Bukit Panjang LRT

From SgWiki
Revision as of 11:36, 2 September 2020 by Supernutorcrazy (talk | contribs) (Removed protection from "Bukit Panjang LRT")
Jump to navigation Jump to search


!
COVID-19 ADVISORY
!
In light of the current COVID-19, sgWiki would like to remind all to:
  • Keep good personal hygiene
  • Wear a mask when not at home unless participating in high strenuous exercise.
  • Visit a clinic if you develop cough, flu and/or fever. Contact the clinic beforehand if you suspected yourself to be infected with the virus.
  • Defer all non-essential travel abroad. All travelers (including Singaporeans) entering Singapore may be issued a Stay-Home Notice (SHN).
  • Short-Term visitors (except certain travellers) are not allowed to enter in Singapore.
  • Observe the necessary Stay-Home Notice (SHN) or Quarantine Order (QO) protocols.
  • For more information, visit sgWiki summarised guide, Ministry of Health (Singapore) website or World Health Organisation website.
!
TRAVEL ADVISORY
!
SMRT East West Line
  • Due to track maintenance works (replacement of electrical cables), from 14 March 2021 till 18 April 2021, train services between EW27 Boon Lay and EW33 Tuas Link stations; and from 25 April 2021 till 23 May 2021, train services between EW29 Joo Koon and EW33 Tuas Link stations will be suspended on Sundays. Please refer here for more information.

SMRT East West Line
  • Due to track maintenance works (replacement of electrical cables), there is no train services between EW27 Boon Lay and EW33 Tuas Link stations. Affected commuters may take MRT Shuttle 3 provided. Do take note that the last bus of MRT Shuttle 3 may not coincide with the last train service at EW27 Boon Lay. Please refer here for more information.

SMRT East West Line
  • Due to track maintenance works (replacement of electrical cables), there is no train services between EW29 Joo Koon and EW33 Tuas Link stations. Please refer here for more information.

SBS Transit North East Line
  • Due to track maintenance works, from 9 April 2021 till 17 April 2021, train services between NE12 Serangoon and NE17 Punggol stations; and from 23 April 2021 till 8 May 2021, train services between NE1 HarbourFront and NE6 Dhoby Ghaut stations will end at 11pm on Fridays and Saturdays. Please refer here for more information.

SBS Transit North East Line
  • Due to track maintenance works, train services between NE12 Serangoon and NE17 Punggol stations will end at 11pm. Affected commuters may take MRT Shuttle 21 provided. Do take note that the last bus of MRT Shuttle 21 may not coincide with the last train service at NE12 Serangoon. Please refer here for more information.

SBS Transit North East Line
  • Due to track maintenance works, train services between NE1 HarbourFront and NE6 Dhoby Ghaut stations will end at 11pm. Affected commuters may take MRT Shuttle 22 provided. Do take note that the last bus of MRT Shuttle 22 may not coincide with the last train service at NE6 Dhoby Ghaut. Please refer here for more information.

SMRT Thomson–East Coast Line

SMRT Thomson–East Coast Line
  • Due to system integrating test, train services between TE1 Woodlands North and TE3 Woodlands South stations will start at 6.30am and will end at 9pm. Please refer here for more information.

Changi Airport Group Changi Airport Skytrain
  • Due to COVID-19, skytrain services are suspended except Public Service between T3 Station B and T1 Station C.
  • Due to renovation of Terminal 2, skytrain service between T2 Station E and T2 Station F is suspended.

SBS Transit SMRT Buses
  • Due to Malaysia's Control Orders,
    • Bus services
      160
      and
      170
      are diverted to loop at Woodlands Centre Road, skipping all stops in Malaysia.
    • Bus services
      170X
      and
      950
      are suspended.
  • Please refer here (SBS Transit) and here (SMRT Buses) for more information.

Land Transport Authority SBS Transit SMRT Buses
  • Due to post COVID-19 "Circuit Breaker" measures, all Chinatown Direct, NightRider and Nite Owl bus services, as well as bus services
    188R
    ,
    401
    ,
    926
    and
    963R
    are suspended. Please refer here for more information.

Go-Ahead
  • From Sunday, 11 April 2021, bus service
    15
    will serve an additional pair of bus stops along Pasir Ris Drive 8. Please refer here for more information.

