Difference between revisions of "Facilities on the Mass Rapid Transit"

From SgWiki
Jump to navigation Jump to search
m
(3 intermediate revisions by 3 users not shown)
Line 1: Line 1:
The '''Mass Rapid Transit''' system is the rapid transit system in Singapore.
Stations on the [[Mass Rapid Transit]] are either elevated or underground (with the exception of [[Bishan station]]), which have two classifications of areas, ''paid'' and ''unpaid'' areas, which allow the rail operators to collect fares by restricting entry between the areas through faregates.


==Station layout==
Each stations has a concourse level and one or more platform levels. The concourse level consists of faregates, ticketing machine, passenger service centre, toilet and retail shop. Both the concourse and platform levels consist of display travel that inform commuters of the next arriving train. Stairs, Escalators and Lift connect between the two level.
MRT stations are  either above-ground or underground. Stations have two classifications of areas, ''paid'' and ''unpaid'' areas, which allow the rail operators to collect fares by restricting entry between the areas only through the fare gates, also known as ''access control gates''. Commuters enter the paid area in order to board a train; and must enter the unpaid area in order to access the street, and must therefore pass through the gates. These gates, connected to a computer network, are capable of reading and updating electronic tickets capable of storing data, and can store information such as the initial and destination stations and the duration for each trip. [[Fare and Ticketing|Fares]] are collected on the basis of this information.


A typical station has a concourse level and one or more platform levels. The concourse level consists of the ticketing machines and the access control gates between the paid and unpaid areas. Tickets are presented at these gates in order to pass between the unpaid and paid areas. Escalators and stairs providing access to the platform level are located only within the paid area. The platform level is where passengers board and alight from the trains. Most of the time this consists of one actual platform island with two sets of tracks for opposite directions running on either side. Except for {{Stn|Changi Airport| station}}, the concourse level and the platform levels are separate levels. Escalators and stairs between the concourse and platform levels, as well as the concourse level to the street level if necessary. Most stations have only one platform level. However, cross-platform interchange stations have two or more platform levels, one for each train line. These extra levels, together with the linkways connecting between them, make interchange stations to have more levels than a typical station that serves only one line.
==Passenger Information System==
 
In above-ground stations where trains run on viaducts, the concourse level can be either be located on the ground level or on the second level, with the platform level above it. When the concourse level is on the second level, a pedestrian overpass may sometimes link the unpaid area of this level to another prominent building nearby, such as a polytechnic. In underground stations, the concourse level is typically an underground level, with the platform levels below it. For most underground stations where the concourse level is underground, there will be pedestrian underpasses that lead to street access on top of the station area or basement levels of neighbouring buildings. Some stations, particularly interchange stations, are deep enough to be shielded from conventional bomb attacks from the air and act as bomb shelters. This status is enhanced by the fact that underground MRT systems have prebuilt ventilation systems with air-conditioning to ensure a degree of comfort in the unlikely event of a conventional air assault.
 
Most stations have island platforms, although {{Stn|Braddell}} and {{Stn|Dover}} have side platforms. This is because island platforms are seen to be less costly than side platforms. Also, all stations are made to be as straight as possible because the degree that trains would turn at when approaching and leaving a station would be too great if curved stations were built. A good example of this engineering defect is seen at Mong Kok East Station in Hong Kong, where Platform 1 of this station (to the left if travelling to the Hong Kong-China border) is curved and the gaps are wide. Trains also risk being scratched depending on how it enters the station.
 
==Facilities and services==
All stations have General Ticketing Machines (GTMs), at least 1 Passenger Service Centre, payphones, toilets, LED displays and plasma display (showing the time, date, train service information, safety messages and commercials), located within the unpaid area of the concourse level. Some stations however, such as the underground {{Stn|Somerset| station}}, have toilets located at street level instead.
 
