Difference between revisions of "Cross Island Line"

From SgWiki
Jump to navigation Jump to search
m (Undo revision 440529 by Usurpation (talk))
(13 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Infobox Line
{{Infobox/Line
| Name E= Cross Island Line
|Line=CRL
| Name C= 跨岛线
|Name=Cross Island Line<br>跨岛线<br>குறுக்கு தீவு வரி
| Name T=  
|Info=
| Image=
{{Infoline|Status|Under Planning}}
| Image Description=
{{Infoline|Termini|{{Stn|Aviation Park}}<br>{{Stn|Bright Hill}}}}
| Type= Rapid transit
{{Infoline|Stations|12}}
| System= [[Mass Rapid Transit (Singapore)]]
{{Infoline|Line length|29 km}}
| Status= Planning
| Termini=
| Stations=
| Services=
| Date O= 2030
| Date C=
| Owner= Land Transport Authority
| Operator=
| Rolling stock=
| Length= 52 km
| Track gauge=
| Electrification=
}}
}}


The '''Cross Island Line (CRL)''' will be the nineth [[Mass Rapid Transit (Singapore)|Mass Rapid Transit (MRT)]] line in Singapore. The line will be 50 km long and is expected to begin service in 2030.<ref name="JRL1">[http://app.mot.gov.sg/News_Centre/Latest_News/NewsID/6559AFFF0C92B236/Speech_by_Mr_Lui_Tuck_Yew_Minister_for_Transport_at_visit_to_DTL1_Chinatown_Station_17_January_2013.aspx "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 Jan 2013]</ref>
'''Cross Island Line (CRL)''' will be the eighth [[Mass Rapid Transit]] line in Singapore. The line will be 50 km long when fully constructed and is expected to begin service in 2029.<ref>[http://app.mot.gov.sg/News_Centre/Latest_News/NewsID/6559AFFF0C92B236/Speech_by_Mr_Lui_Tuck_Yew_Minister_for_Transport_at_visit_to_DTL1_Chinatown_Station_17_January_2013.aspx "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 Jan 2013]</ref>


As the name implies, the line connects Changi to Loyang, Pasir Ris, Hougang, Ang Mo Kio, Bukit Timah, Clementi, West Coast and Jurong.<ref name="JRL1"/>
==Stations==
 
{| class="wikitable"
==History==
|-
It was first announced in January 2013.
!class="LTA"|Alpha-Numeric<br>Code!!class="LTA"|Station Name!!class="LTA"|Image!!class="LTA"|Working names!!class="LTA"|Notes
 
|-
The Nature Society (Singapore) (NSS) has opposed the future Cross Island MRT Line cutting through nature reserves and has proposed an alternative route that cuts southwards via Lornie Road around the reserve. Plans for a 50-kilometre Cross Island Line were announced by the Government in January this year, where the underground line was depicted to cut through the Central Catchment Nature Reserve near MacRitchie Reservoir. The alignment cuts directly under primary forest and regrowth forests over a century old, according to maps in the position paper. The NSS said its concerns relate to the degradation of forest habitats from soil investigation and related engineering works that will be required above-ground. Surface works are expected to result in forest clearance, compaction of soil along the rail line's alignment, toxic material spillage and siltation that will seriously damage one of the two most pristine stream ecosystems in the reserve. The society's proposed alternate route will add 1.7 kilometres to 2 kilometres to the Cross Island Line, and an estimated four minutes' additional travel time. [http://www.channelnewsasia.com/news/singapore/nature-society-proposes/749418.html]
!colspan=5 class="CRL"|[[File:MRT000.png|18px|link=|alt=]] Cross Island Line Stage 1
{{Stnline|{{Code|1|CRL|CR2}}|Aviation Park|CRL|Aviation Park|Terminus|Img=}}
{{Stnline|{{Code|1|CRL|CR3}}|Loyang|CRL|Img=}}
{{Stnline|{{Code|1|CRL|CR4}}|Pasir Ris East|CRL|Img=}}
{{Stnline|{{Code|2|CRL|CR5|EWL|EW1}}|Pasir Ris|CRL|Pasir Ris|Interchange with {{EWL}}|Img=}}
{{Stnline|{{Code|1|CRL|CR6}}|Tampines North|CRL|Img=}}
{{Stnline|{{Code|1|CRL|CR7}}|Defu|CRL|Img=}}
{{Stnline|{{Code|2|CRL|CR8|NEL|NE14}}|Hougang|CRL|Hougang|Interchange with {{NEL}}|Img=}}
{{Stnline|{{Code|1|CRL|CR9}}|Serangoon North|CRL|Img=}}
{{Stnline|{{Code|1|CRL|CR10}}|Tavistock|CRL|Img=}}
{{Stnline|{{Code|2|CRL|CR11|NSL|NS16}}|Ang Mo Kio|CRL|Ang Mo Kio|Interchange with {{NSL}}|Img=}}
{{Stnline|{{Code|1|CRL|CR12}}|Teck Ghee|CRL|Img=}}
{{Stnline|{{Code|2|CRL|CR13|TEL|TE7}}|Bright Hill|CRL|Bright Hill|Terminus<br>Interchange with {{TEL}}|Img=}}
|}


==References==
==References==
<references/>  
<references/>


==Related Links==
{{Mass Rapid Transit}}
{{Mass Rapid Transit}}
{{Railway Lines in Singapore}}
{{Cross Island Line}}
 
[[Category:Mass Rapid Transit Lines]]

Revision as of 19:02, 16 February 2019


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
Cross Island Line
跨岛线
குறுக்கு தீவு வரி
Statistics
Status Under Planning
Termini Aviation Park
Bright Hill
Stations 12
Line length 29 km

Cross Island Line (CRL) will be the eighth Mass Rapid Transit line in Singapore. The line will be 50 km long when fully constructed and is expected to begin service in 2029.[1]

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:MRT000.png Cross Island Line Stage 1
1
Aviation Park Aviation Park Terminus
1
Loyang Loyang
1
Pasir Ris East Pasir Ris East
2
Pasir Ris Pasir Ris Interchange with East–West Line
1
Tampines North Tampines North
1
Defu Defu
2
Hougang Hougang Interchange with North East Line
1
Serangoon North Serangoon North
1
Tavistock Tavistock
2
Ang Mo Kio Ang Mo Kio Interchange with North–South Line
1
Teck Ghee Teck Ghee
2
Bright Hill Bright Hill Terminus
Interchange with Thomson–East Coast Line

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah
icon Cross Island Line [ VTE ]
Stations Aviation ParkLoyangPasir Ris EastPasir RisTampines NorthDefuHougangSerangoon NorthTavistockAng Mo KioTeck GheeBright HillTurf CityKing Albert ParkMajuClementiWest CoastJurong Lake District
Punggol ExtensionPasir RisEliasRivieraPunggol
Rolling Stock CCR151
Depots Changi East
Others Cross Island Line Bridging Service