Mass Rapid Transit

From SgWiki
Revision as of 21:02, 8 December 2005 by 202.33.195.109 (talk) (Spam removed)
Jump to navigation Jump to search

The Mass Rapid Transit

The MRT system consists of three inter-connected rail systems, namely the North-South line, the East-West line, and the newest North-East line. The North-South and East-West lines are operated by the SMRT Corporation, whereas the newer North-East line is operated by SBSTransit.
There is also another line currently under construction (The Circle Line). However, due to the recent Nicoll Highway collapse, work is temporarily halted.
Inquiry of the collapse has started and restoration work of Nicoll Highway has begun
Circle line has continued its construction after the restoration of Nicoll Highway
Downtown Extension line will start its construction in 2007. Stations built: Chinatown, Cross Street, Landmark, Integrated Resort and Milliena


  • More information can be found at mrts.sgforums.com too*

Getting around

The MRT system boasts a seamless payment method, through the EZ-link card system. With a unified payment method, operators offer various rebates for transfers between the rail and bus systems.

And how much to get around Singapore by MRT?




Page edited by: 1) Pkchukiss 23:24, 12 Sep 2004 (SGT)


The Mass Rapid Transit

The MRT system consists of three inter-connected rail systems, namely the North-South line, the East-West line, and the newest North-East line. The North-South and East-West lines are operated by the SMRT Corporation, whereas the newer North-East line is operated by SBSTransit.
There is also another line currently under construction (The Circle Line). However, due to the recent Nicoll Highway collapse, work is temporarily halted.
Inquiry of the collapse has started and restoration work of Nicoll Highway has begun
Circle line has continued its construction after the restoration of Nicoll Highway
Downtown Extension line will start its construction in 2007. Stations built: Chinatown, Cross Street, Landmark, Integrated Resort and Milliena


  • More information can be found at mrts.sgforums.com too*

Getting around

The MRT system boasts a seamless payment method, through the EZ-link card system. With a unified payment method, operators offer various rebates for transfers between the rail and bus systems.

And how much to get around Singapore by MRT?




Page edited by: 1) Pkchukiss 23:24, 12 Sep 2004 (SGT)

Getting around

The MRT system boasts a seamless payment method, through the EZ-link card system. With a unified payment method, operators offer various rebates for transfers between the rail and bus systems.

And how much to get around Singapore by MRT?




Page edited by: 1) Pkchukiss 23:24, 12 Sep 2004 (SGT)


The Mass Rapid Transit

The MRT system consists of three inter-connected rail systems, namely the North-South line, the East-West line, and the newest North-East line. The North-South and East-West lines are operated by the SMRT Corporation, whereas the newer North-East line is operated by SBSTransit.
There is also another line currently under construction (The Circle Line). However, due to the recent Nicoll Highway collapse, work is temporarily halted.
Inquiry of the collapse has started and restoration work of Nicoll Highway has begun
Circle line has continued its construction after the restoration of Nicoll Highway
Downtown Extension line will start its construction in 2007. Stations built: Chinatown, Cross Street, Landmark, Integrated Resort and Milliena


  • More information can be found at mrts.sgforums.com too*

Getting around

The MRT system boasts a seamless payment method, through the EZ-link card system. With a unified payment method, operators offer various rebates for transfers between the rail and bus systems.

And how much to get around Singapore by MRT?




Page edited by: 1) Pkchukiss 23:24, 12 Sep 2004 (SGT)