North South Line

From SgWiki
Revision as of 10:02, 13 November 2019 by Supernutorcrazy (talk | contribs)
Jump to navigation Jump to search


!
COVID-19 ADVISORY
!
In light of the current COVID-19, sgWiki would like to remind all to:
  • Keep good personal hygiene
  • Wear a mask when not at home unless participating in high strenuous exercise.
  • Visit a clinic if you develop cough, flu and/or fever. Contact the clinic beforehand if you suspected yourself to be infected with the virus.
  • Defer all travel abroad. Singaporeans, Permanent Residents, Long Term Pass holders entering Singapore will be issued a 14-day Stay-Home Notice (SHN).
  • Short-Term visitors are not allowed to enter in Singapore.
  • Observe the necessary Stay-Home Notice (SHN) or Quarantine Order (QO) protocols.
  • For more information, visit Ministry of Health (Singapore) website or World Health Organisation website.


!
TRAVEL ADVISORY
!
SBS Transit SMRT Buses
  • Due to Malaysia's Control Orders,
    • Bus services
      160
      and
      170
      are diverted to loop at Woodlands Centre Rd, skipping all stops in Malaysia.
    • Bus services
      170X
      and
      950
      are suspended.
  • Please refer here (SBS Transit) and here (SMRT Buses) for more information.

Land Transport Authority SBS Transit SMRT Buses:
  • Due to post COVID-19 "Circuit Breaker" measures, all Chinatown Direct, NightRider and Nite Owl bus services, as well as bus services
    188R
    ,
    401
    ,
    926
    and
    963R
    , are suspended. Please refer here for more information.

SMRT Buses
  • Due to Downtown Line (Stage 2) Bus Rationalisation (2020), from Sunday, 16 August 2020;
    • Bus service
      171
      will be shorten to loop at Bukit Panjang MRT/LRT. Affected commuters may take the Downtown Line instead.
    • Bus services
      700
      and
      700A
      will be withdrawn. Affected commuters may take the Downtown Line instead.
    • Bus services
      972
      will be amended to ply Newton MRT instead of Stevens Road. Affected commuters may take bus services
      105
      ,
      132
      or
      190
      instead.
  • Please refer here for more information.

Changi Airport Group Changi Airport Skytrain
  • Due to COVID-19, skytrain services are suspended except Public Service between T3 Station B and T1 Station C.
  • Due to renovation of Terminal 2, skytrain service between T2 Station E and T2 Station F is suspended.

SMRT Thomson–East Coast Line

SMRT Thomson–East Coast Line
  • Due to system integrating test, train services between TE1 Woodlands North and TE3 Woodlands South stations will start at 6.30am and will end at 9pm. Please refer here for more information.

Template:Code
North South Line
南北线
வடக்கு தெற்கு வரி
NSL Map.png
Statistics
Status Operational
Termini Jurong East
Marina South Pier
Stations 27
Services 1
Operator(s) SMRT
Rolling stock C151, C651, C751B, C151A, C151B, C151C
Line length 45 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

North South Line (NSL) is the first Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 65 minutes. The line is currently 45 km long with 27 stations.

History

Date Event
7 November 1987 Yio Chu Kang - Toa Payoh
12 December 1987 Toa Payoh - Raffles Place
20 December 1988 Yishun - Yio Chu Kang
4 November 1989 Raffles Place - Marina Bay
Separation of North South Line and East West Line
10 March 1990 Jurong East - Choa Chu Kang (part of East West Line)
10 February 1996 Choa Chu Kang - Yishun
Jurong East - Choa Chu Kang integrated to North South Line
18 September 2010 - 19 September 2010 Jurong East - Bukit Gombak suspended for the construction of Jurong East Modification Project (JEMP)
27 May 2011 Jurong East Modification Project (JEMP) open[1]
23 November 2014 Marina Bay - Marina South Pier[2]
28 May 2017 Switched from Fixed Block Signaling system to Communication Based Train Control Signalling System.
18 May 2019 - 19 May 2019 Woodlands - Yishun suspended for the construction of Canberra station
20 May 2019 Woodlands - Ang Mo Kio suspended for the construction of Canberra station
2 November 2019 Canberra (Added on operation line)

Possible future stations

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
North South Line
Template:Code Jurong East Jurong East-NSL-EWL.png Jurong East Terminus
Interchange with East West Line
Future Interchange with Jurong Region Line
Template:Code Bukit Batok Bukit Batok-NSL.png Bukit Batok South
Template:Code Bukit Gombak Bukit Gombak-NSL.png Bukit Batok North
Template:Code Choa Chu Kang Choa Chu Kang-NSL.png Choa Chu Kang Interchange with Bukit Panjang LRT
Future Interchange with Jurong Region Line
Template:Code Yew Tee Yew Tee-NSL.png Choa Chu Kang North
Template:Code Kranji Kranji-NSL.png Kranji
Template:Code Marsiling Marsiling-NSL.png Woodlands West
Template:Code Woodlands Woodlands-NSL.png Woodlands Central Future Interchange with Thomson–East Coast Line
Template:Code Admiralty Admiralty-NSL.png Woodlands East
Template:Code Sembawang Sembawang-NSL.png Sembawang
Template:Code Canberra Canberra-NSL.png Simpang
Template:Code Yishun Yishun-NSL.png Nee Soon North
Template:Code Khatib Khatib-NSL.png Nee Soon South
Template:Code Yio Chu Kang Yio Chu Kang-NSL.png Yio Chu Kang
Template:Code Ang Mo Kio Ang Mo Kio-NSL.png Ang Mo Kio Future Interchange with Cross Island Line
Template:Code Bishan Bishan-NSL.png Kampong San Teng, San Teng Interchange with Circle Line
Template:Code Braddell Braddell-NSL.png Braddell
Template:Code Toa Payoh Toa Payoh-NSL.png Toa Payoh
Template:Code Novena Novena-NSL.png Thomson
Template:Code Newton Newton-NSL.png Newton Circus Interchange with Downtown Line
Template:Code Orchard Orchard-NSL.png Scotts, Orchard Boulevard Future Interchange with Thomson–East Coast Line
Template:Code Somerset Somerset-NSL.png Killiney
Template:Code Dhoby Ghaut Dhoby Ghaut-NSL.png Dhoby Ghaut Interchange with North East Line and Circle Line
Template:Code City Hall City Hall-NSL-EWL.png Saint Andrew's Interchange with East West Line
Template:Code Raffles Place Raffles Place-NSL-EWL.png Central Interchange with East West Line
Template:Code Marina Bay Marina Bay-NSL.png Telok Ayer Basin, Marina South Interchange with Circle Line
Future Interchange with Thomson–East Coast Line
Template:Code Marina South Pier Marina South Pier-NSL.png Marina View, Marina Pier Terminus

Services

Type Ply Between Notes
Full Jurong EastMarina South Pier Withdrawal Trains will terminate at Jurong East Platform C.
SWT Jurong EastAng Mo Kio Operates during Peak Hours/After Peak Hours
SWT Jurong EastYew Tee Operates during evening peak hours in the event of longer waiting times between Jurong East and Yew Tee.
SWT Marina South PierYishun Operates during Peak Hours and late night periods
Special Ang Mo KioPasir Ris Operates during morning peak hours in the event of longer waiting times along EWL.

Rolling stock

The rolling stock consists of Kawasaki Heavy Industries C151, Siemens C651, Kawasaki Heavy Industries & Nippon Sharyo C751B, Kawasaki Heavy Industries & CSR Qingdao Sifang C151A, Kawasaki Heavy Industries & CSR Qingdao Sifang C151B and Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C trains. These trains operate from two depots along the line, Bishan Depot near Bishan station and Ulu Pandan Depot near Jurong East station.

References

Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North South LineEast West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks C151C151AC151BC151CCT251C651C751AC751BC751CC830C830CC951
FutureC851E • CJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East Coast • Tengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North South LineEast West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureHigh Speed Rail • Johor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
North South Line [ VTE ]
Stations Jurong EastBukit BatokBukit GombakChoa Chu KangYew TeeKranjiMarsilingWoodlandsAdmiraltySembawangCanberraYishunKhatibYio Chu KangAng Mo KioBishanBraddellToa PayohNovenaNewtonOrchardSomersetDhoby GhautCity HallRaffles PlaceMarina BayMarina South Pier
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots BishanUlu Pandan