Toa Payoh station

From SgWiki
Revision as of 17:13, 1 September 2017 by Supernutorcrazy (talk | contribs)
Jump to: navigation, search


!
TRAVEL ADVISORY
!
SMRT North South Line: Train service between Jurong East and Kranji stations will end at 11pm. Shuttle bus service is available. Certain bus service will be extended to coincide with the last bus timing. Please refer here for more information.
SBS Transit SMRT Buses Tower Transit Go-Ahead: Bus services plying Promenade / City Hall / Marina Bay areas will be diverted due to Singapore Airlines Formula 1 Grand Prix. Bus arrival timings for such services will not be available.
SMRT SBS Transit: Train Service will be extended tonight. Certain bus services will be extended to coincided with the last train timing. Please refer here for more information.
SBS Transit: From 22 September 2019, Bus Service 102 will call an additional pair of bus stops along Seletar Aerospace Drive. Please refer here for more information.
Tower Transit: From 23 September 2019, Bus Service 990 will depart earlier at selected stops on Weekdays and Saturdays except Public Holidays. Please refer here for more information.
SBS Transit: Bus Service 195 will be amended to start/end at Kampong Bahru Bus Terminal instead of Marina Centre Terminal from 18 September 2019 to 23 September 2019. Please refer here for more information.
SMRT North South Line: Canberra MRT station will commence operation on 2 November 2019. Please refer here for more information.
NS19
Toa Payoh
大巴窑
தோ பாயோ
Statistics
Address 510 Lorong 6 Toa Payoh
Singapore 319398
Line(s) North South Line
Connections Bus, Taxi
Abbreviation TAP

Toa Payoh (NS19) is an underground Mass Rapid Transit (MRT) station on the North South Line.

History

Date Event
7 November 1987 Station officially opens
8 January 2006 Exercise Northstar V

This station was the first MRT station in Singapore to be completed, topping out on 5 August 1985, making it the first underground station in the world to be fitted with platform screen doors. Today, the concourse area bears the inauguration plate of Singapore's MRT system.

Layout

L1 Street Level HDB Hub, Toa Payoh Bus Interchange
B1 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
B2 Platform A North South Line
Template:Terminus
Platform A/B
Platform B North South Line
Template:Terminus

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access HDB HUB, Toa Payoh Bus Interchange
B Handicapped/disabled access Toa Payoh Bus Interchange
C Handicapped/disabled access Toa Payoh Central
D Handicapped/disabled access Lorong 2 Toa Payoh, Toa Payoh Methodist Church

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
(52009) Toa Payoh Int A/B
8
26
28
31
73
88
90
139
139M
141
142
143
145
155
157
159
163
231
232
235
238
(52501) Toa Payoh Swim Cplx A
8
26
28
31
57
59
73
88
90
142
155
157
159
163
235
238
506
(52509) Opp Toa Payoh Swim Cplx A
8
26
28
31
57
59
73
88
90
142
155
157
159
163
232
235
238
506
(52189) Toa Payoh Stn C
56
105
129
153
232
(52181) Opp Toa Payoh Stn D
56
105
129
153
NR1

References


Template:Singapore MRT stations

North South Line [ VTE ]
Stations Jurong EastBukit BatokBukit GombakChoa Chu KangYew TeeKranjiMarsilingWoodlandsAdmiraltySembawangCanberraYishunKhatibYio Chu KangAng Mo KioBishanBraddellToa PayohNovenaNewtonOrchardSomersetDhoby GhautCity HallRaffles PlaceMarina BayMarina South Pier
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots BishanUlu Pandan