Changi Airport Skytrain

From SgWiki
Revision as of 10:20, 2 October 2017 by SG5999ZTT (talk | contribs) (→‎Stations: connection is not paid link)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
Changi Airport Skytrain
CAS Logo.png
Statistics
Status Operational
Stations 7
Services 5
Operator(s) Changi Airport Group
Rolling stock Crystal Mover
Line length 6.4 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport. Opened in 1990, it was the first auto-guided system in Asia.(1) The Changi Airport Skytrain operates from 0500 to 0230 daily and operates at 1 to 2 minute intervals.(2) Travel on the Skytrain is free and an inter-terminal journey takes about 90 seconds. All stations have platform screen doors, are air conditioned and have plasma displays indicating the arrival time of the next train.

With the opening of the Changi Airport station on 8 February 2002, the Skytrain is able to connect passengers at Terminal 1 to the MRT station entrances located at Terminals 2 and 3.(3)

Initially, the Skytrain rolling stock consisted of Bombardier Innovia APM 100s, jointly built by Westinghouse and Adtranz (acquired by Bombardier). In 2002, work began on a new S$135 million Mitsubishi Crystal Mover-based system to accommodate the planned opening of Terminal 3 and the projected increase in demand as the airport expands.(4)

The previous rolling stock of Bombardier Innovia APM 100 ran without a second carriage per train (as opposed to the current Mitsubishi Crystal Movers, which runs with two carriages per train), and the first two platform screen doors of each station were for emergency purposes (The Innovia APM 100s stopped at the outer half of each station, with two doors on each half.).

The third rail, formerly at the centre of the track, was moved to the side. The new system opened in March 2006 between Terminals 1 and 2 and opened the connection with Terminal 3 in November 2007 during Terminal 3's open house.

Stations

Station Terminal Destination Station Service
A Terminal 3 A South Transit
F Transit
A South Terminal 3 A Transit
B Terminal 3 C Public/Transit
E Public/Transit
C Terminal 1 B Public/Transit
D Terminal 1 E Public/Transit
E Terminal 2 B Public/Transit
D Public/Transit
F Terminal 2 A Transit

Between Terminal 3 Station B and Terminal 2 Station E was closed from 24 February 2015 till 2018 due to construction of Jewel Changi, and also upgrading to 3-car system at Terminal 3 Station B. To connect between Terminal 2 and 3, they need to connect above MRT paid link is at Basement 1.

Future Expansion

Plans are in place for future expansions of the system. These would include a 2-station single lane shuttle of about 500 m in length serving the southside of Terminal 2 from Station F, and a 4-station dual lane shuttle of about 1400 m to serve a future Terminal 4.(5)

Between Terminal 2 and 3, it will be upgraded from 2-car to 3-car system while Terminal 3 to Terminal 3 South will be upgraded from 1-car to 2-cars system. And will be purchased 6 trains upsized from 16 to 22 from a same train specification and will be purchased by 2019.

References

  1. "Singapore Changi Airport I, II, III". CPG Corporation.
  2. "Inter-terminal Transfer". Changi Airport.
  3. "Changi International Airport". National Library Board. 2001.
  4. "Milestones of Changi Airport". Changi Airport.
  5. "Singapore Changi Airport People Mover System". Archived from the original on 13 January 2006. Retrieved 2008-03-08.

Category Links

Template:Railway Lines in Singapore