History of Jurong Industrial Services

From SgWiki
Revision as of 05:20, 20 August 2015 by Apex-LW'21 (talk | contribs) (Created page with "==Service 245== {| class="toccolours" border="1" cellpadding="3" style="border-collapse:collapse" |-bgcolor=#808080 !<font style="color:white;">Date !<font style="color:white;...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Service 245

Date Service changes
5 June 1977 Introduced between Boon Lay Gardens and Pandan Rd (loop).
1 June 1978 Re-routed to start from Jurong Int and loop at Pandan Rd.
1 July 1990 Merged with Service 78 and withdrawn.

Service 246

Date Service changes
15 May 1977 Introduced between Boon Lay Gardens and Jln Tukang (loop).
1 June 1978 Re-routed to start from Jurong Int and loop at Boon Lay Dr.
1 July 1990 Re-routed to start from Boon Lay Int and loop at Third Chin Bee Rd.
15 January 1995 Amended to loop at Boon Lay Drive via Chin Bee Dr, Quality Rd and Jln Tukang, skipping International Rd, Third Chin Bee Rd and Chin Bee Ave. Deleted sectors were covered by Service 79.
11 June 2006 Amended to ply Tah Ching Rd, skipping Kang Ching Rd.
18 June 2006 Amended to Boon Lay Temp Int.
27 December 2009 Amended to air-conditioned Boon Lay Int.

Service 247

Date Service changes
1 June 1978 Introduced between Jurong and Jurong Pier Rd (loop).
1 July 1990 Amended to Boon Lay Int. At the same time, amended to ply Jurong Pier Rd & Jln Buroh and loop at Fishery Port Rd.
20 January 1991 Merged with Service 98 and withdrawn under TransitLink Integration Exercise.

Service 247A

Date Service changes
22 June 1978 Introduced as a peak-hour service between Boon Lay Gardens and Jurong Pier Rd (loop).
5 October 1987 Handed over to Scheme B operators.

Service 248

Date Service changes
1 June 1978 Introduced between Jurong and Neythal Rd (loop).
1 July 1990 Amended to Boon Lay Int.
29 March 1992 Merged with Service 250 and withdrawn under TransitLink Integration Exercise.

Service 249

Date Service changes
1 June 1978 Introduced between Jurong and Jln Samulun (loop).
1 July 1990 Amended to Boon Lay Int.
11 February 2001 Calls at all bus stops along Jln Boon Lay.
18 June 2006 Amended to Boon Lay Temp Int.
27 December 2009 Amended to air-conditioned Boon Lay Int.

Service 249A

Date Service changes
16 June 1978 Introduced as a peak-hour service between Boon Lay Gardens and Jln Samulun (loop).
5 October 1987 Handed over to Scheme B operators.

Service 250

Date Service changes
1 June 1978 Introduced between Jurong and Sixth Lok Yang Rd (loop).
1 July 1990 Amended to Boon Lay Int. At the same time, skips Jln Ahmad Ibrahim & Pioneer Rd.
29 March 1992 Merged with Service 248 and amended to ply Enterprise Rd, Kwong Min Rd/Wan Lee Rd, Soon Lee Rd and Fan Yoong Rd.
11 February 2001 Merged with Services 192 and 252 and withdrawn.

Service 250A

Date Service changes
22 June 1978 Introduced as a peak-hour service between Boon Lay Gardens and Pioneer Rd (loop).
5 October 1987 Handed over to Scheme B operators.

Service 251

Date Service changes
1 June 1978 Introduced between Jurong and Refinery Rd (loop).
12 April 1987 Calls at all stops along Jln Ahmad Ibrahim.
1 July 1990 Amended to Boon Lay Int.
11 February 2001 Merged with Service 253 and extended to loop at Benoi Rd, skipping Refinery Rd.
2004 Skipped Liu Fang Rd.
18 June 2006 Amended to Boon Lay Temp Int.
27 December 2009 Amended to air-conditioned Boon Lay Int.

Service 251A

Date Service changes
22 June 1978 Introduced as a peak-hour service between Boon Lay Gardens and Refinery Rd (loop).
5 October 1987 Handed over to Scheme B operators.

Service 252

Date Service changes
1 June 1978 Introduced between Jurong and Gul Circle (loop).
12 April 1987 Calls at all stops along Jln Ahmad Ibrahim.
1 July 1990 Amended to Boon Lay Int.
1992 Amended to skip express sector along Jln Boon Lay and skip Joo Koon Rd.
29 March 1992 Amended to ply International Rd under TransitLink Integration Exercise.
15 January 1995 Amended to loop at Joo Koon Way.
11 February 2001 Merged with Service 250 and amended to ply Enterprise Rd, Kwong Min Rd/Wan Lee Rd, Soon Lee Rd and Fan Yoong Rd.
18 June 2006 Amended to Boon Lay Temp Int.
27 December 2009 Amended to air-conditioned Boon Lay Int.

Service 253

Date Service changes
1 June 1978 Introduced between Jurong and Benoi Rd (loop).
12 April 1987 Calls at all stops along Jln Ahmad Ibrahim.
1 July 1990 Amended to Boon Lay Int.
15 January 1995 Amended to ply an express sector along Jln Ahmad Ibrahim.
11 February 2001 Merged with Services 251, 255 and 257 and withdrawn.

Service 254

Service Gen Date Service changes
1st Gen
(1977 - 1978)
5 June 1977 Introduced between Boon Lay Gardens and Gul Cres (loop).
1 June 1978 Withdrawn with the introduction of Service 255.
2nd Gen
(1984 - present)
27 May 1984 Re-introduced between Jurong and Tuas Ave 1 (loop).
1 July 1990 Amended to Boon Lay Int.
15 January 1995 Amended to ply Tuas Rd, Tuas Basin Link and Tuas Ave 11.
11 February 2001 Amended to ply Jurong West St 64 and Boon Lay Way.
18 June 2006 Amended to Boon Lay Temp Int.
27 December 2009 Amended to air-conditioned Boon Lay Int.

Service 255

Date Service changes
1 June 1978 Introduced between Jurong and Gul Cres (loop).
1 July 1990 Amended to Boon Lay Int.
15 January 1995 Amended to ply Benoi Rd towards Gul Cres and Gul Ave and Gul Way towards Boon Lay. At the same time, ply an express sector along Jln Ahmad Ibrahim.
11 February 2001 Merged with Service 253 and amended to ply Benoi Sector and Pioneer Rd. At the same time, amended to ply Jurong West St 63 and Pioneer Rd North.
18 June 2006 Amended to Boon Lay Temp Int.
27 December 2009 Amended to air-conditioned Boon Lay Int.

Service 257

Date Service changes
1 June 1978 Introduced between Jurong and Gul Rd (loop).
1 July 1990 Amended to Boon Lay Int.
18 October 1992 Amended to ply Pioneer Sector Lane.
11 February 2001 Merged with Service 253 and amended to ply Benoi Rd and Pioneer Rd. At the same time, amended to ply Jurong West St 61, Jurong West St 62 & Jurong West St 63.
18 June 2006 Amended to Boon Lay Temp Int.
27 December 2009 Amended to air-conditioned Boon Lay Int.