Tanah Merah station

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
1

Tanah Merah
丹那美拉
தானா மேரா
Tanah Merah-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 920 New Upper Changi Road
Singapore 467356
Line(s) East–West Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation TNM

Tanah Merah (EW4) is an elevated Mass Rapid Transit (MRT) station on the East–West Line.

The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. The station is also the only MRT interchange station to have only one official alphanumeric symbol. However, to specify the separation of the extension with the main line, the code

2S

will be used instead.

Similar to other stations on the eastern section of the East West Line, the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station.

History

Date Event
4 November 1989 Station officially opens
30 March 2011 Half-Height Platform Screen Doors operates
5 January 2013 High Volume, Low Speed Blade fans operates

Tanah Merah Modification Project

An artist impression of the station with the additional platform

The Tanah Merah Modification Project (TMBP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airprot at a shorter intervals. Constructions will commence soon and is expected to be completed by 2024.[1]

Layout

L2 Platform A East–West Line
Template:Terminus
Platform A/C
Platform C/D East–West Line
Template:Terminus
Platform B/D
Platform B East–West Line
Template:Terminus
L1 Concourse Faregates, Ticketing Machines, Passenger Service Centre
Street Level
B1 Underpass

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access New Upper Changi Road, APSN Katong School, Bedok View Secondary School
B Handicapped/disabled access New Upper Changi Road

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
85099 Tanah Merah Stn Exit A
2
9
12
12e
14
24
31
35
35M
38
45
47
48
85091 Tanah Merah Stn Exit B
2
9
12
12e
14
24
31
35
35M
38
45
47
48
NR7

References

Template:East West Line