Difference between revisions of "Circle Line"

From SgWiki
Jump to navigation Jump to search
m (Changed protection level for "Circle Line" ([Edit=Allow only autoconfirmed users] (indefinite) [Move=Allow only autoconfirmed users] (indefinite)))
m
(12 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Infobox/Line
{{Infobox/Line
|TA=RCC
|Line=CCL
|Line=CCL
|Code={{Code|1|CCL|CC}}<br>
|Name=Circle Line<br>环线<br>சர்க்கிள் வரி
|Name=Circle Line<br>环线<br>சர்க்கிள் வரி
|Img=[[File:CCL Map.png|centre|300px]]
|Img=[[File:CCL Map.png|centre|300px]]
Line 10: Line 12:
  {{Infoline|Operator(s)|{{SMRT}}}}
  {{Infoline|Operator(s)|{{SMRT}}}}
  {{Infoline|Rolling stock|[[Alstom Metropolis C830|C830]], [[Alstom Metropolis C830C|C830C]]}}
  {{Infoline|Rolling stock|[[Alstom Metropolis C830|C830]], [[Alstom Metropolis C830C|C830C]]}}
  {{Infoline|Line length|35.5 km}}
  {{Infoline|Line length|34.6 km}}
  {{Infoline|Track gauge|1,435 mm standard gauge}}
  {{Infoline|Track gauge|1,435 mm standard gauge}}
  {{Infoline|Electrification|750V DC Third rail}}
  {{Infoline|Electrification|750V DC Third rail}}
}}
}}


'''Circle Line (CCL)''' is the fourth [[Mass Rapid Transit]] (MRT) line. Traveling from one end to the other takes about 60 minutes. The line is currently 35.5 km long with 30 stations and it is fully underground and automated.
'''Circle Line (CCL)''' is the fourth [[Mass Rapid Transit]] (MRT) line. Traveling from one end to the other takes about 60 minutes. The line is currently 34.6 km long with 30 stations and it is fully underground and automated.


==History==
==History==
Line 22: Line 24:
!width=150|Date!!Event
!width=150|Date!!Event
|-
|-
|28 May 2009||{{Stn|Bartley}} - {{STN|M|Marymount}}
|28 May 2009||{{Stn|Bartley}} - {{Stn|Marymount}}
|-
|-
|17 April 2010||{{Stn|Dhoby Ghaut}} - {{Stn|Bartley}}
|17 April 2010||{{Stn|Dhoby Ghaut}} - {{Stn|Bartley}}
|-
|-
||8 October 2011||{{STN|M|Marymount}} - {{Stn|HarbourFront}}
||8 October 2011||{{Stn|Marymount}} - {{Stn|HarbourFront}}
|-
|-
|14 January 2012||{{Stn|Promenade}} - {{Stn|Marina Bay}}
|14 January 2012||{{Stn|Promenade}} - {{Stn|Marina Bay}}
|-
|2025||{{Stn|HarbourFront}} - {{Stn|Marina Bay}}
|}
|}


Line 37: Line 37:


===Circle Line Stage 6===
===Circle Line Stage 6===
On 17 January 2013, the Land Transport Authority announced '''Circle Line Stage 6''' which will close the circle, running between {{Stn|Marina Bay}} and {{Stn|HarbourFront}}. It will be a 4 km extension.<ref>[http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/circle-line-6.html "Circle Line Stage 6"]. Land Transport Authority.</ref> On 29 October 2015, the LTA announced the 3 station locations for the 'Circle Line '''Stage 6''''. The stations are {{Stn|Keppel| Station}}, {{Stn|Cantonment| Station}} and {{Stn|Prince Edward| Station}}. Construction of the line is due for completion in 2025.<ref>[http://www.todayonline.com/singapore/circle-line-be-full-loop-2025-station-locations-extension-announced "Three new stations to close loop on Circle Line"]. TODAYonline. Retrieved 16 Jan 2016.</ref>
On 17 January 2013, the Land Transport Authority announced '''Circle Line Stage 6''' which will close the circle, running between {{Stn|Marina Bay}} and {{Stn|HarbourFront}}. It will be a 4 km extension.<ref>[http://www.lta.gov.sg/content/ltaweb/en/public-transport/projects/circle-line-6.html "Circle Line Stage 6"]. Land Transport Authority.</ref> On 29 October 2015, the LTA announced the 3 station locations for the 'Circle Line '''Stage 6''''. The stations are {{Stn|Keppel| Station}}, {{Stn|Cantonment| Station}} and {{Stn|Prince Edward Road| Station}}. Construction of the line is due for completion in 2025.<ref>[http://www.todayonline.com/singapore/circle-line-be-full-loop-2025-station-locations-extension-announced "Three new stations to close loop on Circle Line"]. TODAYonline. Retrieved 16 Jan 2016.</ref>


==Stations==
==Stations==
Line 61: Line 61:
{{Stnline|{{Code|2|CCL|CC15|NSL|NS17}}|Bishan|CCL|Bishan|Interchange with {{NSL}}}}
{{Stnline|{{Code|2|CCL|CC15|NSL|NS17}}|Bishan|CCL|Bishan|Interchange with {{NSL}}}}
{{Stnline|{{Code|1|CCL|CC16}}|Marymount|CCL}}
{{Stnline|{{Code|1|CCL|CC16}}|Marymount|CCL}}
{{Stnline|{{Code|2|CCL|CC17|TEL|TE9}}|Caldecott|CCL|Thomson|Future Interchange with {{TEL}}}}
{{Stnline|{{Code|2|CCL|CC17|TEL|TE9|S2=future}}|Caldecott|CCL|Thomson|Future Interchange with {{TEL}}}}
{{Stnline|{{Code|1|CCL|CC18}}|Bukit Brown|CCL|Bukit Brown|Reserved station. Not in Operation.|Img=}}
{{Stnline|{{Code|1|CCL|CC18|S1=future}}|Bukit Brown|CCL|Bukit Brown|Reserved station. Not in Operation.|Img=}}
{{Stnline|{{Code|2|CCL|CC19|DTL|DT9}}|Botanic Gardens|CCL|Adam|Interchange with {{DTL}}}}
{{Stnline|{{Code|2|CCL|CC19|DTL|DT9}}|Botanic Gardens|CCL|Adam|Interchange with {{DTL}}}}
{{Stnline|{{Code|1|CCL|CC20}}|Farrer Road|CCL|Farrer}}
{{Stnline|{{Code|1|CCL|CC20}}|Farrer Road|CCL|Farrer}}
Line 76: Line 76:
|-
|-
!colspan=5 class="CCL"|[[File:MRT000.png|18px|link=|alt=]] Circle Line Stage 6
!colspan=5 class="CCL"|[[File:MRT000.png|18px|link=|alt=]] Circle Line Stage 6
{{Stnline|{{Code|1|CCL|CC30}}|Keppel|CCL|Keppel|Under Construction|Img=}}
{{Stnline|{{Code|1|CCL|CC30|S1=future}}|Keppel|CCL|Keppel|Under Construction|Img=}}
{{Stnline|{{Code|1|CCL|CC31}}|Cantonment|CCL|Cantonment|Under Construction|Img=}}
{{Stnline|{{Code|1|CCL|CC31|S1=future}}|Cantonment|CCL|Cantonment|Under Construction|Img=}}
{{Stnline|{{Code|1|CCL|CC32}}|Prince Edward|CCL|Prince Edward|Under Construction|Img=}}
{{Stnline|{{Code|1|CCL|CC32|S1=future}}|Prince Edward Road|CCL|Prince Edward|Under Construction|Img=}}
|-
|-
!colspan=5 class="CCL"|[[File:MRT000.png|18px|link=|alt=]] Circle Line Extension
!colspan=5 class="CCL"|[[File:MRT000.png|18px|link=|alt=]] Circle Line Extension
{{Stnline|{{Code|2|CCL|CE1|DTL|DT16}}|Bayfront|CCL-DTL|Bayfront|Interchange with {{DTL}}}}
{{Stnline|{{Code|2|CCL|CE1|DTL|DT16}}|Bayfront|CCL-DTL|Bayfront|Interchange with {{DTL}}}}
{{Stnline|{{Code|3|CCL|CE2|NSL|NS27|TEL|TE20}}|Marina Bay|CCL|Marina Bay|Terminus<br>Interchange with {{NSL}}<br>Future Interchange with {{TEL}}}}
{{Stnline|{{Code|3|CCL|CE2|NSL|NS27|TEL|TE20|S3=future}}|Marina Bay|CCL|Marina Bay|Terminus<br>Interchange with {{NSL}}<br>Future Interchange with {{TEL}}}}
|}
|}


Line 97: Line 97:
|-
|-
|SWT|||{{Stn|HarbourFront}}||{{Stn|Paya Lebar}}||Operate during peak hours/after peak hours.
|SWT|||{{Stn|HarbourFront}}||{{Stn|Paya Lebar}}||Operate during peak hours/after peak hours.
|-
|SWT|||{{Stn|HarbourFront}}||{{Stn|Bartley}}||Operate after peak hours.
|-
|SWT|||{{Stn|Dhoby Ghaut}}||{{Stn|Tai Seng}}||Operate after peak hours.
|-
|-
|Full||{{Stn|Stadium}}||{{Stn|Marina Bay}}||Operates during Off Peak Hours.
|Full||{{Stn|Stadium}}||{{Stn|Marina Bay}}||Operates during Off Peak Hours.
Line 108: Line 112:


==Rolling stock==
==Rolling stock==
The rolling stock consists of [[Alstom Metropolis C830]] and [[Alstom Metropolis C830C]] trains. These trains operate from [[Kim Chuan Depot]] near {{STN|M|Tai Seng| station}}.
The rolling stock consists of [[Alstom Metropolis C830]] and [[Alstom Metropolis C830C]] trains. These trains operate from [[Kim Chuan Depot]] near {{Stn|Tai Seng| station}}.


==References==
==References==

Revision as of 10:33, 28 June 2020


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
1

Circle Line
环线
சர்க்கிள் வரி
CCL Map.png
Statistics
Status Operational
Termini Dhoby Ghaut
HarbourFront
Marina Bay
Stations 33 (3 U/C)
Services 2
Operator(s) SMRT
Rolling stock C830, C830C
Line length 34.6 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

Circle Line (CCL) is the fourth Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 60 minutes. The line is currently 34.6 km long with 30 stations and it is fully underground and automated.

History

Date Event
28 May 2009 Bartley - Marymount
17 April 2010 Dhoby Ghaut - Bartley
8 October 2011 Marymount - HarbourFront
14 January 2012 Promenade - Marina Bay

Nicoll Highway Collapse

On 20 April 2004 at 3.30pm, the construction site of the Nicoll Highway station collapsed. The collapse killed four people and injured three and caused the construction to be delayed for the Circle Line. As a result of the collapsed, the new Nicoll Highway station was shifted 100m away from the original site.

Circle Line Stage 6

On 17 January 2013, the Land Transport Authority announced Circle Line Stage 6 which will close the circle, running between Marina Bay and HarbourFront. It will be a 4 km extension.[1] On 29 October 2015, the LTA announced the 3 station locations for the 'Circle Line Stage 6'. The stations are Keppel Station, Cantonment Station and Prince Edward Road Station. Construction of the line is due for completion in 2025.[2]

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:MRT000.png Circle Line
3
Dhoby Ghaut Dhoby Ghaut-CCL.png Dhoby Ghaut Terminus
Interchange with North–South Line and North East Line
1
Bras Basah Bras Basah-CCL.png Museum
1
Esplanade Esplanade-CCL.png Convention Centre
2
Promenade Promenade-CCL.png Millenia Interchange with Downtown Line
1
Nicoll Highway Nicoll Highway-CCL.png Nicoll Highway
1
Stadium Stadium-CCL.png Boulevard Terminus (Circle Line Extension)
1
Mountbatten Mountbatten-CCL.png Old Airport Road
1
Dakota Dakota-CCL.png Tanjong Katong
2
Paya Lebar Paya Lebar-CCL.png Paya Lebar Interchange with East–West Line
2
MacPherson MacPherson-CCL.png MacPherson Interchange with Downtown Line
1
Tai Seng Tai Seng-CCL.png Upper Paya Lebar
1
Bartley Bartley-CCL.png Bartley
2
Serangoon Serangoon-CCL.png Serangoon Interchange with North East Line
1
Lorong Chuan Lorong Chuan-CCL.png Lorong Chuan
2
Bishan Bishan-CCL.png Bishan Interchange with North–South Line
1
Marymount Marymount-CCL.png Marymount
2
Caldecott Caldecott-CCL.png Thomson Future Interchange with Thomson–East Coast Line
1
Bukit Brown Bukit Brown Reserved station. Not in Operation.
2
Botanic Gardens Botanic Gardens-CCL.png Adam Interchange with Downtown Line
1
Farrer Road Farrer Road-CCL.png Farrer
1
Holland Village Holland Village-CCL.png Holland
2
Buona Vista Buona Vista-CCL.png Buona Vista Interchange with East–West Line
1
one-north One-north-CCL.png one-north
1
Kent Ridge Kent Ridge-CCL.png National University Hospital
1
Haw Par Villa Haw Par Villa-CCL.png West Coast
1
Pasir Panjang Pasir Panjang-CCL.png Pasir Panjang
1
Labrador Park Labrador Park-CCL.png Alexandra
1
Telok Blangah Telok Blangah-CCL.png Telok Blangah
2
HarbourFront HarbourFront-CCL.png HarbourFront Terminus
Interchange with North East Line
File:MRT000.png Circle Line Stage 6
1
Keppel Keppel Under Construction
1
Cantonment Cantonment Under Construction
1
Prince Edward Road Prince Edward Under Construction
File:MRT000.png Circle Line Extension
2
Bayfront Bayfront-CCL-DTL.png Bayfront Interchange with Downtown Line
3
Marina Bay Marina Bay-CCL.png Marina Bay Terminus
Interchange with North–South Line
Future Interchange with Thomson–East Coast Line

Services

Service Starting Terminate at Notes
Full Dhoby Ghaut HarbourFront
Full HarbourFront Dhoby Ghaut
Full HarbourFront Marina Bay Operates during Peak Hours.
SWT HarbourFront Paya Lebar Operate during peak hours/after peak hours.
SWT HarbourFront Bartley Operate after peak hours.
SWT Dhoby Ghaut Tai Seng Operate after peak hours.
Full Stadium Marina Bay Operates during Off Peak Hours.
Full Marina Bay Stadium Operates during Off Peak Hours.
Full Marina Bay HarbourFront Operates during Peak Hours.
SWT/Special Marina Bay Caldecott Operates on days when major events held at National Stadium.

Rolling stock

The rolling stock consists of Alstom Metropolis C830 and Alstom Metropolis C830C trains. These trains operate from Kim Chuan Depot near Tai Seng station.

References

  1. "Circle Line Stage 6". Land Transport Authority.
  2. "Three new stations to close loop on Circle Line". TODAYonline. Retrieved 16 Jan 2016.
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL6KeppelCantonmentPrince Edward Road
Circle Line ExtensionPromenadeBayfrontMarina Bay
Rolling Stock 830830C851E
Depots Kim Chuan
Others Bridging Service