Jurong East station

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
3

Jurong East
裕廊东
ஜூரோங் கிழக்கு
Jurong East-NSL-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 10 Jurong East Street 12
Singapore 609690
Line(s) North–South Line
East–West Line
Jurong Region Line
(Under Planning)
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation JUR

Jurong East (NS1/EW24/JE5) is an elevated Mass Rapid Transit (MRT) station on the North–South Line, the East–West Line and the future Jurong Region Line, and serves as an interchange station between the two lines.

During peak periods, trains arrive directly from Ulu Pandan Depot to start service on both the North South Line and the East West Line. This station was also the first station to make announcements about train services when the Branch Extension opened in 1990.[1]

History

Date Event
5 November 1988 Station officially opens
10 March 1990 Station interchanges with North South Line (then East West Line Branch Extension)
18 December 2009 Half-Height Platform Screen Doors operates
27 May 2011 Jurong East Modification Project opens[2][3]
30 June 2012 High Volume, Low Speed Blade fans operates

Jurong East Modification Project

The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.[4]

Layout

L3 Platform A North–South Line
Template:Terminus
Platform A/B
Platform B/C East–West Line
Template:Terminus
Template:Terminus
Platform C/D
Platform D/E North–South Line
Template:Terminus
Platform E/F
Platform F East–West Line
Template:Terminus
L2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
L1 Street Level Jurong East Bus Interchange

Notes: Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Jurong East Bus Interchange, Jurong Gateway Road, Jurong East Central, JCube mall
B Handicapped/disabled access Venture Avenue, Jurong Gateway Road
C Handicapped/disabled access JEM, Big Box
D Handicapped/disabled access Westgate

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Line Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
28009 Jurong East Temp Int
41
49
51
52
66
78
79
97
97e
98
98M
105
143
143M
160
183
197
333
334
335
506
28061 Jurong East Stn/Int
49
98
98M
99
990
28069 Blk 203
49
99
28241 Opp Jurong East Lib
51
78
79
97
97e
143
143M
176
178
197
198
333
28249 Jurong East Lib
51
78
79
97
97e
143
143M
176
178
197
198
333
28201 Opp The JTC Summit
990

References

Template:North South Line Template:East West Line

icon Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West ExtensionBahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East ExtensionTengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir
Rolling Stock J151
Depots Tengah
Others Bridging Service