Changi Airport Skytrain

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
Changi Airport Skytrain
CAS Logo.png
Statistics
Status Operational
Stations 7
Services 5
Operator(s) Changi Airport Group
Rolling stock Crystal Mover
Line length 6.4 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.

History

Date Event
1990 Terminal 1 - Terminal 2
March 2006 Replacement of C-100 trains to Crystal Movers
November 2007 Terminal 3
Opening of PMS South
24 February 2015 Suspension of PMS North (Terminal 2 - Terminal 3)
12 April 2019 Resumption of PMS North (Terminal 2 - Terminal 3)
1 May 2020 Temporary closure of Terminal 2 stations

Stations

Station Terminal Notes
Changi Airport Skytrain
A 3 Transit only
A (South) 3 Transit only
B 3 Linked to CG21Changi Airport
C 1
D 1
E 2 Linked to CG21Changi Airport
F 2 Transit only

Services

Type Ply Between Notes
Both Station D (T1) ↔ Station E (T2) PMS North only.
Both Station B (T3) ↔ Station C (T1) PMS North only.
Both Station B (T3) ↔ Station E (T2)
Transit Station A (T3) ↔ Station F (T2) PMS South only.
Transit Station A (T3) ↔ Station A (South) (T3) PMS South only.

Rolling stock

The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.

References


Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Changi Airport Skytrain [ VTE ]
Stations Station AStation A (South)Station BStation CStation DStation EStation F
Rolling Stock Adtranz C-100 (Former) • Mitsubishi Heavy Industries Crystal Mover