Most stations have commercial space set aside for supermarkets, convenience stores, kiosks, Automatic Teller Machines (ATMs) and self-service automated kiosks for a myriad of services. Plans are currently underway to increase the amount of commercial space at many SMRT Corporation stations as part of SMRT Corporation's efforts to raise rental revenue from the leasing of commercial space in its stations to help in the defraying operating costs.<sup>[citation needed]</sup> Selected stations, located in areas of higher commuter traffic, will be rebranded as Xchanges.
* {{Stn|Raffles Place| station}} Raffles Xchange
* {{Stn|Dhoby Ghaut| station}} Dhoby Xchange
* {{Stn|Choa Chu Kang| station}} Choa Chu Kang Xchange
* {{Stn|Tanjong Pagar| station}} Tanjong Pagar Xchange
* {{Stn|Boon Lay| station}} Boon Lay Xchange
* {{Stn|Buona Vista| station}} Buona Vista Xchange
* {{Stn|Tampines| station}} Tampines Xchange
* {{Stn|Esplanade| station}} Esplanade Xchange
* {{Stn|Woodlands| station}} Woodlands Xchange
* {{Stn|Orchard| station}} Orchard Xchange
* {{Stn|Bukit Batok| station}} Bukit Batok Xchange (Future)
A listing of retail outlets located at the above Xchanges is available at the [http://www.shoppingatsmrt.com.sg].
 
MediaCorp's ''Today'' newspaper and Singapore Press Holding's ''my paper'' are distributed at most stations every morning. An afternoon edition of the ''Today'' newspaper is also distributed at selected stations within the Central Business District, such as {{Stn|City Hall| station}} and {{Stn|Tanjong Pagar| station}} in the afternoons.
 
==Past facilities==
===Televisions===
In stations along the Woodlands Extension from its opening date, television units were installed along the platform and these show simulcast feeds from the local free to air stations. These were removed in later years.
 
===Music===
Piped in music was initially played at station concourses in the late 1990s. They have been removed since.  Some stations also have advertising billboards which advertise artiste albums. This billboards are usually accompanied with a DVD set which also play musics.
 
===Air Fresheners===
Lemon scented air fresheners were initially added to the airconiditioning systems in trains. They have since been removed.
 
==Passenger information system==
===Flip Dot Electronic Displays in stations===
===Flip Dot Electronic Displays in stations===
Initially, the MRT system used green coloured flip dot electronic displays on the North-South Line and East-West Line from 1987 until 2002. The displays announced a train's terminating station when it arrives (or otherwise, a "Do Not Board" warning), although the disadvantage was that it could not tell the duration of a train's arrival time (e.g. the train will arrive at Jurong East Station in 2 mins). The second generation of such displays installed at stations along the Woodlands Extension featured a slightly updated version where the time till the next train arrival would be displayed from 3 minutes prior to the train's arrival. They were eventually replaced by plasma displays in 2002.
Initially, the MRT system used green coloured flip dot electronic displays on the [[North South Line]] and [[East West Line]] from 1987 until 2002. The displays announced a train's terminating station when it arrives (or otherwise, a "Do Not Board" warning), although the disadvantage was that it could not tell the duration of a train's arrival time (e.g. the train will arrive at [[Jurong East station]] in 2 mins). The second generation of such displays installed at stations along the Woodlands Extension featured a slightly updated version where the time till the next train arrival would be displayed from 3 minutes prior to the train's arrival. They were eventually replaced by plasma displays in 2002.


===Plasma Displays in stations===
===Plasma Displays in stations===
Singapore to utilises plasma displays in metro stations to display train service information. Critics have opposed the use of plasma displays as they are considerably more expensive to install and are susceptible to the problem of screen burn. However, the rail operators see this as a medium to earn advertising revenue from commercials shown on these displays. At the same time, they are able to display all the train service information, safety messages and time and date on these screens clearly. Using the flip dot system previously, only a limited amount of information could be displayed.
Singapore to utilises plasma displays in metro stations to display train service information. Critics have opposed the use of plasma displays as they are considerably more expensive to install and are susceptible to the problem of screen burn. However, the rail operators see this as a medium to earn advertising revenue from commercials shown on these displays. At the same time, they are able to display all the train service information, safety messages and time and date on these screens clearly. Using the flip dot system previously, only a limited amount of information could be displayed.


