Difference between revisions of "Lorong Chuan station"

From SgWiki
Jump to navigation Jump to search
m (Smrtrainlovur moved page Lorong Chuan MRT Station to Lorong Chuan station)
Line 10: Line 10:
}}
}}


'''Lorong Chuan MRT Station (CC14)''' is an underground [[Mass Rapid Transit]] (MRT) station on the [[Circle Line]].
'''Lorong Chuan (CC14)''' is an underground [[Mass Rapid Transit]] (MRT) station on the [[Circle Line]].


==History==
==History==

Revision as of 23:54, 29 September 2018


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 28 April 2024, feeder bus service
    296
    will be introduced, plying between Tampines Int and Tampines North Dr 2 (Loop).

Please refer here for more information.

1

Lorong Chuan
罗弄泉
லோரோங் சுவான்
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 150 Serangoon Avenue 3
Singapore 554533
Line(s) Circle Line
Connections Bus, Taxi
Abbreviation LRC

Lorong Chuan (CC14) is an underground Mass Rapid Transit (MRT) station on the Circle Line.

History

Date Event
28 May 2009 Station officially opens

Before the station opened, Singapore Civil Defence Force conducted the third Shelter Open House at this station on 4 April 2009, together with Bartley and Bishan stations.

In June 2003, Singapore Land Authority (SLA) offered Chuan Park (a 99-year leasehold condo near the site of the station) residents $1 for 220m2 of land, which comprised mainly car park lots. The land was necessary to build the Circle Line. The 99-year leasehold condominium at Lorong Chuan, off Serangoon Avenue 3, has 446 units, so the compensation works out to just 0.2 cents a household. Nominal compensation was paid as it takes into account, the increase in the market value of the condominium when the MRT station is built on the acquired land. The owners of Chuan Park have accepted the Government's compensation and the case is closed.

Art in Transit

The artwork featured in this station is Through the Looking Glass by A Dose of Light and Yoma Studio (Yong Ding Li, Ang Song Nian, Zhao Renhui, Sai Zom Pha and Juliana Ong) which designed a hand-drawn artwork depicting the entire island of Singapore as well as the sea-faring activities.

Layout

L1 Street Level
B1 Concourse Faregates, General Ticketing Machines, Passenger Service Centre
B2 Platform A Circle Line
Template:Terminus
Platform A/B
Platform B Circle Line
Template:Terminus
Template:Terminus

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Nanyang Junior College, Yangzheng Pri Sch, Zhonghua Sec Sch
B Handicapped/disabled access St Gabriel's Pri Sch, Australian International School, New Tech Park Building

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
66391 S’goon Ave 3 (Nanyang JC)
58
105
66399 S’goon Ave 3 (Lor Chuan Stn)
58
105


References


Template:Singapore MRT stations

icon Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL6KeppelCantonmentPrince Edward Road
Circle Line ExtensionPromenadeBayfrontMarina Bay
Rolling Stock 830830C851E
Depots Kim Chuan
Others Bridging Service