Difference between revisions of "Jurong East station"

From SgWiki
Jump to: navigation, search
m
m (Layout)
 
Line 32: Line 32:
 
{| class="layout"
 
{| class="layout"
 
!rowspan=7|L3
 
!rowspan=7|L3
|Platform A
+
|colspan=2|{{RailRoute/2|A|NSL left|{{NS28}}|{{NS9}}|{{NS2}}|{{NS1}}}}
|{{RailRoute/2|NSL|left|{{NS28}}|{{NS9}}|{{NS2}}|{{NS1}}}}
 
 
|-
 
|-
 
|colspan=2 class="platform"|Platform A/B
 
|colspan=2 class="platform"|Platform A/B
 
|-
 
|-
|Platform B/C||{{RailRoute/3|EWL|right|{{EW24}}|{{EW23}}|{{EW4}}|{{EW1}}|{{CG2}}}}
+
|colspan=2|{{RailRoute/3|B/C|EWL right|{{EW24}}|{{EW23}}|{{EW4}}|{{EW1}}|{{CG2}}}}
 
|-
 
|-
 
|colspan=2 class="platform"|Platform C/D
 
|colspan=2 class="platform"|Platform C/D
 
|-
 
|-
|Platform D/E
+
|colspan=2|{{RailRoute/2|D/E|NSL left|{{NS28}}|{{NS9}}|{{NS2}}|{{NS1}}}}
|{{RailRoute/2|NSL|left|{{NS28}}|{{NS9}}|{{NS2}}|{{NS1}}}}
 
 
|-
 
|-
 
|colspan=2 class="platform"|Platform E/F
 
|colspan=2 class="platform"|Platform E/F
 
|-
 
|-
|Platform F||{{RailRoute/1|EWL|left|{{EW33}}|{{EW25}}|{{EW24}}}}
+
|colspan=2|{{RailRoute/1|F|EWL left|{{EW33}}|{{EW25}}|{{EW24}}}}
 
|-
 
|-
 
!width=25|L2
 
!width=25|L2

Latest revision as of 14:10, 27 March 2020


!
COVID-19 ADVISORY
!
In light of the current COVID-19, sgWiki would like to remind all to:
  • Keep good personal hygiene
  • Visit a clinic if you develop cough, flu and/or fever. Contact the clinic beforehand if you suspected yourself to be infected with the virus.
  • Defer all travel abroad. Singaporeans, Permanent Residents, Long Term Pass holders entering Singapore will be issued a 14-day Stay-Home Notice (SHN).
  • Short-Term visitors are not allowed to enter or transit in Singapore.
  • Observe the necessary Stay-Home Notice (SHN) or Quarantine Order (QO) protocols.
  • For more information, visit www.moh.gov.sg.

!
TRAVEL ADVISORY
!
Train services will be extended tonight. Several bus services will be extended to coincide with the last train timing. Please refer here for more information.
SMRT East West Line
  • Due to track maintenance and renewal works, train services between EW4 Tanah Merah and EW9 Aljunied stations will end at 11pm. Bridging bus service is available between the stations. Several bus services will be extended to coincide with the last bus timing. Please refer here for more information.

SMRT North South Line and East West Line
  • Due to track maintenance and renewal works, train services between NS1 Jurong East and NS4 Choa Chu Kang stations and between EW21 Buona Vista and EW27 Boon Lay stations will end at 11pm. Bridging bus service is available between the stations. Several bus services will be extended to coincide with the last bus timing. Please refer here for more information.

SMRT Thomson–East Coast Line

SMRT Thomson–East Coast Line
  • Due to system integrating test, train services between TE1 Woodlands North and TE3 Woodlands South stations will start at 6.30am. Please refer here for more information.

Train services will be extended on the eve of Good Friday. Several bus services will be extended to coincide with the last train timing. Please refer here for more information.
SBS Transit
  • From Wednesday, 18 March 2020 to Tuesday, 14 April 2020, bus services 160 and bus service 170 will be amended to loop Woodlands Centre Rd, skipping all bus stop in Malaysia. Please refer here for more information.
  • From Wednesday, 18 March 2020 to Tuesday, 14 April 2020, bus service 170X will be suspended. Please refer here for more information.
  • From Monday, 30 March 2020, bus service 117B will be discontinued. Commuters may continue to take bus service 117 instead. Please refer here for more information.

