Difference between revisions of "Tuas Crescent station"
Jump to navigation
Jump to search
m (→Layout) |
m |
||
(9 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Infobox/Station | {{Infobox/Station | ||
|Code={{Code| | |TA1=REW | ||
|Code={{Code/S|EW31|EWL}} | |||
|Name=Tuas Crescent<br>大士弯<br>துவாஸ் கிரசண்ட் | |Name=Tuas Crescent<br>大士弯<br>துவாஸ் கிரசண்ட் | ||
|Img=[[File:Tuas Crescent-EWL.png|centre|300px]] | |Img=[[File:Tuas Crescent-EWL.png|centre|300px]] | ||
Line 6: | Line 7: | ||
{{Infoline|Address|90 Pioneer Road<br>Singapore 639608}} | {{Infoline|Address|90 Pioneer Road<br>Singapore 639608}} | ||
{{Infoline|Line(s)|{{EWL}}}} | {{Infoline|Line(s)|{{EWL}}}} | ||
{{Infoline|Structure|Elevated}} | |||
{{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]] [[File:Taxi Logo.png|25px|link=|alt=Taxi]]}} | {{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]] [[File:Taxi Logo.png|25px|link=|alt=Taxi]]}} | ||
{{Infoline|Abbreviation|TCR}} | {{Infoline|Abbreviation|TCR}} | ||
}} | }} | ||
'''Tuas Crescent (EW31)''' is | '''Tuas Crescent (EW31)''' is a [[Mass Rapid Transit]] (MRT) station on the {{EWL}}. | ||
==History== | ==History== | ||
Line 16: | Line 18: | ||
!width=150|Date!!Event | !width=150|Date!!Event | ||
|- | |- | ||
|18 June 2017||Station officially | |18 June 2017||Station officially opened | ||
|- | |||
|16 November 2017 - 19 November 2017||Station closed due to the {{Stn|Joo Koon}} train collision<ref>[//www.lta.gov.sg/content/ltagov/en/newsroom/2017/11/2/joint-statement-by-the-land-transport-authority-lta-smrt---joo-koon-train-incident.html "Joint Statement by the Land Transport Authority (LTA) & SMRT - Joo Koon train incident"]. Land Transport Authority (15 November 2017).</ref> | |||
|- | |||
|10, 17 December 2017||Station closed due to the upgrading of signaling system on the {{EWL}}<ref>[//www.channelnewsasia.com/news/singapore/2-full-day-shutdowns-shorter-operating-hours-for-19-nsewl-mrt-9425326 "2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT"]. Channel NewsAsia (21 November 2017).</ref> | |||
|- | |||
|14, 21, 28 March 2021||rowspan=3|Station closed due to the replacement of electrical cable on the {{EWL}}<ref>[//www.channelnewsasia.com/news/singapore/east-west-line-selected-stations-closed-sundays-cable-works-14315464 "Selected East-West Line MRT stations to close on Sundays for cable replacement works"]. Channel NewsAsia (2 March 2021).</ref> | |||
|- | |||
|4, 11, 18, 25 April 2021 | |||
|- | |||
|2, 9, 16, 23 May 2021 | |||
|} | |} | ||
Line 22: | Line 34: | ||
{| class="layout" | {| class="layout" | ||
!rowspan=3|L3 | !rowspan=3|L3 | ||
| | |colspan=2|{{Route/3|EWL|A|l|{{CurrentStn|EW31|l=}}|{{NextStn|EW30}}|{{NextStn|EW4}}|{{NextStn|EW1}}|{{NextStn|CG2}}}} | ||
|- | |- | ||
|colspan=2 class="platform"|Platform A/B | |colspan=2 class="platform"|Platform A/B | ||
|- | |- | ||
| | |colspan=2|{{Route/1|EWL|B|r|{{NextStn|EW33}}|{{NextStn|EW32}}|{{CurrentStn|EW31|r=}}}} | ||
|- | |- | ||
!width=25|L2 | !width=25|L2 | ||
Line 53: | Line 65: | ||
!width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily | !width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily | ||
|- | |- | ||
!colspan=5 | !colspan=5 style="{{CSS/EWL|s=|t=}}text-align:center;"|[[File:MRTFFF.png|20px|link=|alt=]] {{EWL|style={{CSS/EWL|nobg=|bg=none|s=|t=}}}} | ||
{{ | {{Timing|EW1||05:23|05:23|05:53|23:23|nv=}} | ||
{{ | {{Timing|EW33||05:32|05:32|06:02|00:44|nv=}} | ||
|} | |} | ||
Revision as of 21:03, 26 July 2021
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
Please refer here for more information.
|
EW31 Tuas Crescent 大士弯 துவாஸ் கிரசண்ட்*Graphic From SGTrains/Wikipedia/LTA | |
Statistics | |
---|---|
Address | 90 Pioneer Road Singapore 639608 |
Line(s) | East–West Line |
Structure | Elevated |
Connections | File:Bus Logo.png File:Taxi Logo.png |
Abbreviation | TCR |
Tuas Crescent (EW31) is a Mass Rapid Transit (MRT) station on the East–West Line.
History
Date | Event |
---|---|
18 June 2017 | Station officially opened |
16 November 2017 - 19 November 2017 | Station closed due to the Joo Koon train collision[1] |
10, 17 December 2017 | Station closed due to the upgrading of signaling system on the East–West Line[2] |
14, 21, 28 March 2021 | Station closed due to the replacement of electrical cable on the East–West Line[3] |
4, 11, 18, 25 April 2021 | |
2, 9, 16, 23 May 2021 |
Layout
L3 | Template:Route/3 | ||
---|---|---|---|
Platform A/B | |||
| |||
L2 | Concourse | Faregates, Ticketing Machines, Passenger Service Centre | |
L1 | Street Level |
Exits
Exit | Disabled-Access | Location/Nearby |
---|---|---|
A | Tuas Crescent, Tuas Avenue 1 | |
B | Tuas Crescent, Tuas Avenue 2 |
Transport Services
First/Last Train Timing
Destination | First Train | Last Train | ||
---|---|---|---|---|
Mon − Fri | Sat | Sun & P.H. | Daily | |
File:MRTFFF.png East–West Line | ||||
EW1Pasir Ris | 05:23 | 05:23 | 05:53 | 23:23 |
EW33Tuas Link | 05:32 | 05:32 | 06:02 | 00:44 |
Bus
Bus Stop | Exit | Bus Service |
---|---|---|
24709 | Tuas Cres Stn Exit A |
247 254
|
24701 | Tuas Cres Stn Exit B |
247
|
References
- ↑ "Joint Statement by the Land Transport Authority (LTA) & SMRT - Joo Koon train incident". Land Transport Authority (15 November 2017).
- ↑ "2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT". Channel NewsAsia (21 November 2017).
- ↑ "Selected East-West Line MRT stations to close on Sundays for cable replacement works". Channel NewsAsia (2 March 2021).