SBS Transit SMRT Buses
  • From Sunday, 11 April 2021, bus services
    67
    ,
    75
    and
    170
    will be amended to ply the extended southbound Upper Bukit Timah Road instead of Jalan Anak Bukit. Please refer the following for more information:

SBS Transit SMRT Buses Go-Ahead
  • From Sunday, 11 April 2021,
    • the suffix “A” will be added to
      • bus service
        63
        for trips terminating at Jalan Rumah Tinggi (opp Blk 36);
      • bus service
        966
        for trips terminating at Marine Parade Road (opp Parkway Parade);
    • the suffix “B” will be added to bus service
      857
      for trips terminating at Temasek Avenue (Promenade station);
    • the suffix “C” will be added to bus service
      975
      for trips terminating at Lim Chu Kang Road (Police Coast Guard).
    • the suffix “T” will be added to
      • bus service
        60
        for trips terminating at Bedok interchange;
      • bus service
        73
        for trips terminating at Toa Payoh interchange;
      • bus services
        83
        and
        965
        for trips terminating at Sengkang interchange;
      • bus service
        859
        for trips terminating at Yishun interchange;
      • bus service
        860
        for trips terminating at Yio Chu Kang interchange;
  • Please refer the following for more information:

SBS Transit
  • From Monday, 12 April 2021, bus service
    671
    will call at an additional pair of bus stops along Sengkang West Avenue. Please refer here for more information.

BP
Bukit Panjang LRT
武吉班让轻轨
புக்கிட் பாஞ்சாங் லைட் ரெயில்
C801 112 x C801A.jpg
Statistics
Status Operational
Termini Choa Chu Kang
Ten Mile Junction (Former)
Stations 13
Services 2
Operator(s) SMRT
Rolling stock C801,C801A
Line length 7.7 km
Electrification Third rail

Bukit Panjang LRT (BPLRT) is the first Light Rail Transit (LRT) line. Traveling one loop takes about 30 minutes. The line is currently 7.7 km long with 13 stations and it is fully automated.

The line was formally 7.9 km long with 14 stations prior to the overhaul and upgrading works. As a result, Ten Mile Junction station was permanently closed.

History

Date Event
6 November 1999 Choa Chu Kang - Senja
Bukit Panjang - Ten Mile Junction
10 December 2010 - 30 December 2011 Bukit Panjang - Ten Mile Junction (Service C) suspended due to the redevelopment of Junction 10 (then Ten Mile Junction) Shopping Centre[1][2]
13 January 2019 Closure of Ten Mile Junction station
Service C withdrawn
1 December 2019 Operation convert to uni-direction (Service B) except during weekday peak hours

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
Bukit Panjang LRT
BP1NS4 Choa Chu Kang Choa Chu Kang-BPLRT.png Choa Chu Kang Terminus
Interchange with North South Line
BP2 South View South View-BPLRT.png South View
BP3 Keat Hong Keat Hong-BPLRT.png Keat Hong
BP4 Teck Whye Teck Whye-BPLRT.png Teck Whye
BP5 Phoenix Phoenix-BPLRT.png Phoenix
BP6=DT1 Bukit Panjang Bukit Panjang-BPLRT.png Bukit Panjang Interchange with Downtown Line
BP7 Petir Petir-BPLRT.png Petir
BP8 Pending Pending-BPLRT.png Pending
BP9 Bangkit Bangkit-BPLRT.png Bangkit
BP10 Fajar Fajar-BPLRT.png Fajar
BP11 Segar Segar-BPLRT.png Segar
BP12 Jelapang Jelapang-BPLRT.png Jelapang
BP13 Senja Senja-BPLRT.png Senja
Former
BP14 Ten Mile Junction Ten Mile Junction-BPLRT.png Ten Mile Junction Closed

Services

Service Route Notes
A Choa Chu KangSenjaPetirChoa Chu Kang Peak Hour Service
B Choa Chu KangPetirSenjaChoa Chu Kang
C Ten Mile JunctionSenjaPetirTen Mile Junction Former Service

Rolling stock

The rolling stock consists of Bombardier INNOVIA C801 and Bombardier INNOVIA C801A trains. These trains operate from Ten Mile Junction Depot near Bukit Panjang station.

References

  1. "Ten Mile Junction LRT to be closed for retrofitting works". Channel NewsAsia (6 December 2010). Archived on 7 December 2010.
  2. "SMRT to resume operations of Service C on Bukit Panjang LRT". Channel NewsAsia (28 December 2011). Archived on 8 January 2012.
Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks C801C801AC810C810A
FutureC801B
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North South LineEast West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock C801C801AC801B
Depots Ten Mile Junction
Others Bukit Panjang LRT Bridging Service