Sengkang LRT

From SgWiki
Jump to navigation Jump to search

Template:Line Infobox

Sengkang LRT (SKLRT) is the second Light Rail Transit (LRT) line. Traveling one loop takes about 30 minutes. The line is currently 10.7 km long with 14 stations and it is fully automated.

History

Date Event
18 January 2003 Template:STN, Template:STN - Template:STN
29 January 2005 Template:STN - Template:STN (West Loop operated in Uni-Direction)
15 November 2007 Template:STN
4 January 2010 West Loop operated in both direction during Weekdays Peak Hour.
1 January 2013 Template:STN
West Loop operated in both direction throughout the day.
27 June 2015 Template:STN
22 December 2015 Two-car trains started operation.

Stations

Alpha-Numeric
Code
Station Name Notes
Sengkang LRT
2
Template:STN Terminus
Interchange with North East Line
East Loop
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
West Loop
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN

Services

Service Route Notes
A Template:STNTemplate:STNTemplate:STNTemplate:STN
B Template:STNTemplate:STNTemplate:STNTemplate:STN
C Template:STNTemplate:STNTemplate:STNTemplate:STN
D Template:STNTemplate:STNTemplate:STNTemplate:STN

Rolling stock

The rolling stock consists of Mitsubishi Heavy Industries C810 and Mitsubishi Heavy Industries C810A trains. These trains operate from Sengkang Depot near Template:STN.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A810810A
Future801B810D
Depots SengkangTen Mile Junction

Template:Railway Lines in Singapore

icon Sengkang LRT [ VTE ]
Stations Sengkang
East LoopCompassvaleRumbiaBakauKangkarRanggung
West LoopCheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock 810810A810D
Depots Sengkang
Others Sengkang LRT Bridging Service