''Plasma Displays by Conrac'' are installed in stations along the {{NSL}} & {{EWL}}. 2 plasma displays are installed at a single location per platform. The reason for the installation of only 2 plasma displays at a single location per platform was because these displays had been retrofitted into the platforms when they replaced the aging flip dot displays which were only sited at 1 location per platform. Thus, the existing infrastructure available could only support plasma displays at 1 location per platform.
''Plasma Displays by Conrac'' are installed in stations along the [[North South Line|North South]] [[East West Line|East West]] Lines. 2 plasma displays are installed at a single location per platform. The reason for the installation of only 2 plasma displays at a single location per platform was because these displays had been retrofitted into the platforms when they replaced the aging flip dot displays which were only sited at 1 location per platform. Thus, the existing infrastructure available could only support plasma displays at 1 location per platform.


''Plasma Displays by Advanced System Asia (ADV)'' are installed at the concourse levels of stations along the {{NEL}}. These were the first generation of plasma displays installed in these stations. However, the normal Mean Time Between Failures (MTBF) for plasma displays is about 35,000 hours or about 4 years. Because these displays were tested and commissioned for use more than 5 years ago, burnt marks had appeared, brought about by a sharp contrast of the display of a certain combination of colours over a long period of time. As such, the Land Transport Authority had to replace these displays, though only at the platform level.
''Plasma Displays by Advanced System Asia (ADV)'' are installed at the concourse levels of stations along the [[North East Line]]. These were the first generation of plasma displays installed in these stations. However, the normal Mean Time Between Failures (MTBF) for plasma displays is about 35,000 hours or about 4 years. Because these displays were tested and commissioned for use more than 5 years ago, burnt marks had appeared, brought about by a sharp contrast of the display of a certain combination of colours over a long period of time. As such, the Land Transport Authority had to replace these displays, though only at the platform level.


''PPM42S3QX/XSS Plasma Displays by Samsung'' are installed at the platforms in stations along the {{NEL}}. Unlike the platforms along the {{NSL}} & {{EWL}}, 2 plasma displays are installed at each of 2 locations per platform. The reason for the installation of 4 plasma displays per platform was because these displays were installed at the platforms right from the station's construction phase & thus had the necessary infrastructure to support them at 2 different locations per platform.
''PPM42S3QX/XSS Plasma Displays by Samsung'' are installed at the platforms in stations along the [[North East Line]]. Unlike the platforms along the [[North South Line|North South]] [[East West Line|East West]] Lines, 2 plasma displays are installed at each of 2 locations per platform. The reason for the installation of 4 plasma displays per platform was because these displays were installed at the platforms right from the station's construction phase & thus had the necessary infrastructure to support them at 2 different locations per platform.


===Liquid Crystal Displays in trains===
===Liquid Crystal Displays in trains===
6 liquid crystal displays are installed in each train car. These show silent commercials, safety videos, the name of the next station & terminating station name. These are installed in the Alstom Metropolis Cars & the C751B Cars only. However at present, the units on the C751B cars have been turned off, to be replaced by STARIS v2.
6 liquid crystal displays are installed in each train car. These show silent commercials, safety videos, the name of the next station & terminating station name. These are installed in the Alstom Metropolis Cars & the [[C751B]] Cars only. However at present, the units on the C751B cars have been turned off, to be replaced by STARIS v2.


===LCD displays in stations===
===LCD displays in stations===
These are installed at the entrances & the concourse level of the stations. They show the estimated arrival times of the next 2 trains per platform, safety messages & train service messages.
These are installed at the entrances & the concourse level of the stations. They show the estimated arrival times of the next 2 trains per platform, safety messages & train service messages.


