Difference between revisions of "Senja station"

From SgWiki
Jump to navigation Jump to search
m (→‎Bus: Service 972M Introduced)
Line 70: Line 70:
{|class="wikitable"
{|class="wikitable"
!width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service
!width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service
{{BusGuide|44641|Blk 602|A}}{{Bus|920|SMRT}} {{Bus|922|SMRT}} {{Bus|971E|SMRT}} {{Bus|972|SMRT}} {{Bus|972M|SMRT}} {{Bus|976|SMRT}}
{{BusGuide|44641|Blk 602|A}}{{Bus|920|SMRT}} {{Bus|922|SMRT}} {{Bus|971|SMRT}} {{Bus|972|SMRT}} {{Bus|972M|SMRT}} {{Bus|976|SMRT}}
{{BusGuide|44649|Blk 541A CP|A}}{{Bus|920|SMRT}} {{Bus|922|SMRT}} {{Bus|971E|SMRT}} {{Bus|972|SMRT}} {{Bus|972M|SMRT}} {{Bus|976|SMRT}}
{{BusGuide|44649|Blk 541A CP|A}}{{Bus|920|SMRT}} {{Bus|922|SMRT}} {{Bus|971|SMRT}} {{Bus|972|SMRT}} {{Bus|972M|SMRT}} {{Bus|976|SMRT}}
|}
|}



Revision as of 00:59, 31 August 2020


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
Template:Code/1
Senja
信佳
சென்ஜா
Senja-BPLRT.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 90 Bukit Panjang Ring Road
Singapore 679942
Line(s) Bukit Panjang LRT
Structure Elevated
Connections File:Bus Logo.png

Segar (BP11) is a Light Rail Transit (LRT) station on the Bukit Panjang LRT.

History

Date Event
6 November 1999 Station officially opened

2002 train disruption

On 21 October 2002, the entire Bukit Panjang LRT was shut down at 6.38am after a disruption caused by a dislodged train wheel, which led to the power system being crippled between Bukit Panjang and Senja stations. Partial LRT services only resumed at 6.30pm on 24 October 2002 and full services at 12pm on 26 October 2002.[1]

2015 train disruption

On 9 March 2015, during the evening peak hours, the Bukit Panjang LRT was suspended from service for a full 24 hours due to a power trip which was caused by a fire. The fire was caused due to a sudden power surge and the fuse box failed to handle the surge. Usually the fuse box will trip the system and activate safety measures, but on that day the fuse box failed to do so and instead burst into flames. The problem was identified as arcing problem which was why the power "jumped". The reason for how the fire started, however, is still a mystery to this day.[2]

Layout

L2
Platform 2
2Platform Service A: BP13SenjaBP12JelapangBP7PetirBP1NS4Choa Chu Kang
1Platform Service B: BP1NS4Choa Chu KangBP6DT1Bukit PanjangBP13Senja
Platform 1
L1 Concourse Faregates, Ticketing Machines
Street Level

Notes: Platform 2 will opens between start of operation and 9am and between 5pm and 8pm on weekdays except public holiday.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Bt Panjang Ring Rd, Senja Rd

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:LRTFFF.png Bukit Panjang LRT
BP1Choa Chu Kang 05:15 05:15 05:33 23:48
BP1Choa Chu Kang
   via BP7Petir
05:00 20:08

Bus

Bus Stop Exit Bus Service
44641 Blk 602
920
922
971
972
972M
976
44649 Blk 541A CP
920
922
971
972
972M
976

References

icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bukit Panjang LRT Bridging Service