Difference between revisions of "Circle Line"

From SgWiki
Jump to: navigation, search
m (History)
m
Line 1: Line 1:
 
{{Infobox/Line
 
{{Infobox/Line
 
|Line=CCL
 
|Line=CCL
 +
|Code={{Code|1|CCL|CC}}<br>
 
|Name=Circle Line<br>环线<br>சர்க்கிள் வரி
 
|Name=Circle Line<br>环线<br>சர்க்கிள் வரி
 
|Img=[[File:CCL Map.png|centre|300px]]
 
|Img=[[File:CCL Map.png|centre|300px]]

Revision as of 10:03, 13 November 2019


!
TRAVEL ADVISORY
!
SMRT East West Line: Train service between Pasir Ris and Tanah Merah stations will end at 11pm. Shuttle bus service is available. Several bus services will be extended to coincide with the last bus timing. Please refer here for more information.
Land Transport Authority SMRT: Due to Exercise Station Guard, please factor in an additional 10 minutes travelling time when entering or leaving Ang Mo Kio station. Please refer here for more information.
CC
Circle Line
环线
சர்க்கிள் வரி
CCL Map.png
Statistics
Status Operational
Termini Dhoby Ghaut
HarbourFront
Marina Bay
Stations 33 (3 U/C)
Services 2
Operator(s) SMRT
Rolling stock C830, C830C
Line length 35.5 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

Circle Line (CCL) is the fourth Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 60 minutes. The line is currently 35.5 km long with 30 stations and it is fully underground and automated.

History

Date Event
28 May 2009 Bartley - Marymount
17 April 2010 Dhoby Ghaut - Bartley
8 October 2011 Marymount - HarbourFront
14 January 2012 Promenade - Marina Bay

Nicoll Highway Collapse

On 20 April 2004 at 3.30pm, the construction site of the Nicoll Highway station collapsed. The collapse killed four people and injured three and caused the construction to be delayed for the Circle Line. As a result of the collapsed, the new Nicoll Highway station was shifted 100m away from the original site.

Circle Line Stage 6

On 17 January 2013, the Land Transport Authority announced Circle Line Stage 6 which will close the circle, running between Marina Bay and HarbourFront. It will be a 4 km extension.[1] On 29 October 2015, the LTA announced the 3 station locations for the 'Circle Line Stage 6'. The stations are Keppel Station, Cantonment Station and Prince Edward Road Station. Construction of the line is due for completion in 2025.[2]

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
Circle Line
CC1NS24NE6 Dhoby Ghaut Dhoby Ghaut-CCL.png Dhoby Ghaut Terminus
Interchange with North South Line and North East Line
CC2 Bras Basah Bras Basah-CCL.png Museum
CC3 Esplanade Esplanade-CCL.png Convention Centre
CC4DT15 Promenade Promenade-CCL.png Millenia Interchange with Downtown Line
CC5 Nicoll Highway Nicoll Highway-CCL.png Nicoll Highway
CC6 Stadium Stadium-CCL.png Boulevard Terminus (Circle Line Extension)
CC7 Mountbatten Mountbatten-CCL.png Old Airport Road
CC8 Dakota Dakota-CCL.png Tanjong Katong
CC9EW8 Paya Lebar Paya Lebar-CCL.png Paya Lebar Interchange with East West Line
CC10DT26 MacPherson MacPherson-CCL.png MacPherson Interchange with Downtown Line
CC11 Tai Seng Tai Seng-CCL.png Upper Paya Lebar
CC12 Bartley Bartley-CCL.png Bartley
CC13NE12 Serangoon Serangoon-CCL.png Serangoon Interchange with North East Line
CC14 Lorong Chuan Lorong Chuan-CCL.png Lorong Chuan
CC15NS17 Bishan Bishan-CCL.png Bishan Interchange with North South Line
CC16 Marymount Marymount-CCL.png Marymount
CC17TE9 Caldecott Caldecott-CCL.png Thomson Future Interchange with Thomson–East Coast Line
CC18 Bukit Brown Bukit Brown Reserved station. Not in Operation.
CC19DT9 Botanic Gardens Botanic Gardens-CCL.png Adam Interchange with Downtown Line
CC20 Farrer Road Farrer Road-CCL.png Farrer
CC21 Holland Village Holland Village-CCL.png Holland
CC22EW21 Buona Vista Buona Vista-CCL.png Buona Vista Interchange with East West Line
CC23 one-north One-north-CCL.png one-north
CC24 Kent Ridge Kent Ridge-CCL.png National University Hospital
CC25 Haw Par Villa Haw Par Villa-CCL.png West Coast
CC26 Pasir Panjang Pasir Panjang-CCL.png Pasir Panjang
CC27 Labrador Park Labrador Park-CCL.png Alexandra
CC28 Telok Blangah Telok Blangah-CCL.png Telok Blangah
CC29NE1 HarbourFront HarbourFront-CCL.png HarbourFront Terminus
Interchange with North East Line
Circle Line Stage 6
CC30 Keppel Keppel Under Construction
CC31 Cantonment Cantonment Under Construction
CC32 Prince Edward Road Prince Edward Under Construction
Circle Line Extension
CE1DT16 Bayfront Bayfront-CCL-DTL.png Bayfront Interchange with Downtown Line
CE2NS27TE20 Marina Bay Marina Bay-CCL.png Marina Bay Terminus
Interchange with North South Line
Future Interchange with Thomson–East Coast Line

Services

Service Starting Terminate at Notes
Full Dhoby Ghaut HarbourFront
Full HarbourFront Dhoby Ghaut
Full HarbourFront Marina Bay Operates during Peak Hours.
SWT HarbourFront Paya Lebar Operate during peak hours/after peak hours.
Full Stadium Marina Bay Operates during Off Peak Hours.
Full Marina Bay Stadium Operates during Off Peak Hours.
Full Marina Bay HarbourFront Operates during Peak Hours.
SWT/Special Marina Bay Caldecott Operates on days when major events held at National Stadium.

Rolling stock

The rolling stock consists of Alstom Metropolis C830 and Alstom Metropolis C830C trains. These trains operate from Kim Chuan Depot near Tai Seng station.

References

  1. "Circle Line Stage 6". Land Transport Authority.
  2. "Three new stations to close loop on Circle Line". TODAYonline. Retrieved 16 Jan 2016.
Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Current North South LineEast West LineNorth East LineCircle LineDowntown Line
Future Thomson–East Coast LineJurong Region LineCross Island Line
Rolling Stocks Current C151C151AC151BC151CC651C751AC751BC751CC830C830CC951
Future C851E • CJ151 • CR151 • CT251
Depots Current BishanChangiGali BatuKim ChuanSengkangUlu PandanTuas
Future MandaiEast Coast
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North South LineEast West LineNorth East LineCircle LineDowntown LineThomson–East Coast LineJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Others Changi Airport SkytrainSentosa Express
Defunct Sentosa Monorail (SDC)
Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL Stage 6: KeppelCantonmentPrince Edward Road
Circle Line Extension: PromenadeBayfrontMarina Bay
Rolling Stock C830C830C • C851E
Depots Kim Chuan