''LCD Displays by Advanced System Asia (ADV)'' are installed in stations along the {{NEL}} & {{CCL}}.
''LCD Displays by Advanced System Asia (ADV)'' are installed in stations along the [[North East Line|North East]] & [[Circle Line|Circle]] Lines.


''LCD Displays by Wei Long Electronics'' are installed in stations along the {{NSL}} & {{EWL}}.
''LCD Displays by Wei Long Electronics'' are installed in stations along the [[North South Line|North South]] [[East West Line|East West]] Lines.


===LED displays in trains (VPIS)===
===LED displays in trains (VPIS)===
These are installed in all C751A and C830s, and formerly in the C751Bs. These displays show the name of the next station, current station, door closing messages, interchange messages and occasionally the date and the time. However, the displays in the C751B trains are already replaced by the STARIS's VFDs.
These are installed in all [[C751A]] and C830s, and formerly in the C751Bs. These displays show the name of the next station, current station, door closing messages, interchange messages and occasionally the date and the time. However, the displays in the C751B trains are already replaced by the STARIS's VFDs.


===VFD displays in trains (STARIS)===
===VFD displays in trains (STARIS)===
VFD (Vacuum Fluorescent Displays) is now installed on all Kawasaki C151s/Siemens C651s, Kawasaki C751Bs and Kawasaki C151As together with STARIS. The C151s, C651s, C751Bs, C151As had already installed with STARIS. The C751B's LED Display has already replaced by these STARIS.
VFDs (Vacuum Fluorescent Displays) are now installed on all Kawasaki [[C151]]s/Siemens [[C651]]s, Kawasaki [[C751B]]s and Kawasaki [[C151A]]s together with STARIS. The C151s, C651s, C751Bs, C151As had already installed with STARIS. The C751B's LED Display has already replaced by these STARIS.


===SMRT Active Route Map Information System===
===SMRT Active Route Map Information System===
The SMRT Active Route Map Information System ([[STARIS]]) is a new rail travel information system developed in-house by SMRT Corporation and has been installed for its all 105 fleet of trains. The system comprises 4 units of ceiling mounted Vacuum Fluorescent Displays (VFD) and 8 units of active route map displays installed in every train car. This was already extended to all trains.
The SMRT Active Route Map Information System (STARIS) is a new rail travel information system developed in-house by SMRT Corporation and has been installed for its all 105 fleet of trains. The system comprises 4 units of ceiling mounted Vacuum Fluorescent Displays (VFD) and 8 units of active route map displays installed in every train car. This was already extended to all trains.


==Barrier-free facilities==
==Barrier-free facilities==
Line 78: Line 42:
All stations on the {{NSL}} & stations constructed before 2001 on the {{EWL}} initially did not have barrier-free facilities such as lifts, ramps & tactile guidance systems for the elderly and disabled. In addition, all stations on the {{NSL}} & {{EWL}} initially did not have the wider AFC gates installed as well.
All stations on the {{NSL}} & stations constructed before 2001 on the {{EWL}} initially did not have barrier-free facilities such as lifts, ramps & tactile guidance systems for the elderly and disabled. In addition, all stations on the {{NSL}} & {{EWL}} initially did not have the wider AFC gates installed as well.


Since 2010, however, all 79 MRT stations (including the unopened {{STN|M|Woodleigh}}) were made barrier-free as part of a programme to make all MRT stations accessible to the elderly and the handicapped.<sup>[citation needed]</sup> Furthermore, all 79 MRT stations (including the {{STN|M|Woodleigh}}) had wider AFC gates installed as well as part of a programme to make it easier for passengers with luggage or prams.<sup>[citation needed]</sup>
Since 2010, all 79 MRT stations were made barrier-free as part of a programme to make all MRT stations accessible to the elderly and the handicapped.<sup>[citation needed]</sup> Furthermore, all 79 MRT stations   had wider AFC gates installed as well as part of a programme to make it easier for passengers with luggage or prams.<sup>[citation needed]</sup>


