Difference between revisions of "Dhoby Ghaut station"

From SgWiki
Jump to: navigation, search
(Adding Full Day Short-Trip Bus Service)
m
Line 56: Line 56:
 
|-
 
|-
 
!rowspan=5|B3
 
!rowspan=5|B3
|Platform A
+
|Platform A||{{RailRoute/2|NSL|right|{{Code|3|NSL|NS24|NEL|NE6|CCL|CC1}}<br>{{Stn|Dhoby Ghaut}}|{{NS9}}|{{NS1}}}}
|class="Advisory train not 180519 190519 200519"|{{RailRoute/2|NSL|right|{{Code|3|NSL|NS24|NEL|NE6|CCL|CC1}}<br>{{Stn|Dhoby Ghaut}}|{{NS9}}|{{NS1}}}}
 
|class="Advisory train 180519 190519"|{{RailRoute/1|NSL|right|{{Code|3|NSL|NS24|NEL|NE6|CCL|CC1}}<br>{{Stn|Dhoby Ghaut}}|{{Code|1|NSL|NS13}}<br>{{Stn|Yishun}}}}
 
|class="Advisory train 200519"|{{RailRoute/1|NSL|right|{{Code|3|NSL|NS24|NEL|NE6|CCL|CC1}}<br>{{Stn|Dhoby Ghaut}}|{{Code|1|NSL|NS16}}<br>{{Stn|Ang Mo Kio}}}}
 
 
|-
 
|-
 
|colspan=2 class="platform"|Platform A/B
 
|colspan=2 class="platform"|Platform A/B

Revision as of 15:54, 23 May 2019


!
TRAVEL ADVISORY
!
North South Line: Canberra MRT station will commence operation on 2 November 2019. Please refer here for more information.
East West Line: Train service between Tanah Merah and Bugis stations will end at 11pm due to track maintenance and upgrading works. Rail Bridging Service (Shuttle 6) are available during the early closure. Certain bus service will be extended to coincide with the last shuttle bus timing.
SBS Transit: From 16 June 2019, Bus Service 402 will be withdrawn and merged with Bus Service 400. Please refer here for more information.
SMRT Buses: From 16 June 2019, Bus Service NR7 will be withdrawn. Affected Commuters are advised to seek alternative transport. Please refer here for more information.
SBS Transit: From 23 June 2019, Bus Service 52, 74, 93 and 852 will be amended to ply Lornie Highway (Northbound). Please refer here for more information.
SBS Transit: From 23 June 2019, Bus Service 80 will be amended to ply Cantonment Link and Cantonment Rd towards Sengkang Interchange and will call at a new bus stop along Hoe Chiang Road towards HarbourFront Interchange. Please refer here for more information.
SBS Transit: From 23 June 2019, Bus Service 145 will call at a new bus stop along Hoe Chiang Road, in front of Tower 15 towards Buona Vista Terminal. Please refer here for more information.
SMRT Buses: From 23 June 2019, Bus Service 901M will be introduced between Woodlands Temp Int and Woodlands Ave 7 (Loop). Please refer here for more information.
Tower Transit: From 23 June 2019, Bus Service 66 will be amended to ply Bukit Batok East/West Avenue 6 instead of Bukit Batok East/West Avenue 3. Please refer here for more information.
NS24NE6CC1
Dhoby Ghaut
多美歌
டோபி காட்
Dhoby Ghaut-NSL.png
Dhoby Ghaut-NEL.png
Dhoby Ghaut-CCL.png
Statistics
Address 11 Orchard Road
60 Orchard Road
13 Orchard Road
Singapore 238826/238889/238893
Line(s) North South Line
North East Line
Circle Line
Connections Bus Taxi
Abbreviation DBG

Dhoby Ghaut (NS24/NE6/CC1) is an underground Mass Rapid Transit (MRT) station on the North South Line, the North East Line and the Circle Line. It is the largest MRT station in Singapore and is the first to be equipped with travellators due to its large size.

It is the third deepest MRT station with the deepest point at 28 metres below ground level.

History

Date Event
12 December 1987 Station officially opens
20 June 2003 Station interchanges with North East Line
8 January 2006 Exercise Northstar V
17 April 2010 Station interchanges with Circle Line

2011 Train disruptions

This station was part of 2011 MRT train disruptions on 15 and 17 December 2011, caused by a misalignment between the trains' current collector shoes, which collect power from the third rail, and the third rail itself. These were Singapore's two largest MRT disruptions at the time of occurrence.[1][2][3][4]

Art in Transit

Interchange by Milenko and Delia Prvacki can be found on the station walls along the linkway between North South Line and North East Line.

