Jurong Pier station

From SgWiki
Revision as of 08:54, 12 May 2018 by Supernutorcrazy (talk | contribs) (Created page with "{{Infobox/Station |Code={{Code|1|JRL|JS12}} |Name=Jurong Pier |Info= {{Infoline|Line(s)|{{JRL}}<br><small>''(Under Planning)}} }} '''Jurong Pier (JS12)''' is a future elevat...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 28 April 2024, feeder bus service
    296
    will be introduced, plying between Tampines Int and Tampines North Dr 2 (Loop).

Please refer here for more information.

1

Jurong Pier*Graphic From SGTrains/Wikipedia/LTA
Statistics
Line(s) Jurong Region Line
(Under Planning)

Jurong Pier (JS12) is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line.[1]

References

  1. "Jurong Region Line, Singapore's 7th MRT line, to open in phases from 2026". Fann Sim (Channel NewsAsia, 9 May 2018). Retrieved 10 May 2018.
icon Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West ExtensionBahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East ExtensionTengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir
Rolling Stock J151
Depots Tengah
Others Bridging Service