SMRT Buses
  • From Wednesday, 18 March 2020 to Tuesday, 14 April 2020, bus service 950 will be suspended. Please refer here for more information.
  • From Monday, 30 March 2020, bus service 670 will be operated by SMRT Buses. Please refer here for more information.

NS1EW24JE5
Jurong East
裕廊东
ஜூரோங் கிழக்கு
Jurong East-NSL-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 10 Jurong East Street 12
Singapore 609690
Line(s) North South Line
East West Line
Jurong Region Line (Future)
Connections Bus Taxi
Abbreviation JUR

Jurong East (NS1/EW24/JE5) is an elevated Mass Rapid Transit (MRT) station on the North South Line, the East West Line and the future Jurong Region Line.

!
Note: This station will be affected for the Early Closure of the North South Line from 15 May 2020 to 27 June 2020. The last train will depart at 11pm on Fridays and Saturdays.
!
Note: This station will be affected for the Early Closure of the East West Line from 15 May 2020 to 27 June 2020. The last train will depart at 11pm on Fridays and Saturdays.

History

Date Event
5 November 1988 Station officially opens
10 March 1990 Station interchanges with North South Line (then East West Line Branch Extension)
27 May 2011 Jurong East Modification Project opens[1][2]

Jurong East Modification Project

The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.[3]

Layout

L3
APlatform NS28
Marina South Pier
NS9TE2
Woodlands
NS2
Bukit Batok
NS1EW24
Jurong East
Platform A/B
B/CPlatform EW24NS1
Jurong East
EW23
Clementi
EW4CG
Tanah Merah
EW1
Pasir Ris
CG2
Changi Airport
Platform C/D
D/EPlatform NS28
Marina South Pier
NS9TE2
Woodlands
NS2
Bukit Batok
NS1EW24
Jurong East
Platform E/F
FPlatform EW33
Tuas Link
EW25
Chinese Garden
EW24NS1
Jurong East
L2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
L1 Street Level Jurong East Bus Interchange

Notes: Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH, and during North South Line train withdrawal.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Jurong East Bus Interchange, Jurong Gateway Road, Jurong East Central, JCube mall
B Handicapped/disabled access Venture Avenue, Jurong Gateway Road
C Handicapped/disabled access JEM, Big Box
D Handicapped/disabled access Westgate

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
North South Line
NS28 Marina South Pier 05:16 05:16 05:35 22:46
NS19 Toa Payoh 23:28
NS16 Ang Mo Kio 00:17
East West Line
EW1 Pasir Ris 05:42 05:42 06:12 23:42
EW33 Tuas Link 05:14 05:14 05:44 00:25

Bus

Bus Stop Exit Bus Service
(28009) Jurong East Temp Int A
41
49
51
52
66
78
79
97
97e
98
98M
105
143
143M
160
183
197
333
334
335
506
(28241) Opp Jurong East Lib A
51
78
79
97
97e
143
143M
176
178
197
198
333
(28249) Jurong East Lib A
51
78
79
97
97e
143
143M
176
178
197
198
333
(28201) Opp The JTC Summit B
990

References

  1. "New Platform at Jurong East Station To Open on 27 May". Land Transport Authority (16 May 2011).
  2. "Waiting times cut with new platform at Jurong East MRT station". Channel NewsAsia.
  3. "The Jurong East Modification Project (JEMP)". Land Transport Authority.
North South Line [ VTE ]
Stations Jurong EastBukit BatokBukit GombakChoa Chu KangYew TeeKranjiMarsilingWoodlandsAdmiraltySembawangCanberraYishunKhatibYio Chu KangAng Mo KioBishanBraddellToa PayohNovenaNewtonOrchardSomersetDhoby GhautCity HallRaffles PlaceMarina BayMarina South Pier
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots BishanUlu Pandan
East West Line [ VTE ]
Stations Pasir RisTampinesSimeiTanah MerahBedokKembanganEunosPaya LebarAljuniedKallangLavenderBugisCity HallRaffles PlaceTanjong PagarOutram ParkTiong BahruRedhillQueenstownCommonwealthBuona VistaDoverClementiJurong EastChinese GardenLakesideBoon LayPioneerJoo KoonGul CircleTuas CrescentTuas West RoadTuas Link
Changi Airport Extension: Tanah MerahExpoChangi Airport
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots ChangiUlu PandanTuasEast Coast
Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West Extension: Bahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East Extension: TengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir
Rolling Stock CJ151