Difference between revisions of "Nicoll Highway station"

From SgWiki
Jump to navigation Jump to search
Line 45: Line 45:
|-
|-
!rowspan=3|B3
!rowspan=3|B3
|Platform B||{{RailRoute/8|CCL|right|{{Code|1|CCL|CC5}}<br>{{Stn|Nicoll Highway}}|{{CC1}}|{{CE2}}}}
|Platform B||{{RailRoute/8|CCL|right|{{CC5}}|{{CC4}}|{{CC1}}|{{CE2}}}}
|-
|-
|colspan=2 class="platform"|Platform A/B
|colspan=2 class="platform"|Platform A/B
|-
|-
|Platform A||{{RailRoute/2|CCL|left|{{CC29}}|{{CC6}}|{{Code|1|CCL|CC5}}<br>{{Stn|Nicoll Highway}}}}
|Platform A||{{RailRoute/2|CCL|left|{{CC29}}|{{CC15}}|{{CC6}}|{{CC5}}}}
|}
|}



Revision as of 16:20, 31 July 2019


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
1

Nicoll Highway
尼诰大道
நிக்கல் நெடுஞ்சாலை
Nicoll Highway-CCL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 20 Republic Avenue
Singapore 038970
Line(s) Circle Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation NCH

Nicoll Highway (CC5) is an underground Mass Rapid Transit (MRT) station on the Circle Line.

History

Date Event
17 April 2010 Station officially opens

Nicoll Highway collapse

On 20 April 2004, a section of tunnel being built for the Circle Line collapsed, apparently when a retaining wall used in the tunnel's construction gave way. This occurred near what was to become the Nicoll Highway station, not far from the Merdeka Bridge.

The accident left a collapse zone 150 m wide, 100 m long, and 30 m deep. Four workers were killed, with three more injured and one body which was never recovered. The collapse set back the completion of the Circle Line Stage 1 from 2008 to 17 April 2010.[1]

Art in Transit

Re-claiming the Peripherals by Khiew Huey Chian features how different subjects relating to a place can be developed through various shapes and formations of wild plants which was frequently overlooked in Singapore. It also show that anything can be of value if we just keep an open mind to observe the potential of things around us.

Layout

L2 Overhead Bridge The Concourse, Citygate, St John HQ
L1 Street Level
B1 Service Level Restricted access
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre
B3 Platform B Template:RailRoute/8
Platform A/B
Platform A Template:RailRoute/2

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Nicoll Highway, The Concourse
B Republic Avenue, Marina Promenade

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRT000.png Circle Line

Template:MRTTime Template:MRTTime Template:MRTTime Template:MRTTime Template:MRTTime Template:MRTTime Template:MRTTime Template:MRTTime

Bus

Bus Stop Exit Bus Service
80161 Opp Nicoll Highway Stn
10
14
16
70
70M
196
80169 Nicoll Highway Stn
10
14
16
70
70M
196

References

icon Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL6KeppelCantonmentPrince Edward Road
Circle Line ExtensionPromenadeBayfrontMarina Bay
Rolling Stock 830830C851E
Depots Kim Chuan
Others Bridging Service