Difference between revisions of "Sengkang Depot"

From SgWiki
Jump to navigation Jump to search
m
m
Line 7: Line 7:
}}
}}


'''Sengkang Depot''' is the fifth train depot in Singapore, and the first depot to share common stablising area for both [[Mass Rapid Transit]] (MRT) and [[Light Rail Transit]] (LRT) trains. It maintains trains for the {{NEL}}, {{SKLRT}} and {{PGLRT}} and also houses the control centre of the three lines.
'''Sengkang Depot''' is the fifth train depot in Singapore, and the first depot to share common stabling area for both [[Mass Rapid Transit]] (MRT) and [[Light Rail Transit]] (LRT) trains. It maintains trains for the {{NEL}}, {{SKLRT}} and {{PGLRT}} and also houses the control centre of the three lines.


==History==
==History==

Revision as of 00:59, 9 February 2019


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
Sengkang Depot
盛港车厂
செங்காங்ப பணிமனை
Statistics
Address 91 Sengkang East Avenue
Singapore 545072
Line(s) North East Line
Sengkang LRT
Punggol LRT
Rolling Stock(s) C751A
C751C
C810
C810A

Sengkang Depot is the fifth train depot in Singapore, and the first depot to share common stabling area for both Mass Rapid Transit (MRT) and Light Rail Transit (LRT) trains. It maintains trains for the North East Line, Sengkang LRT and Punggol LRT and also houses the control centre of the three lines.

History

Date Event
18 January 2003 Depot officially opens

Reception Tracks

On the North East Line, it has 3 reception tracks, 2 that lead to Sengkang station and 1 to Hougang station.

On the Sengkang LRT and Punggol LRT, it has 2 reception tracks, 1 that lead towards Tongkang station and 1 to Layar station.

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah
icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A810810A
Future801B810D
Depots SengkangTen Mile Junction
icon North East Line [ VTE ]
Stations HarbourFrontOutram ParkChinatownClarke QuayDhoby GhautLittle IndiaFarrer ParkBoon KengPotong PasirWoodleighSerangoonKovanHougangBuangkokSengkangPunggol
North East Line extension: Punggol Coast
Rolling Stock 751A751C851E
Depots Sengkang
Others Bridging Service
icon Sengkang LRT [ VTE ]
Stations Sengkang
East LoopCompassvaleRumbiaBakauKangkarRanggung
West LoopCheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock 810810A810D
Depots Sengkang
Others Sengkang LRT Bridging Service
icon Punggol LRT [ VTE ]
Stations Punggol
East LoopCoveMeridianCoral EdgeRivieraKadaloorOasisDamai
West LoopSam KeeTeck LeePunggol PointSamuderaNibongSumangSoo Teck
Rolling Stock 810810A810D
Depots Sengkang
Others Punggol LRT Bridging Service