new signalling system by 2022.


==Design/Features==
==Design/Features==
Line 45: Line 45:
|-
|-
!style="text-align:left"|Seating Capacity
!style="text-align:left"|Seating Capacity
|22
|16
|-
|-
!style="text-align:left"|Wheelchair Bay
!style="text-align:left"|Wheelchair Bay

Latest revision as of 22:34, 5 March 2024

Bombardier INNOVIA C801A
center-left center-right
*Graphic From SGTrains/Wikipedia/LTA
In service 2014 – Present
Manufacturer Bombardier Transportation
Origin Pennsylvania, United States of America
Constructed 2014 – 2015
Number Built 13 cars (13 Trains)
Statistics
Body Construction Aluminum
Length 12.8 m
Width 2.8 m
Height 3.4 m
Doors 2 m, 4 per car
Maximum Speed Design: 55 km/h
Service: 48 km/h
Traction Control Thyristor (Bombardier)
Line Voltage 600V AC Third Rail
Track Gauge Central Guideway

Bombardier INNOVIA C801A are the second generation of trains running on the Bukit Panjang LRT.

History[edit]

On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. [1] Under the contract, all of the 13 C801A trains would be retrofitted with the new signalling system by 2022.

Design/Features[edit]

Initial
M
Exterior Design
Livery SMRT Pixel Livery (White with Yellow, Red, Black stripes)
Train Run Number N/A
Interior Design
Seating Capacity 16
Wheelchair Bay N/A
Door Closing Indicator Lights N/A
System
Safety System ATC, ATO, ATP, ATS
Signalling System Fixed Block
Traction Control Thyristor (Bombardier)

Fleet Numbering[edit]

The car numbers of the trains range from 120 to 132.

References[edit]

  1. "Award of Contract to Renew the Bukit Panjang LRT System". Land Transport Authority. Retrieved 28 July 2018.
icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A810810A
Future801B810D
Depots SengkangTen Mile Junction
icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bukit Panjang LRT Bridging Service