===Technical information===
===Technical information===
OTIS is the supplier for the lifts at {{Stn|Changi Airport| station}} and the {{NEL}} (NEL), while Chevailer who is the distributor for Toshiba elevators in Singapore is the supplier for all other stations on the {{NSL}} & the {{EWL}}, also, Kone is the supplier for lifts and elevators for all {{CCL}} stations. These lifts typically have a capacity for 15 passengers with a total load of 1 tonne, though those at interchange or busier stations have been designed with a larger handling capacity.
OTIS is the supplier for the lifts at [[Changi Airport station]] and the {{NEL}} (NEL), while Chevailer who is the distributor for Toshiba elevators in Singapore is the supplier for all other stations on the {{NSL}} & the {{EWL}}, also, Kone is the supplier for lifts and elevators for all {{CCL}} stations. These lifts typically have a capacity for 15 passengers with a total load of 1 tonne, though those at interchange or busier stations have been designed with a larger handling capacity.


==Reference==
==Reference==
1. Shopping at SMRT website
1. Shopping at SMRT website


{{Mass Rapid Transit}}
{{Mass Rapid Transit}}


[[Category:Mass Rapid Transit]]
[[Category:Mass Rapid Transit]]

Revision as of 16:35, 10 November 2018

Stations on the Mass Rapid Transit are either elevated or underground (with the exception of Bishan station), which have two classifications of areas, paid and unpaid areas, which allow the rail operators to collect fares by restricting entry between the areas through faregates.

Each stations has a concourse level and one or more platform levels. The concourse level consists of faregates, ticketing machine, passenger service centre, toilet and retail shop. Both the concourse and platform levels consist of display travel that inform commuters of the next arriving train. Stairs, Escalators and Lift connect between the two level.

Passenger Information System

Flip Dot Electronic Displays in stations

Initially, the MRT system used green coloured flip dot electronic displays on the North South Line and East West Line from 1987 until 2002. The displays announced a train's terminating station when it arrives (or otherwise, a "Do Not Board" warning), although the disadvantage was that it could not tell the duration of a train's arrival time (e.g. the train will arrive at Jurong East station in 2 mins). The second generation of such displays installed at stations along the Woodlands Extension featured a slightly updated version where the time till the next train arrival would be displayed from 3 minutes prior to the train's arrival. They were eventually replaced by plasma displays in 2002.

Plasma Displays in stations

Singapore to utilises plasma displays in metro stations to display train service information. Critics have opposed the use of plasma displays as they are considerably more expensive to install and are susceptible to the problem of screen burn. However, the rail operators see this as a medium to earn advertising revenue from commercials shown on these displays. At the same time, they are able to display all the train service information, safety messages and time and date on these screens clearly. Using the flip dot system previously, only a limited amount of information could be displayed.

Plasma Displays by Conrac are installed in stations along the North South East West Lines. 2 plasma displays are installed at a single location per platform. The reason for the installation of only 2 plasma displays at a single location per platform was because these displays had been retrofitted into the platforms when they replaced the aging flip dot displays which were only sited at 1 location per platform. Thus, the existing infrastructure available could only support plasma displays at 1 location per platform.

Plasma Displays by Advanced System Asia (ADV) are installed at the concourse levels of stations along the North East Line. These were the first generation of plasma displays installed in these stations. However, the normal Mean Time Between Failures (MTBF) for plasma displays is about 35,000 hours or about 4 years. Because these displays were tested and commissioned for use more than 5 years ago, burnt marks had appeared, brought about by a sharp contrast of the display of a certain combination of colours over a long period of time. As such, the Land Transport Authority had to replace these displays, though only at the platform level.

