Difference between revisions of "Changi Airport station"

From SgWiki
Jump to navigation Jump to search
m
Line 44: Line 44:
|width=500|Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
|width=500|Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
|-
|-
|Platform A||{{EWL}}<br>{{Terminus|EWL|5|←}}
|Platform A||{{Terminus/EW4}} {{Terminus/Arrow|EWL|left}} {{Terminus/CG2}}
|-
|-
|colspan=2 class="platform"|Platform A/B
|colspan=2 class="platform"|Platform A/B
|-
|-
|Platform B||{{EWL}}<br>{{Terminus|EWL|5|←}}
|Platform B||{{Terminus/EW4}} {{Terminus/Arrow|EWL|left}} {{Terminus/CG2}}
|}
|}
</div>
</div>
<div class='dual'>
<div class='dual'>
==Exits==
==Exits==
{|class="wikitable" style="border-collapse:collapsed;text-align:center;"
{|class="wikitable" style="border-collapse:collapsed;text-align:center;"

Revision as of 10:51, 6 November 2018


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 28 April 2024, feeder bus service
    296
    will be introduced, plying between Tampines Int and Tampines North Dr 2 (Loop).

Please refer here for more information.

1

Changi Airport
樟宜机场
சாங்கி விமானநிலையம்
Changi Airport-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 70 Airport Boulevard
Singapore 819661
Line(s) East–West Line
Connections File:Bus Logo.png File:Taxi Logo.png Changi Airport Skytrain Airport
Abbreviation CGA

Changi Airport (CG2) is an underground Mass Rapid Transit (MRT) station on the East–West Line.

History

Date Event
8 February 2002 Station officially opens

Train services were initially operated as a through service from Boon Lay station when this station opened. However, to cut costs due to low ridership, it was reverted into shuttle service on 22 July 2003.

Station Planning

The earlier plans had long been made for a new line branching off from the existing East West Line at Tanah Merah station with some conceptual plans showing a tentative route alignment up to the airport and continuing towards the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.

The final plan involved building only the first two stations, namely Expo and Changi Airport. The alignment of the station at the airport has been switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station.

Layout

L2 Departure Hall Changi Airport, Changi Airport Skytrain
L1 Arrival Hall Changi Airport
M Linkbridge
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
Platform A Template:Terminus/EW4 Template:Terminus/Arrow Template:Terminus/CG2
Platform A/B
Platform B Template:Terminus/EW4 Template:Terminus/Arrow Template:Terminus/CG2

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Changi Airport Terminal 2
B Handicapped/disabled access Changi Airport Terminal 3

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service |}

Notes: Last connecting train to Tuas Link will depart at 23:18.

Bus

Changi Airport station/Alternate Bus Service

References


Template:East West Line