Difference between revisions of "Bombardier Innovia 801A"

From SgWiki
Jump to navigation Jump to search
m (Removed protection from "Bombardier INNOVIA C801A")
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Infobox/Train
{{Infobox/Train
|Name=Bombardier INNOVIA C801
|Name=Bombardier INNOVIA C801A
|Img=[[File:C801A-Ext.png|center-left|160px]] [[File:C801A-Int.png|center-right|160px]]
|Img=[[File:C801A-Ext(1).png|center-left|160px]] [[File:C801A-Int(1).png|center-right|160px]]
|Info1=
|Info1=
  {{Infoline|In service|2014 – Present}}
  {{Infoline|In service|2014 – Present}}
Line 23: Line 23:


==History==
==History==
On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. <ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> Under the contract, all of the 19 C801A trains would be retrofitted with the new signalling system by 2022.
On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. <ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> Under the contract, all of the 13 C801A trains would be retrofitted with the new signalling system by 2022.


==Design/Features==
==Design/Features==

Revision as of 11:40, 2 September 2020

Bombardier INNOVIA C801A
center-left center-right
*Graphic From SGTrains/Wikipedia/LTA
In service 2014 – Present
Manufacturer Bombardier Transportation
Origin Pennsylvania, United States of America
Constructed 2014 – 2015
Number Built 13 cars (13 Trains)
Statistics
Body Construction Aluminum
Length 12.8 m
Width 2.8 m
Height 3.4 m
Doors 2 m, 4 per car
Maximum Speed Design: 55 km/h
Service: 48 km/h
Traction Control Thyristor (Bombardier)
Line Voltage 600V AC Third Rail
Track Gauge Central Guideway

Bombardier INNOVIA C801A are the second generation of trains running on the Bukit Panjang LRT.

History

On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. [1] Under the contract, all of the 13 C801A trains would be retrofitted with the new signalling system by 2022.

Design/Features

Initial
M
Exterior Design
Livery SMRT Pixel Livery (White with Yellow, Red, Black stripes)
Train Run Number N/A
Interior Design
Seating Capacity 16
Wheelchair Bay N/A
Door Closing Indicator Lights N/A
System
Safety System ATC, ATO, ATP, ATS
Signalling System Fixed Block
Traction Control Thyristor (Bombardier)

Fleet Numbering

The car numbers of the trains range from 120 to 132.

References

  1. "Award of Contract to Renew the Bukit Panjang LRT System". Land Transport Authority. Retrieved 28 July 2018.
icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A810810A
Future801B810D
Depots SengkangTen Mile Junction
icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bukit Panjang LRT Bridging Service