Difference between revisions of "Canberra station"

From SgWiki
Jump to navigation Jump to search
m
Line 9: Line 9:


It will be the second MRT station in Singapore after {{Stn|Dover}} to be built on an existing rail line and elevated with side platforms.<ref>[//app.lta.gov.sg/apps/news/page.aspx?c=2&id=beab07d4-f096-4d34-bc70-9d529ae12634 "New Addition to North-South Line: Canberra Station"]. Land Transport Authority. Retrieved 1 August 2014.</ref>
It will be the second MRT station in Singapore after {{Stn|Dover}} to be built on an existing rail line and elevated with side platforms.<ref>[//app.lta.gov.sg/apps/news/page.aspx?c=2&id=beab07d4-f096-4d34-bc70-9d529ae12634 "New Addition to North-South Line: Canberra Station"]. Land Transport Authority. Retrieved 1 August 2014.</ref>
==History==
{|class="wikitable mw-collapsible" style="width:50%"
!width=150|Date!!Event
|-
|2 November 2019||Station officially opens
|}


==References==
==References==

Revision as of 17:33, 20 May 2019


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
1

Canberra
坎贝拉
கான்பரா
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Line(s) North–South Line (Future)

Canberra (NS12) is a future elevated Mass Rapid Transit (MRT) station on the North–South Line.[1]

It will be the second MRT station in Singapore after Dover to be built on an existing rail line and elevated with side platforms.[2]

History

Date Event
2 November 2019 Station officially opens


References

  1. "New MRT station for North-South Line: Canberra". The Straits Times (27 June 2014). Retrieved 1 August 2014.
  2. "New Addition to North-South Line: Canberra Station". Land Transport Authority. Retrieved 1 August 2014.

Template:North South Line