Difference between revisions of "Changi Airport Skytrain"

From SgWiki
Jump to navigation Jump to search
m
(18 intermediate revisions by 9 users not shown)
Line 1: Line 1:
{| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" cellspacing="0"
{{Infobox/Line
| colspan="2" style="text-align:center" | <big><strong>Changi Airport Skytrain</strong></big>
|TA=RCAS
|Line=CAS
|Name=Changi Airport Skytrain
|Img=[[File:CAS Logo.png|centre|70px]]
|Info=
{{Infoline|Status|Operational}}
{{Infoline|Stations|7}}
{{Infoline|Services|5}}
{{Infoline|Operator(s)|{{CAG}}}}
{{Infoline|Rolling stock|[[Mitsubishi Heavy Industries Crystal Mover|Crystal Mover]]}}
{{Infoline|Line length|6.4 km}}
{{Infoline|Track gauge|1,850 mm broad gauge}}
{{Infoline|Electrification|750V DC Third rail}}
}}
 
'''Changi Airport Skytrain''' is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.
 
==History==
{|class="wikitable mw-collapsible" style="border-collapse:collapsed;width:50%"
|-
|-
| colspan="2"| Please insert picture
!width=150|Date!!Event
|-
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Overview</strong>
|1990||Terminal 1 - Terminal 2
|-
|-
! Type
|March 2006||Replacement of C-100 trains to Crystal Movers
| People mover
|-
|-
! Status
|rowspan=2|November 2007||Terminal 3
| Operational
|
! Locale
| Singapore Changi Airport, Singapore
|-
|-
! Stations
|Opening of PMS South
| 7
|-
|-
! Services
|24 February 2015||Suspension of PMS North (Terminal 2 - Terminal 3)
| 5
|-
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Operation</strong>
|12 April 2019||Resumption of PMS North (Terminal 2 - Terminal 3)
|-
! Opened
| 1990
|-
|-
! Owner
|1 May 2020||Temporary closure of Terminal 2 stations
| Civil Aviation Authority of Singapore
|}
|-
 
! Operator(s)
==Stations==
| Civil Aviation Authority of Singapore
{| class="wikitable"
|-
|-
! Rolling stock
!class="LTA"|Station!!class="LTA"|Terminal!!class="LTA"|Notes
| Mitsubishi Heavy Industries Crystal Mover
|-
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Technical</strong>
!colspan=3 class="CAS"|[[File:CAS000.png|18px|link=|alt=]] Changi Airport Skytrain
|-
|-
! Electrification
|A||3||Transit only
| Third rail
|}
 
The '''Changi Airport Skytrain''' is a people mover system that connects Terminals 1, 2 and 3 at [[Singapore Changi Airport]]. Opened in 1990, it was the first auto-guided system in Asia.[http://www.cpgcorp.com.sg/portfolio/viewdetails.asp?PCID=9&PDID=116 (1)] The Changi Airport Skytrain operates from 0500 to 0230 daily and operates at 1 to 2 minute intervals.[http://www.changiairport.com/changi/en/airport_guide/getting_around/terminal_transfer.html (2)] Travel on the Skytrain is free and an inter-terminal journey takes about 90 seconds. All stations have platform screen doors, are air conditioned and have plasma displays indicating the arrival time of the next train.
 
With the opening of the [[Changi Airport MRT Station]] on 8 February 2002, the Skytrain is able to connect passengers at Terminal 1 to the [[Mass Rapid Transit|MRT]] station entrances located at Terminals 2 and 3.[http://infopedia.nlb.gov.sg/articles/SIP_574_2004-12-23.html (3)]
 
Initially, the Skytrain rolling stock consisted of [[Bombardier Innovia APM 100]]s, jointly built by Westinghouse and Adtranz (acquired by Bombardier). In 2002, work began on a new S$135 million [[Mitsubishi Heavy Industries Crystal Mover|Mitsubishi Crystal Mover]]-based system to accommodate the planned opening of Terminal 3 and the projected increase in demand as the airport expands.[http://www.changiairport.com/changi/en/about_us/history_changi.html (4)]
 
The previous rolling stock of Bombardier Innovia APM 100 ran without a second carriage per train (as opposed to the current Mitsubishi Crystal Movers, which runs with two carriages per train), and the first two platform screen doors of each station were for emergency purposes (The Innovia APM 100s stopped at the outer half of each station, with two doors on each half.).
 
The third rail, formerly at the centre of the track, was moved to the side. The new system opened in March 2006 between Terminals 1 and 2 and opened the connection with Terminal 3 in November 2007 during Terminal 3's open house.
 
==Stations==
{|class="wikitable" border="1" cellpadding="2" style="margin-left: 1em; margin-bottom: 1em; color: black; border-collapse: collapse; font-size: 95%"
|-
|-
! Station !! Terminal !! Destination Station !! Service
|A (South)||3||Transit only
|-
|-
| rowspan=2 | A
|B||3||Linked to {{CG2| |1}}
| rowspan=2 | Terminal 3
| A South || Transit
|-
|-
| F || Transit
|C||1||
|-
|-
| A South || Terminal 3 || A || Transit
|D||1||
|-
|-
| rowspan=2 | B
|E||2||Linked to {{CG2| |1}}
| rowspan=2 | Terminal 3 || C || Public/Transit
|-
|-
| E || Public/Transit
|F||2||Transit only
|}
 
==Services==
{| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;"
|-style="text-align:center;" class="CAS"
!Type!!Ply Between!!Notes
|-
|-
| C || Terminal 1 || B || Public/Transit
|Both||{{Stn|Terminal 1}} ↔ {{Stn|Terminal 2}}||PMS North only.
|-
|-
| D || Terminal 1 || E || Public/Transit
|Both||{{Stn|Terminal 1}} ↔ {{Stn|Terminal 3}}||PMS North only.
|-
|-
| rowspan=2 | E
|Both||{{Stn|Terminal 2}} ↔ {{Stn|Terminal 3}}||
| rowspan=2 | Terminal 2 || B || Public/Transit
|-
|-
| D || Public/Transit
|Transit||{{Stn|Terminal 2}} ↔ {{Stn|Terminal 3}}||PMS South only.
|-
|-
| F || Terminal 2 || A || Transit
|Transit||{{Stn|Terminal 3}} ↔ {{Stn|Terminal 3}} (South)||PMS South only.
|}
|}


==Future Expansion==
==Rolling stock==
Plans are in place for future expansions of the system. These would include a 2-station single lane shuttle of about 500 m in length serving the southside of Terminal 2 from Station F, and a 4-station dual lane shuttle of about 1400 m to serve a future Terminal 4.[http://www.leaelliott.com/Information/PDF/Singapore+Changi+Airport+by+Cindy+Sugimoto.pdf (5)]
The rolling stock consists of [[Mitsubishi Heavy Industries Crystal Mover|Crystal Mover]] trains. These trains operate from two depots along the line at either side of the system.


==References==
==References==
# "Singapore Changi Airport I, II, III". CPG Corporation.
<references/>
# "Inter-terminal Transfer". Changi Airport.
# "Changi International Airport". National Library Board. 2001.
# "Milestones of Changi Airport". Changi Airport.
# "Singapore Changi Airport People Mover System". Archived from the original on 13 January 2006. Retrieved 2008-03-08.


==Category Links==
{{Railway Lines}}
{{Railway Lines in Singapore}}
{{Changi Airport Skytrain}}

Revision as of 13:05, 25 June 2020


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 28 April 2024, feeder bus service
    296
    will be introduced, plying between Tampines Int and Tampines North Dr 2 (Loop).

Please refer here for more information.

Changi Airport Skytrain
CAS Logo.png
Statistics
Status Operational
Stations 7
Services 5
Operator(s) Changi Airport Group
Rolling stock Crystal Mover
Line length 6.4 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.

History

Date Event
1990 Terminal 1 - Terminal 2
March 2006 Replacement of C-100 trains to Crystal Movers
November 2007 Terminal 3
Opening of PMS South
24 February 2015 Suspension of PMS North (Terminal 2 - Terminal 3)
12 April 2019 Resumption of PMS North (Terminal 2 - Terminal 3)
1 May 2020 Temporary closure of Terminal 2 stations

Stations

Station Terminal Notes
Changi Airport Skytrain
A 3 Transit only
A (South) 3 Transit only
B 3 Linked to CG21Changi Airport
C 1
D 1
E 2 Linked to CG21Changi Airport
F 2 Transit only

Services

Type Ply Between Notes
Both Terminal 1Terminal 2 PMS North only.
Both Terminal 1Terminal 3 PMS North only.
Both Terminal 2Terminal 3
Transit Terminal 2Terminal 3 PMS South only.
Transit Terminal 3Terminal 3 (South) PMS South only.

Rolling stock

The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.

References


Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Changi Airport Skytrain [ VTE ]
Stations Station AStation A (South)Station BStation CStation DStation EStation F
Rolling Stock Adtranz C-100 (Former) • Mitsubishi Heavy Industries Crystal Mover