East–West Line
- Due to track maintenance works (replacement of electrical cables), from 25 April 2021 till 23 May 2021, train services between EW291Joo Koon and EW331Tuas Link stations will be suspended on Sundays. Please refer here for more information.
East–West Line
- Due to track maintenance works (replacement of electrical cables), there is no train services between EW291Joo Koon and EW331Tuas Link stations. Please refer here for more information.
Changi Airport Skytrain
- Due to COVID-19, skytrain services are suspended except Public Service between T31 Station B and T11 Station C.
- Due to renovation of Terminal 2, skytrain service between T21 Station E and T21 Station F is suspended.
- Due to Malaysia's Control Orders,
- Bus services
160 and 170 are diverted to loop at Woodlands Centre Road, skipping all stops in Malaysia.
- Bus services
170X and 950 are suspended.
- Please refer here (SBS Transit) and here (SMRT Buses) for more information.
- Due to post COVID-19 "Circuit Breaker" measures, all Chinatown Direct, NightRider and Nite Owl bus services, as well as bus services
188R , 401 , 926 and 963R are suspended. Please refer here for more information.
Template:Tower Transit Singapore
- From Saturday, 29 May 2021, bus service
944 will be operated by Tower Transit. Please refer here for more information.
- From Saturday, 29 May 2021, bus service
974 will be operated by SBS Transit. Please refer here for more information.
Template:Tower Transit Singapore
- From Monday, 31 May 2021, City Direct services
653 and 657 will be operated by Tower Transit. Please refer here and here for more information.
- From Monday, 31 May 2021, City Direct service
665 will be operated by SMRT Buses. Please refer here for more information.
Template:Tower Transit Singapore
- From Monday, 31 May 2021, Short-Trip bus service
66C will be introduced to start from Jurong East interchange and end at Opp Beauty World Station. Short-Trip bus services 66A and 66B will be withdrawn. Please refer here for more information.
|