Toa Payoh station

From SgWiki
Revision as of 17:05, 1 September 2017 by Supernutorcrazy (talk | contribs) (Created page with "{{Infobox/Station |Code={{Code|1|NSL|NS19}} |Name=Toa Payoh<br>大巴窑<br>தோ பாயோ |Img=centre|300px |Info= {{Infoline|Address|510 Lorong...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 18 March 2024, supplementary bus service
    983M
    will be introduced, plying from Choa Chu Kang Road and terminating at Teck Whye Crescent (B/S 44969 (Aft Teck Whye Walk)). This service operates only on weekday mornings, except school and public holidays.

Please refer here for more information.


SBS Transit
  • From Sunday, 24 March 2024, bus services
    141
    and
    235
    will call at a new bus stop along Toa Payoh Rise, in front of Blk 131B (B/S 51199). Please refer here for more information.


SBS Transit
  • From Monday, 25 March 2024, the first bus timings of bus service
    50
    from B/S 65321 (Kadaloor Stn Exit B) will be brought forward on Weekdays (except Public Holidays). Please refer here for more information.

SBS Transit
  • From Sunday, 24 March 2024, bus services
    182
    and
    182M
    will call at a new bus stop along Jalan Ahmad Ibrahim, in front of the Singapore Rail Test Centre (B/S 25251). Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
1

Toa Payoh
大巴窑
தோ பாயோ
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 510 Lorong 6 Toa Payoh
Singapore 319398
Line(s) North–South Line
Connections Bus, Taxi
Abbreviation TAP

Toa Payoh (NS19) is an underground Mass Rapid Transit (MRT) station on the North South Line.

History

Date Event
7 November 1987 Station officially opens
8 January 2006 Exercise Northstar V

This station was the first MRT station in Singapore to be completed, topping out on 5 August 1985, making it the first underground station in the world to be fitted with platform screen doors. Today, the concourse area bears the inauguration plate of Singapore's MRT system.

Layout

L1 Street Level HDB Hub, Toa Payoh Bus Interchange
B1 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
B2 Platform A North–South Line
Template:Terminus
Platform A/B
Platform B North–South Line
Template:Terminus

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access HDB HUB, Toa Payoh Bus Interchange
B Handicapped/disabled access Toa Payoh Bus Interchange
C Handicapped/disabled access Toa Payoh Central
D Handicapped/disabled access Lorong 2 Toa Payoh, Toa Payoh Methodist Church

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
52009 Toa Payoh Int
8
26
28
31
73
88
90
139
139M
141
142
143
145
155
157
159
163
231
232
235
238
52501 Toa Payoh Swim Cplx
8
26
28
31
57
59
73
88
90
142
155
157
159
163
235
238
506
52509 Opp Toa Payoh Swim Cplx
8
26
28
31
57
59
73
88
90
142
155
157
159
163
232
235
238
506
52189 Toa Payoh Stn
56
105
129
153
232
52181 Opp Toa Payoh Stn
56
105
129
153
NR1

References


Template:Singapore MRT stations Template:North South Line