Mass Rapid Transit

From SgWiki
Revision as of 22:41, 14 November 2022 by Peace & Harmony (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SBS Transit
  • From Monday, 27 March 2023, the first bus departure of bus service
    39
    from Punggol Way (B/S 65439 - Blk 220C) will be brought forward from 6.20am to 6.15am on weekdays. Please refer here for more information.

SBS Transit
  • From Monday, 27 March 2023, bus service
    102A
    will be introduced from Sengkang East Way to Sengkang West Way, operating on weekdays evening peak hours. Please refer here for more information.

SBS Transit
  • From Monday, 27 March 2023, bus service
    671
    will operate an additional trip from Punggol Road. Please refer here for more information.

SMRT Buses
  • From Saturday, 1 April 2023, the last bus departure of bus service
    979
    from Bukit Panjang Interchange will be extended from 11.45pm to 12.00am on weekends & public holidays. Please refer here for more information.

Go-Ahead SBS Transit SMRT Buses
  • From Sunday, 9 April 2023, operating hours of bus services
    12e
    ,
    851e
    and
    960e
    will be adjusted. Please refer the following (Svc 12e), (Svc 851e) & (Svc 960e) for more information.

Mass Rapid Transit
MRT
Statistics
Owner Land Transport Authority
Operator(s) SMRT
SBS Transit
Number of lines 6
Number of stations 134
System length 224.5 km

The Mass Rapid Transit (MRT) system forming the major component of the railway system. The network has since grown rapidly in accordance with the aim of developing a comprehensive rail network as the backbone of the public transport system.

The network encompasses 224.5 km of active route with 134 stations in operation. The lines are built by the Land Transport Authority which allocates operating concessions to the profit-based corporations, SMRT Corporation and SBS Transit.

History[edit]

Main article: History of the Mass Rapid Transit

The origins of the Mass Rapid Transit (MRT) are derived from a forecast by city planners in 1967 which stated the need for a rail-based urban transport system by 1992.[1][2][3] Following a debate on whether a bus-only system would be more cost-effective, then Minister for Communications Ong Teng Cheong, came to the conclusion that an all-bus system would be inadequate, as it would have to compete for road space in a land-scarce country.[4][5]

The network was built in stages, with the North–South Line given priority because it passes through the Central Area that has a high demand for public transport. The Mass Rapid Transit Corporation (MRTC), later renamed as SMRT Corporation — was established on 14 October 1983; it took over the roles and responsibilities (which was the construction and operation the MRT system) of the former provisional Mass Rapid Transit Authority.[4][6] The first section of the North–South Line started operations on 7 November 1987. The opening of Boon Lay on the East–West Line on 6 July 1990 marked the completion of the system two years ahead of schedule.[7][8]

Infrastructure[edit]

Line Commencement Latest extension Terminus Stations Length (km) Rolling Stocks Depot Operator Control Center
North–South Line 7 November 1987 2014 Jurong East
Marina South Pier
27 45 C151
C651
C751B
C151A
C151B
C151C
Bishan Depot
Ulu Pandan Depot
Changi Depot
Tuas Depot
SMRT Kim Chuan Depot
East–West Line 12 December 1987 2017 Pasir Ris
Tuas Link
Changi Airport
35 55.7
North East Line 20 June 2003 N/A HarbourFront
Punggol
16 19.3 C751A
C751C
Sengkang Depot SBS Transit Sengkang Depot
Circle Line 28 May 2009 2012 Dhoby Ghaut
HarbourFront
Marina Bay
30 34.6 C830
C830C
Kim Chuan Depot SMRT Kim Chuan Depot
Downtown Line 22 December 2013 2017 Bukit Panjang
Expo
34 40.6 C951 Kim Chuan Depot
Gali Batu Depot
SBS Transit Gali Batu Depot
Thomson–East Coast Line 31 January 2020 2022 Woodlands North
Gardens by the Bay
20 29.3 CT251 Mandai Depot SMRT Mandai Depot

Expansion[edit]

The following table lists Mass Rapid Transit lines that are currently under construction, or that are in the planning stages:

Line Commencement Between stations Stations Length (km) Depot Operator
Under Construction
North East Line
(North East Line extension)
2024 Punggol Punggol Coast 1 2 N/A SBS Transit
Circle Line
(Stage 6)
2026 HarbourFront Marina Bay 3 4 N/A SMRT
Downtown Line
(Stage 3 extension & Hume station)
2025 Expo Sungei Bedok 2 2.2 East Coast Integrated Depot SBS Transit
Hume 1 0 N/A
Thomson–East Coast Line 2024 (Stage 4)
2025 (Stage 5)
2025 (Founders' Memorial station)
Gardens by the Bay Sungei Bedok 10 13.7 East Coast Integrated Depot SMRT
Jurong Region Line 2027 (Stage 1)
2028 (Stage 2)
2029 (Stage 3)
Choa Chu Kang
Bahar Junction
Tengah
Jurong Pier
Peng Kang Hill
Pandan Reservoir
24 24 Tengah Depot N/A
Cross Island Line 2030 (Stage 1) Aviation Park Bright Hill 12 29 Changi East Depot
Under Planning
Cross Island Line 2032 (Stage 2)
2032 (Punggol extension)
Bright Hill Jurong Lake District 6 15 N/A N/A
Pasir Ris Punggol 3 7.3

References[edit]

  1. "Southeast Asian Affairs.", Page 293. Seah C. M. (Singapore: Institute of Southeast Asian Studies, 1981).
  2. Sharp 2005, page 66
  3. "Sustainable Urban Transportation Planning and Development — Issues and Challenges for Singapore". Fwa Tien Fang (Department of Civil Engineering, NUS, 4 September 2004)
  4. 4.0 4.1 "1982 – The Year Work Began". Land Transport Authority. Retrieved 16 November 2013.
  5. "In Memoriam — Ong Teng Cheong: A Profile". Lee Siew Hoon, Chandra Mohan (23 February 2002, Channel NewsAsia). Retrieved 26 November 2007.
  6. "Annual report 1984". Singapore: Mass Rapid Transit Corporation. Page 5.
  7. Mass Rapid Transit Corporation, Singapore 1988, page 10.
  8. Sharp 2005, p. 109.

Corporate and governmental sources[edit]

  • Sharp, Ilsa (2005). The Journey — Singapore's Land Transport Story. SNP:Editions. ISBN 981-248-101-X.
  • Mass Rapid Transit Corporation, Singapore (1988). The MRT Story. ISBN 981-00-0251-3.
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks C151C151AC151BC151CCT251C651C751AC751BC751CC830C830CC951
FutureC851ECJ151CR151 • CCR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah