Difference between revisions of "Jurong Region Line"

From SgWiki
Jump to navigation Jump to search
m
m (Protected "Jurong Region Line" ([Edit=Allow only autoconfirmed users] (indefinite) [Move=Allow only autoconfirmed users] (indefinite)))
(No difference)

Revision as of 23:13, 13 September 2017


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 28 April 2024, feeder bus service
    296
    will be introduced, plying between Tampines Int and Tampines North Dr 2 (Loop).

Please refer here for more information.

Jurong Region Line
Statistics
Status Under Planning

Jurong Region Line (JRL) will be the seventh Mass Rapid Transit line in Singapore. The line will be 20 km long and is expected to begin service in 2025.[1]

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah

Template:Railway Lines in Singapore