Difference between revisions of "Bombardier Innovia 801A"

From SgWiki
Jump to navigation Jump to search
(Removed as Crystal Mover trains also does.)
m (Removed protection from "Bombardier INNOVIA C801A")
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Infobox/Train
|Name=Bombardier INNOVIA C801A
|Img=[[File:C801A-Ext(1).png|center-left|160px]] [[File:C801A-Int(1).png|center-right|160px]]
|Info1=
{{Infoline|In service|2014 – Present}}
{{Infoline|Manufacturer|Bombardier Transportation}}
{{Infoline|Origin|Pennsylvania, United States of America}}
{{Infoline|Constructed|2014 – 2015}}
{{Infoline|Number Built|13 cars (13 Trains)}}
|Info2=
{{Infoline|Body Construction|Aluminum}}
{{Infoline|Length|12.8 m}}
{{Infoline|Width|2.8 m}}
{{Infoline|Height|3.4 m}}
{{Infoline|Doors|2 m, 4 per car}}
{{Infoline|Maximum Speed|Design: 55 km/h<br>Service: 48 km/h}}
{{Infoline|Traction Control|Thyristor (Bombardier)}}
{{Infoline|Line Voltage|600V AC Third Rail}}
{{Infoline|Track Gauge|Central Guideway}}
}}


{| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" cellspacing="0"
'''Bombardier INNOVIA C801A''' are the second generation of trains running on the {{BPLRT}}.
| colspan="2" style="text-align:center" | <big><strong>Bombardier INNOVIA C801A</strong></big>
 
|-
==History==
| colspan="2" style="text-align:center"|[[File:C801A.jpg|center|300px]]Exterior of a coupled C801A train.
On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. <ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> Under the contract, all of the 13 C801A trains would be retrofitted with the new signalling system by 2022.
 
==Design/Features==
{| class="toccolours" border=1 style="text-align:center;border-collapse:collapse;"
|-class="SMRT"
!class="LTA"|
!Initial
|-
|-
! In service
!
| 19 November 2014 - Current
|<div class="train">{{TrainCar|M|97B727|only}}</div>
|-  
|-style="background-color:#DDD"
! Manufacturer
!colspan=2|Exterior Design
| Bombardier Transportation (Former Adtranz)
|-
|-
! Constructed
!style="text-align:left"|Livery
| 2014-2015
|SMRT Pixel Livery (White with Yellow, Red, Black stripes)
|-
|-
! Number built
!style="text-align:left"|Train Run Number
| Passenger service: 13 cars (13 trains)
|{{N/A}}
|-style="background-color:#DDD"
!colspan=2|Interior Design
|-
|-
! Capacity
!style="text-align:left"|Seating Capacity
| 105 passengers<br>22 seats
|16
|-
|-
! Operator
!style="text-align:left"|Wheelchair Bay
| SMRT Light Rail (SMRT Corporation)
|{{N/A}}
|-
|-
! Depot
!style="text-align:left"|Door Closing Indicator Lights
| [[Ten Mile Junction Depot|Ten Mile Junction]]
|{{N/A}}
|-style="background-color:#DDD"
!colspan=2|System
|-
|-
! Line served
!style="text-align:left"|Safety System
| [[Bukit Panjang LRT]]
|ATC, ATO, ATP, ATS
|-
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Specifications</strong> 
!style="text-align:left"|Signalling System
|- 
|Fixed Block
! Car length
| 12.8 m
|-
|-
! Width
!style="text-align:left"|Traction Control
| 2.8 m
|Thyristor (Bombardier)
|-
! Height
| 3.4 m
|-
! Maximum speed
| 55 km/h (Design)<br>26 km/h (Service)
|-
! Weight
| 15000 kg
|-
! Gauge
| Central guideway with rubber tyres
|}
|}


'''Bombardier INNOVIA C801A''' (APM 100) is an automated people mover (APM) train built by Adtranz (now Bombardier Transportation) for the use on the [[Bukit Panjang LRT]] line. These trains are mainly for airport connections and light rail in towns, operating by Automatic Train Control (ATC), making it fully automatic and driverless.
==Fleet Numbering==
 
The car numbers of the trains range from 120 to 132.
This additional batch of trains will increase the capacity of the [[Bukit Panjang LRT]] line by 50% by end 2015.
 
==Fleet==
[[C801A Fleet Info]]
 
==Operation==
The C801A trains are fully automated, without attendant, running on a system that are similar to the [[Bombardier INNOVIA C801|C801]] trains.
 
Trains can be coupled for two-car operations.
 
==Features==
===Design===
The C801A trains are relatively different from the C801 trains in terms of exterior and interior looks.
* Painted with SMRT's new livery.
* Circular headlights unlike the C801s, which have rectangular headlights.
* Solar windshields installed at both windows of the car to help deflect sunlight and keep cabin temperatures cool.
* Ergonomic seat profile.
* Red reserved seats for clearer separation between normal and reserved seats.
* Yellow hand grips.
 
===Others===
Similarly to the [[Bombardier INNOVIA C801|C801]] trains, rubber-tired wheels are used to run on a concrete track. It makes them extremely quiet. Windows mist within 6 meters of residential buildings, eliminating both noise and privacy concerns.


==Trainset numbers==
==References==
Individual cars are given a three-digit serial number by the rail operator, SMRT Corporation, ranging from 120 to 132.
<references/>


==Related Articles==
*  [[Trains]]
{{Light Rail Transit}}
{{Light Rail Transit}}
{{Bukit Panjang LRT}}


[[Category:Trains]]
[[Category:Train Rolling Stock]]
[[Category:Train Rolling Stock]]

Revision as of 11:40, 2 September 2020

Bombardier INNOVIA C801A
center-left center-right
*Graphic From SGTrains/Wikipedia/LTA
In service 2014 – Present
Manufacturer Bombardier Transportation
Origin Pennsylvania, United States of America
Constructed 2014 – 2015
Number Built 13 cars (13 Trains)
Statistics
Body Construction Aluminum
Length 12.8 m
Width 2.8 m
Height 3.4 m
Doors 2 m, 4 per car
Maximum Speed Design: 55 km/h
Service: 48 km/h
Traction Control Thyristor (Bombardier)
Line Voltage 600V AC Third Rail
Track Gauge Central Guideway

Bombardier INNOVIA C801A are the second generation of trains running on the Bukit Panjang LRT.

History

On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. [1] Under the contract, all of the 13 C801A trains would be retrofitted with the new signalling system by 2022.

Design/Features

Initial
M
Exterior Design
Livery SMRT Pixel Livery (White with Yellow, Red, Black stripes)
Train Run Number N/A
Interior Design
Seating Capacity 16
Wheelchair Bay N/A
Door Closing Indicator Lights N/A
System
Safety System ATC, ATO, ATP, ATS
Signalling System Fixed Block
Traction Control Thyristor (Bombardier)

Fleet Numbering

The car numbers of the trains range from 120 to 132.

References

  1. "Award of Contract to Renew the Bukit Panjang LRT System". Land Transport Authority. Retrieved 28 July 2018.
icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A810810A
Future801B810D
Depots SengkangTen Mile Junction
icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bukit Panjang LRT Bridging Service