Difference between revisions of "North–South Line"

From SgWiki
Jump to navigation Jump to search
m
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Infobox/Line
{{Infobox/Line
|Line=NSL
|Line=NSL
|Code={{Code|1|NSL|NS}}<br>
|Name=North South Line<br>南北线<br>வடக்கு தெற்கு வரி
|Name=North South Line<br>南北线<br>வடக்கு தெற்கு வரி
|Img=[[File:NSL Map.png|centre|300px]]
|Img=[[File:NSL Map.png|centre|300px]]

Revision as of 10:02, 13 November 2019


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
1

North South Line
南北线
வடக்கு தெற்கு வரி
NSL Map.png
Statistics
Status Operational
Termini Jurong East
Marina South Pier
Stations 27
Services 1
Operator(s) SMRT
Rolling stock C151, C651, C751B, C151A, C151B, C151C
Line length 45 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

North South Line (NSL) is the first Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 65 minutes. The line is currently 45 km long with 27 stations.

History

Date Event
7 November 1987 Yio Chu Kang - Toa Payoh
12 December 1987 Toa Payoh - Raffles Place
20 December 1988 Yishun - Yio Chu Kang
4 November 1989 Raffles Place - Marina Bay
Separation of North South Line and East West Line
10 March 1990 Jurong East - Choa Chu Kang (part of East West Line)
10 February 1996 Choa Chu Kang - Yishun
Jurong East - Choa Chu Kang integrated to North South Line
18 September 2010 - 19 September 2010 Jurong East - Bukit Gombak suspended for the construction of Jurong East Modification Project (JEMP)
27 May 2011 Jurong East Modification Project (JEMP) open[1]
23 November 2014 Marina Bay - Marina South Pier[2]
28 May 2017 Switched from Fixed Block Signaling system to Communication Based Train Control Signalling System.
18 May 2019 - 19 May 2019 Woodlands - Yishun suspended for the construction of Canberra station
20 May 2019 Woodlands - Ang Mo Kio suspended for the construction of Canberra station
2 November 2019 Canberra (Added on operation line)

Possible future stations

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:MRTFFF.png North South Line
3
Jurong East Jurong East-NSL-EWL.png Jurong East Terminus
Interchange with East–West Line
Future Interchange with Jurong Region Line
1
Bukit Batok Bukit Batok-NSL.png Bukit Batok South
1
Bukit Gombak Bukit Gombak-NSL.png Bukit Batok North
3
Choa Chu Kang Choa Chu Kang-NSL.png Choa Chu Kang Interchange with Bukit Panjang LRT
Future Interchange with Jurong Region Line
1
Yew Tee Yew Tee-NSL.png Choa Chu Kang North
1
Kranji Kranji-NSL.png Kranji
1
Marsiling Marsiling-NSL.png Woodlands West
2
Woodlands Woodlands-NSL.png Woodlands Central Future Interchange with Thomson–East Coast Line
1
Admiralty Admiralty-NSL.png Woodlands East
1
Sembawang Sembawang-NSL.png Sembawang
1
Canberra Canberra-NSL.png Simpang
1
Yishun Yishun-NSL.png Nee Soon North
1
Khatib Khatib-NSL.png Nee Soon South
1
Yio Chu Kang Yio Chu Kang-NSL.png Yio Chu Kang
2
Ang Mo Kio Ang Mo Kio-NSL.png Ang Mo Kio Future Interchange with Cross Island Line
2
Bishan Bishan-NSL.png Kampong San Teng, San Teng Interchange with Circle Line
1
Braddell Braddell-NSL.png Braddell
1
Toa Payoh Toa Payoh-NSL.png Toa Payoh
1
Novena Novena-NSL.png Thomson
2
Newton Newton-NSL.png Newton Circus Interchange with Downtown Line
2
Orchard Orchard-NSL.png Scotts, Orchard Boulevard Future Interchange with Thomson–East Coast Line
1
Somerset Somerset-NSL.png Killiney
3
Dhoby Ghaut Dhoby Ghaut-NSL.png Dhoby Ghaut Interchange with North East Line and Circle Line
2
City Hall City Hall-NSL-EWL.png Saint Andrew's Interchange with East–West Line
2
Raffles Place Raffles Place-NSL-EWL.png Central Interchange with East–West Line
3
Marina Bay Marina Bay-NSL.png Telok Ayer Basin, Marina South Interchange with Circle Line
Future Interchange with Thomson–East Coast Line
1
Marina South Pier Marina South Pier-NSL.png Marina View, Marina Pier Terminus

Services

Type Ply Between Notes
Full Jurong EastMarina South Pier Withdrawal Trains will terminate at Jurong East Platform C.
SWT Jurong EastAng Mo Kio Operates during Peak Hours/After Peak Hours
SWT Jurong EastYew Tee Operates during evening peak hours in the event of longer waiting times between Jurong East and Yew Tee.
SWT Marina South PierYishun Operates during Peak Hours and late night periods
Special Ang Mo KioPasir Ris Operates during morning peak hours in the event of longer waiting times along EWL.

Rolling stock

The rolling stock consists of Kawasaki Heavy Industries C151, Siemens C651, Kawasaki Heavy Industries & Nippon Sharyo C751B, Kawasaki Heavy Industries & CSR Qingdao Sifang C151A, Kawasaki Heavy Industries & CSR Qingdao Sifang C151B and Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C trains. These trains operate from two depots along the line, Bishan Depot near Bishan station and Ulu Pandan Depot near Jurong East station.

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail

Template:North South Line