Difference between revisions of "Changi Airport Skytrain"

From SgWiki
Jump to navigation Jump to search
m
Line 64: Line 64:
!Type!!Ply Between!!Notes
!Type!!Ply Between!!Notes
|-
|-
|Both||{{Stn|Terminal 1}} ↔ {{Stn|Terminal 2}}||PMS North only.
|Both||{{Stn|Station D}} (T1) ↔ {{Stn|Station E}} (T2)||PMS North only.
|-
|-
|Both||{{Stn|Terminal 1}} ↔ {{Stn|Terminal 3}}||PMS North only.
|Both||{{Stn|Station B}} (T3) ↔ {{Stn|Station C}} (T1)||PMS North only.
|-
|-
|Both||{{Stn|Terminal 2}} ↔ {{Stn|Terminal 3}}||
|Both||{{Stn|Station B}} (T3) ↔ {{Stn|Station E}} (T2)||
|-
|-
|Transit||{{Stn|Terminal 2}} ↔ {{Stn|Terminal 3}}||PMS South only.
|Transit||{{Stn|Station A}} (T3) ↔ {{Stn|Station F}} (T2)||PMS South only.
|-
|-
|Transit||{{Stn|Terminal 3}} ↔ {{Stn|Terminal 3}} (South)||PMS South only.
|Transit||{{Stn|Station A}} (T3) ↔ {{Stn|Station A (South)}} (T3)||PMS South only.
|}
|}



Revision as of 08:36, 23 July 2020


!
COVID-19 ADVISORY
!
In light of the current COVID-19, sgWiki would like to remind all to:
!
TRAVEL ADVISORY
!
Changi Airport Group Changi Airport Skytrain
  • Due to renovation of Terminal 2, skytrain services serving T2 Station E are suspended.

SBS Transit
  • From Sunday, 31 July 2022, bus service
    117
    and
    117M
    will be amended to ply Punggol Field. Please refer here for more information.

Land Transport Authority SBS Transit Sengkang LRT Punggol LRT
  • To facilitate maintenance work, from Saturday, 21 May 2022, to Sunday, 25 September 2022, train services on the Sengkang LRT and the Punggol LRT will operate on a single loop on Saturdays and Sundays. Please refer to SBS Transit website for more information.

Changi Airport Skytrain
CAS Logo.png
Statistics
Status Operational
Stations 7
Services 5
Operator(s) Changi Airport Group
Rolling stock Crystal Mover
Line length 6.4 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.

History

Date Event
1990 Terminal 1 - Terminal 2
March 2006 Replacement of C-100 trains to Crystal Movers
November 2007 Terminal 3
Opening of PMS South
24 February 2015 Suspension of PMS North (Terminal 2 - Terminal 3)
12 April 2019 Resumption of PMS North (Terminal 2 - Terminal 3)
1 May 2020 Temporary closure of Terminal 2 stations

Stations

Station Terminal Notes
Changi Airport Skytrain
A 3 Transit only
A (South) 3 Transit only
B 3 Linked to CG21 Changi Airport
C 1
D 1
E 2 Linked to CG21 Changi Airport
F 2 Transit only

Services

Type Ply Between Notes
Both Station D (T1) ↔ Station E (T2) PMS North only.
Both Station B (T3) ↔ Station C (T1) PMS North only.
Both Station B (T3) ↔ Station E (T2)
Transit Station A (T3) ↔ Station F (T2) PMS South only.
Transit Station A (T3) ↔ Station A (South) (T3) PMS South only.

Rolling stock

The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.

References


Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Changi Airport Skytrain [ VTE ]
Stations Station AStation A (South)Station BStation CStation DStation EStation F
Rolling Stock Adtranz C-100 (Former) • Mitsubishi Heavy Industries Crystal Mover