Difference between revisions of "Cross Island Line"

From SgWiki
Jump to navigation Jump to search
m (Link again.)
m
Line 1: Line 1:
{{Infobox Line
{{Infobox/Line
| Name E= Cross Island Line
|Name=Cross Island Line
| Name C= 跨岛线
|Info=
| Name T=  
{{Infoline|Status|Under Planning}}
| Image=
| Image Description=
| Type= Rapid transit
| System= [[Mass Rapid Transit]]
| Status= Under planning
| Termini= {{TBC|TBA}}
| Stations= {{TBC|TBA}}
| Services= {{TBC|TBA}}
| Date O= 2030
| Date C=
| Owner= Land Transport Authority
| Operator= {{TBC|TBA}}
| Rolling stock= {{TBC|TBA}}
| Length= 52 km
| Track gauge= {{TBC|TBA}}
| Electrification= {{TBC|TBA}}
}}
}}


The '''Cross Island Line (CRL)''' will be the eighth [[Mass Rapid Transit]] line in Singapore. The line will be 50 km long and is expected to begin service in 2030.<ref name="JRL1">[http://app.mot.gov.sg/News_Centre/Latest_News/NewsID/6559AFFF0C92B236/Speech_by_Mr_Lui_Tuck_Yew_Minister_for_Transport_at_visit_to_DTL1_Chinatown_Station_17_January_2013.aspx "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 Jan 2013]</ref>
'''Cross Island Line (CRL)''' will be the eighth [[Mass Rapid Transit]] line in Singapore. The line will be 50 km long and is expected to begin service in 2030.<ref>[http://app.mot.gov.sg/News_Centre/Latest_News/NewsID/6559AFFF0C92B236/Speech_by_Mr_Lui_Tuck_Yew_Minister_for_Transport_at_visit_to_DTL1_Chinatown_Station_17_January_2013.aspx "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 Jan 2013]</ref>
 
As the name implies, the line connects Changi to Loyang, Pasir Ris, Hougang, Ang Mo Kio, Bukit Timah, Clementi, West Coast and Jurong.<ref name="JRL1"/>
 
==History==
It was first announced in January 2013.
 
The Nature Society (Singapore) (NSS) has opposed the Cross Island MRT Line cutting through nature reserves and has proposed an alternative route that cuts southwards via Lornie Road around the reserve. The line was depicted to cut through the Central Catchment Nature Reserve near MacRitchie Reservoir. The alignment cuts directly under primary forest and regrowth forests over a century old, according to maps in the position paper. The NSS said its concerns relate to the degradation of forest habitats from soil investigation and related engineering works that will be required above-ground. Surface works are expected to result in forest clearance, compaction of soil along the rail line's alignment, toxic material spillage and siltation that will seriously damage one of the two most pristine stream ecosystems in the reserve. The society's proposed alternate route will add 1.7 kilometres to 2 kilometres to the Cross Island Line, and an estimated four minutes' additional travel time. [http://www.channelnewsasia.com/news/singapore/nature-society-proposes/749418.html]


==References==
==References==
<references/>  
<references/>


==Related Links==
{{Mass Rapid Transit}}
{{Mass Rapid Transit}}
{{Railway Lines in Singapore}}
{{Railway Lines in Singapore}}


[[Category:Mass Rapid Transit Lines]]
[[Category:Mass Rapid Transit Lines]]

Revision as of 23:14, 13 September 2017


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 28 April 2024, feeder bus service
    296
    will be introduced, plying between Tampines Int and Tampines North Dr 2 (Loop).

Please refer here for more information.

Cross Island Line
Statistics
Status Under Planning

Cross Island Line (CRL) will be the eighth Mass Rapid Transit line in Singapore. The line will be 50 km long and is expected to begin service in 2030.[1]

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah

Template:Railway Lines in Singapore