Jurong East station

From SgWiki
Jump to: navigation, search


!
TRAVEL ADVISORY
!
SMRT East West Line: Train service between Outram Park and Jurong East stations will end at 11pm. Shuttle bus service is available. Certain bus service will be extended to coincide with the last bus timing. Please refer here for more information.
SBS Transit North East Line: Train service between Serangoon and Punggol stations will end at 11pm. Shuttle bus service is available. Certain bus service will be extended to coincide with the last bus timing. Please refer here for more information.
SMRT East West Line: Train service between Pasir Ris and Tanah Merah stations will end at 11pm. Shuttle bus service is available. Certain bus service will be extended to coincide with the last bus timing. Please refer here for more information.
Go-Ahead: From 18 November 2019, short trip services 68A and 68B will be introduced between Tampines Int and Tampines Avenue 11 to serve commuters better. Please refer here for more information.
SMRT Bukit Panjang LRT: From 1 December 2019, operating hours for Service A (via Senja station) will be shorten to operate only during Weekdays Peak Hours. Please refer here for more information.
NS1EW24JE5
Jurong East
裕廊东
ஜூரோங் கிழக்கு
Jurong East-NSL-EWL.png
Statistics
Address 10 Jurong East Street 12
Singapore 609690
Line(s) North South Line
East West Line
Jurong Region Line (Future)
Connections Bus Taxi
Abbreviation JUR

Jurong East (NS1/EW24/JE5) is an elevated Mass Rapid Transit (MRT) station on the North South Line, the East West Line and the future Jurong Region Line.

History

Date Event
5 November 1988 Station officially opens
10 March 1990 Station interchanges with North South Line (then East West Line Branch Extension)
27 May 2011 Jurong East Modification Project opens[1][2]

Jurong East Modification Project

The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.[3]

Layout

L3 Platform A
NS28
Marina South Pier
NS9
Woodlands
NS1EW24
Jurong East
Platform A/B
Platform B/C
EW24NS1
Jurong East
EW4
Tanah Merah
EW1
Pasir Ris
CG2
Changi Airport
Platform C/D
Platform D/E
NS28
Marina South Pier
NS9
Woodlands
NS1EW24
Jurong East
Platform E/F
Platform F
EW33
Tuas Link
EW24NS1
Jurong East
L2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
L1 Street Level Jurong East Bus Interchange

Notes: Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Jurong East Bus Interchange, Jurong Gateway Road, Jurong East Central, JCube mall
B Handicapped/disabled access Venture Avenue, Jurong Gateway Road
C Handicapped/disabled access JEM, Big Box
D Handicapped/disabled access Westgate

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
North South Line
NS28 Marina South Pier 05:16 05:16 05:35 22:46
NS27 Marina Bay 22:53
NS19 Toa Payoh 23:28
NS16 Ang Mo Kio 00:17
East West Line
EW1 Pasir Ris 05:43 05:43 06:13 23:45
EW33 Tuas Link 05:14 05:14 05:44 00:25

Bus

Bus Stop Exit Bus Service
(28009) Jurong East Temp Int A
41
49
51
52
66
78
79
97
97e
98
98M
105
143
143M
160
183
197
333
334
335
506
(28241) Opp Jurong East Lib A
51
78
79
97
97e
143
143M
176
178
197
198
333
(28249) Jurong East Lib A
51
78
79
97
97e
143
143M
176
178
197
198
333
(28201) Opp The JTC Summit B
990

References

  1. "New Platform at Jurong East Station To Open on 27 May". Land Transport Authority (16 May 2011).
  2. "Waiting times cut with new platform at Jurong East MRT station". Channel NewsAsia.
  3. "The Jurong East Modification Project (JEMP)". Land Transport Authority.
North South Line [ VTE ]
Stations Jurong EastBukit BatokBukit GombakChoa Chu KangYew TeeKranjiMarsilingWoodlandsAdmiraltySembawangCanberraYishunKhatibYio Chu KangAng Mo KioBishanBraddellToa PayohNovenaNewtonOrchardSomersetDhoby GhautCity HallRaffles PlaceMarina BayMarina South Pier
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots BishanUlu Pandan
East West Line [ VTE ]
Stations Pasir RisTampinesSimeiTanah MerahBedokKembanganEunosPaya LebarAljuniedKallangLavenderBugisCity HallRaffles PlaceTanjong PagarOutram ParkTiong BahruRedhillQueenstownCommonwealthBuona VistaDoverClementiJurong EastChinese GardenLakesideBoon LayPioneerJoo KoonGul CircleTuas CrescentTuas West RoadTuas Link
Changi Airport Extension: Tanah MerahExpoChangi Airport
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots ChangiUlu PandanTuasEast Coast
Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West Extension: Bahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East Extension: TengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir
Rolling Stock CJ151