PPM42S3QX/XSS Plasma Displays by Samsung are installed at the platforms in stations along the North East Line. Unlike the platforms along the North South East West Lines, 2 plasma displays are installed at each of 2 locations per platform. The reason for the installation of 4 plasma displays per platform was because these displays were installed at the platforms right from the station's construction phase & thus had the necessary infrastructure to support them at 2 different locations per platform.

Liquid Crystal Displays in trains

6 liquid crystal displays are installed in each train car. These show silent commercials, safety videos, the name of the next station & terminating station name. These are installed in the Alstom Metropolis Cars & the C751B Cars only. However at present, the units on the C751B cars have been turned off, to be replaced by STARIS v2.

LCD displays in stations

These are installed at the entrances & the concourse level of the stations. They show the estimated arrival times of the next 2 trains per platform, safety messages & train service messages.

LCD Displays by Advanced System Asia (ADV) are installed in stations along the North East & Circle Lines.

LCD Displays by Wei Long Electronics are installed in stations along the North South East West Lines.

LED displays in trains (VPIS)

These are installed in all C751A and C830s, and formerly in the C751Bs. These displays show the name of the next station, current station, door closing messages, interchange messages and occasionally the date and the time. However, the displays in the C751B trains are already replaced by the STARIS's VFDs.

VFD displays in trains (STARIS)

VFDs (Vacuum Fluorescent Displays) are now installed on all Kawasaki C151s/Siemens C651s, Kawasaki C751Bs and Kawasaki C151As together with STARIS. The C151s, C651s, C751Bs, C151As had already installed with STARIS. The C751B's LED Display has already replaced by these STARIS.

SMRT Active Route Map Information System

The SMRT Active Route Map Information System (STARIS) is a new rail travel information system developed in-house by SMRT Corporation and has been installed for its all 105 fleet of trains. The system comprises 4 units of ceiling mounted Vacuum Fluorescent Displays (VFD) and 8 units of active route map displays installed in every train car. This was already extended to all trains.

Barrier-free facilities

A typical barrier-free route for an elevated station would start at the ramp entrance to the station and following the tactile path, would bring the elderly or the handicapped past the wider Automatic Fare Collection (AFC) gates & into the lift at the concourse level. The lift will feature braille plates on lift buttons, audio announcements and LED displays. Upon exiting from the lift at the platform level, the tactile path will lead them onto a designated waiting area where the doors of the middle train cars will be (and where the designated wheelchair space will be) to wait for the train. The tactile path may diverge at the concourse level to lead to the handicapped friendly toilet or passenger service centre. At all elevated stations where platform screen doors are not installed, tactile studs are installed along the platform edge to serve as reminder for them that they are getting too close to the edge.

The barrier-free route will differ slightly depending on whether the station is underground or located at the road median or design of the station but there will be at least 1 barrier free route for the disabled and the elderly at every station, leading from the street level to the platform level, though some stations will have more due to higher passenger traffic.

All stations on the North–South Line & stations constructed before 2001 on the East–West Line initially did not have barrier-free facilities such as lifts, ramps & tactile guidance systems for the elderly and disabled. In addition, all stations on the North–South Line & East–West Line initially did not have the wider AFC gates installed as well.

Since 2010, all 79 MRT stations were made barrier-free as part of a programme to make all MRT stations accessible to the elderly and the handicapped.[citation needed] Furthermore, all 79 MRT stations had wider AFC gates installed as well as part of a programme to make it easier for passengers with luggage or prams.[citation needed]

Technical information

OTIS is the supplier for the lifts at Changi Airport station and the North East Line (NEL), while Chevailer who is the distributor for Toshiba elevators in Singapore is the supplier for all other stations on the North–South Line & the East–West Line, also, Kone is the supplier for lifts and elevators for all Circle Line stations. These lifts typically have a capacity for 15 passengers with a total load of 1 tonne, though those at interchange or busier stations have been designed with a larger handling capacity.

Reference

1. Shopping at SMRT website

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah