Difference between revisions of "Coral Edge station"

From SgWiki
Jump to navigation Jump to search
m
Line 57: Line 57:
!width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily
!width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily
|-
|-
!colspan=5 style="{{CSS/SKLRT|s=|t=}}text-align:center;"|{{Icon|LRT|W|20px|d=inline}} {{PGLRT|style={{CSS/PGLRT|bg=none|s=|t=}}}}
!colspan=5 style="{{CSS/PGLRT|s=|t=}}text-align:center;"|{{Icon|LRT|W|20px|d=inline}} {{PGLRT|style={{CSS/PGLRT|bg=none|s=|t=}}}}
{{Timing|PTC||05:28|05:28|05:48|00:28|nv=}}
{{Timing|PTC||05:28|05:28|05:48|00:28|nv=}}
{{Timing|PTC|PE7|05:30|05:30|05:50|00:45}}
{{Timing|PTC|PE7|05:30|05:30|05:50|00:45}}

Revision as of 16:33, 5 May 2022


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
PE3
Coral Edge
珊瑚
கோரல் எட்ஜ்
Coral Edge-PGLRT.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 70 Punggol Field
Singapore 828856
Line(s) Punggol LRT
Structure Elevated
Connections Bus

Coral Edge (PE3) is a Light Rail Transit (LRT) station on the Punggol LRT.

History

Date Event
29 January 2005 Station officially opened

2020 track cracks

On 9 January 2020, at around 2.15pm, a crack was spotted on one of the elevated concrete slabs — known as plinths — on which the train run on. The “isolated” crack was located between Coral Edge and Riviera stations. One platform has been closed early from 9pm to 4am for urgent maintenance, while operations continue as trains run on other platforms.[1]

Layout

L3
1Platform Service D: PE3Coral EdgePE4RivieraPE7DamaiPTCNE17Punggol
Platform 1/2
2Platform Service C: PTCNE17PunggolPE2MeridianPE3Coral Edge
L2 Concourse Faregates, Ticketing Machines
L1 Street Level Punggol Plaza

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Punggol Field
B Handicapped/disabled access Punggol Field, Punggol Plaza, Punggol 21 Community Centre

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
icon Punggol LRT
PTCPunggol 05:28 05:28 05:48 00:28
PTCPunggol
   via PE7Damai
05:30 05:30 05:50 00:45

Bus

Bus Stop Exit Bus Service
Coral Edge Stn Exit A icon65179
Punggol Field
A
3
62
83
381
666
Coral Edge Stn Exit B icon65171
Punggol Field
B
3
6N
62
83
381
386
666

References

icon Punggol LRT [ VTE ]
Stations Punggol
East LoopCoveMeridianCoral EdgeRivieraKadaloorOasisDamai
West LoopSam KeeTeck LeePunggol PointSamuderaNibongSumangSoo Teck
Rolling Stock 810810A810D
Depots Sengkang
Others Punggol LRT Bridging Service