Difference between revisions of "Teck Lee station"

From SgWiki
Jump to navigation Jump to search
Line 12: Line 12:
{| class="layout"
{| class="layout"
!rowspan=3|L3
!rowspan=3|L3
|colspan=2|{{RailRoute/6|2|PGLRT right|C|{{PW2}}|{{PW3}}|{{PW7}}|{{PTC}}}}
|colspan=2|{{RailRoute/5|1|PGLRT right|A|{{PW2}}|{{PW1}}|{{PTC}}}}
|-
|-
|colspan=2 class="platform"|Platform 1/2
|colspan=2 class="platform"|Platform 1/2
|-
|-
|colspan=2|{{RailRoute/5|1|PGLRT left|D|{{PTC}}|{{PW1}}|{{PW2}}}}
|colspan=2|{{RailRoute/6|2|PGLRT left|B|{{PTC}}|{{PW7}}|{{PW3}}|{{PW2}}}}
|-
|-
!width=25|L2
!width=25|L2

Revision as of 22:09, 21 April 2020


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
1

Teck Lee
德利
டெக் லீ
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 101 Ponggol Seventeenth Avenue
Singapore 828861
Line(s) Punggol LRT

Teck Lee (PW2) is a future elevated Light Rail Transit (LRT) station on the Punggol LRT.

Layout

L3 Template:RailRoute/5
Platform 1/2
Template:RailRoute/6
L2 Concourse Faregates, Ticketing Machines
L1 Street Level

References


icon Punggol LRT [ VTE ]
Stations Punggol
East LoopCoveMeridianCoral EdgeRivieraKadaloorOasisDamai
West LoopSam KeeTeck LeePunggol PointSamuderaNibongSumangSoo Teck
Rolling Stock 810810A810D
Depots Sengkang
Others Punggol LRT Bridging Service