Singaporean artist Baet Yoke Kuan created a three dimensional relief work on the large columns that support the Circle Line sector of the station, inspired by the concept 'man and the environment'.

Layout

L1 Street Level Plaza Singapura
B1 Dhoby Xchange
B2 NSL Concourse Faregates, Ticketing Machines, Passenger Service Centre
NEL Concourse Faregates, Ticketing Machines, Passenger Service Centre
Transfer Linkway between North South Line Concourse, Circle Line Concourse and Transfer Hall
B3 Platform A
NS24NE6CC1
Dhoby Ghaut
NS9
Woodlands
NS1EW24
Jurong East
Platform A/B
Platform B
NS28
Marina South Pier
NS24NE6CC1
Dhoby Ghaut
CCL Concourse Faregates, Ticketing Machines, Passenger Service Centre
Transfer Hall between North East Line Platforms and Transfer Linkway
B4 Platform B
CC29NE1
HarbourFront
CC15NS17
Bishan
CC1NS24NE6
Dhoby Ghaut
Platform A/B
Platform A
CC29NE1
HarbourFront
CC15NS17
Bishan
CC1NS24NE6
Dhoby Ghaut
B5 Platform A
NE6NS24CC1
Dhoby Ghaut
NE1CC29
HarbourFront
Platform A/B
Platform B
NE17PTC
Punggol
NE6NS24CC1
Dhoby Ghaut

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Handy Road
B Handicapped/disabled access Penang Road
C Handicapped/disabled access Plaza Singapura, Istana
D Handicapped/disabled access Plaza Singapura
E Handicapped/disabled access The [email protected]
F Handicapped/disabled access Oldham Lane, Macdonald House, Orchard Road

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
North South Line
NS1 Jurong East 06:07 06:07 06:32 23:57
NS7 Kranji 00:13
NS28 Marina South Pier 05:52 05:52 06:17 23:50
NS27 Marina Bay 23:54
North East Line
NE1 HarbourFront 06:06 06:05 06:26 23:52
NE17 Punggol 05:54 06:10 06:29 00:04
Circle Line
CC29 HarbourFront 05:37 05:37 06:05 22:48
CC26 Pasir Panjang 23:18
CC23 one-north 23:34
CC17 Caldecott 00:02
CC11 Tai Seng 00:10

Bus

Bus Stop Exit Bus Service
(08031) Dhoby Ghaut Stn B
7
7A
14
14e
16
36
65
77
106
111
124
128
162
162M
167
167e
171
174
174e
175
190
652
656
660
663
665
700
700A
850E
951E
971E
972
(08057) Dhoby Ghaut Stn E/F
1N
2N
3N
4N
5N
6N
7
14
14e
16
36
77
106
111
124
128
162
162M
167
167e
171
174
174e
175
190
502
502A
518
518A
652
656
660
663
665
700
700A
850E
951E
971E
972
NR6
NR7
(08058) Aft Dhoby Ghaut Stn E/F
64
65
139
NR6
NR7

References

  1. "Singapore's MRT Breakdown Chaos Leaves Thousands Stranded". Ignatius Low (The Straits Times, 16 December 2011). Retrieved 3 November 2012.
  2. "MRT breaks down again". Channel NewsAsia Retrieved 17 December 2011.
  3. "North-South Line service resumes after 7-hour disruption". Channel NewsAsia. Retrieved 17 December 2011.
  4. "Service disruption on North-South Line on 17 Dec 2011". SMRT Cooperation.
North South Line [ VTE ]
Stations Jurong EastBukit BatokBukit GombakChoa Chu KangYew TeeKranjiMarsilingWoodlandsAdmiraltySembawangCanberraYishunKhatibYio Chu KangAng Mo KioBishanBraddellToa PayohNovenaNewtonOrchardSomersetDhoby GhautCity HallRaffles PlaceMarina BayMarina South Pier
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots BishanUlu Pandan
North East Line [ VTE ]
Stations HarbourFrontOutram ParkChinatownClarke QuayDhoby GhautLittle IndiaFarrer ParkBoon KengPotong PasirWoodleighSerangoonKovanHougangBuangkokSengkangPunggol
North East Line extension: Punggol Coast
Rolling Stock C751AC751C • C851E
Depots Sengkang
Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL Stage 6: KeppelCantonmentPrince Edward Road
Circle Line Extension: PromenadeBayfrontMarina Bay
Rolling Stock C830C830C • C851E
Depots Kim Chuan