TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
CG2
Changi Airport
樟宜机场
சாங்கி விமானநிலையம்
Changi Airport-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 70 Airport Boulevard
Singapore 819661
Line(s) East–West Line
Structure Underground
Connections File:Bus Logo.png File:Taxi Logo.png Changi Airport Skytrain Airport
Abbreviation CGA

Changi Airport (CG2) is a Mass Rapid Transit (MRT) station on the East–West Line.

History

Date Event
8 February 2002 Station officially opened
7 July 2017 Station involved in Exercise Northstar 10 (Counter terrorism)[1]

Station Planning

The earlier plans had long been made for a new line branching off from the existing East–West Line at Tanah Merah station with some conceptual plans showing a tentative route alignment up to the airport and continuing towards the city along the east coast of the island.[2] However, the route alignment showed a deviation from previous plans. The final plan involved building only the first two stations, namely the Expo and Changi Airport stations, the underground station built between Terminal 2 and Terminal 3. The alignment of the station at the airport has been switched perpendicularly such that the station leads to two of the terminals directly from either end of the station.[3]

Initial trains operation

Train services were initially operated as a through service from Boon Lay station when this station opened. However, to cut costs due to ridership falling below expectations, the service was reverted into shuttle service on 22 July 2003.

2002 incident

On 24 July 2002, a glass panel of the atria wall shattered. The area was quickly closed off, but train services were not affected.[4]

2003 incident

On 24 September 2003, a man died at the station, apparently having fallen five stories from the departure hall.[5]

2020 track cracks

On 17 January 2020, SMRT had found a crack in the crossing near this station during inspection works in the morning. Trains have to be diverted to only one platform and have to travel at a slower speed as they approach the affected crossing.[6]

Layout

L3 Linkbridge to Jewel
Viewing Gallery
L2 Departure Hall Changi Airport, Changi Airport Skytrain
L1 Arrival Hall Changi Airport
M Linkbridge
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
APlatform CGEW4Tanah MerahCG1DT35ExpoCG2Changi Airport
Platform A/B
BPlatform CGEW4Tanah MerahCG1DT35ExpoCG2Changi Airport

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Changi Airport Terminal 2, Changi Airport Jewel, Changi Airport Skytrain
B Handicapped/disabled access Changi Airport Terminal 3, Changi Airport Jewel, Changi Airport Skytrain

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png East–West Line
CGEW4Tanah Merah 05:31 05:31 05:59 00:06

Bus

Bus Stop Exit Bus Service
95129 Changi Airport PTB2
24
27
34
36
53
110
858
95109 Changi Airport PTB3
24
27
34
36
53
110
858

References

Template:East West Line