Difference between revisions of "North East Line"

From SgWiki
Jump to navigation Jump to search
m
Line 1: Line 1:
{{Infobox/Line
{{Infobox/Line
|TA=RNE
|Line=NEL
|Line=NEL
|Code={{Code|1|NEL|NE}}<br>
|Code={{Code|1|NEL|NE}}<br>

Revision as of 11:52, 29 May 2020

!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit SMRT Trains Tower Transit Go-Ahead

SMRT Buses
  • From 22 December 2024, bus service 193 will serve an additional bus stop along Benoi Road, opposite Joo Koon Interchange. Please refer here for more information.

SBS Transit Go-Ahead
  • From Thursday, 2 January 2025, City Direct Services 675, 676, 677 & 678 will be introduced to provide a faster connection to the city for commuters along the North-East Corridor. Please refer here for more information.

SMRT Buses
  • From Sunday, 12 January 2025, bus service 967 will be introduced to enhance connectivity for commuters in Marsiling and Admiralty to nearby transport nodes and local amenities in Woodlands. Please refer here for more information.

SMRT Buses
  • From Monday, 13 January 2025, bus service 912M will be withdrawn with the introduction of new bus service 967 under the Land Transport Authority’s Bus Connectivity Enhancement Programme (BCEP). Please refer here for more information.

1

North East Line
东北线
வடக்கு கிழக்கு வரி
NEL Map.png
Statistics
Status Operational
Termini HarbourFront
Punggol
Stations 17 (1 U/C)
Services 1
Operator(s) SBS Transit
Rolling stock C751A, C751C
Line length 19.3 km
Track gauge 1,435 mm standard gauge
Electrification 1500V DC Overhead catenary

North East Line (NEL) is the third Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 35 minutes. The line is currently 19.3 km long with 16 stations and it is fully underground and automated.

It is the first line to have artwork integrated into all its 16 stations under the Art in Transit programme.

History

Date Event
20 June 2003 HarbourFront - Punggol
15 January 2006 Buangkok (Opened on operational line)
20 June 2011 Woodleigh (Opened on operational line)

North East Line Extension

On 17 January 2013, a 2-kilometre extension which will run from Punggol through Punggol North including the new Punggol Downtown was announced. It is expected to be completed by 2023.[1]

Possible future stations

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:MRTFFF.png North East Line
2
HarbourFront HarbourFront-NEL.png World Trade Centre Terminus
Interchange with Circle Line
3
Outram Park Outram Park-NEL.png Outram Park Interchange with East–West Line
Future Interchange with Thomson–East Coast Line
2
Chinatown Chinatown-NEL.png People's Park Interchange with Downtown Line
1
Clarke Quay Clarke Quay-NEL.png Clarke Quay
3
Dhoby Ghaut Dhoby Ghaut-NEL.png Dhoby Ghaut Interchange with North–South Line and Circle Line
2
Little India Little India-NEL.png Kadang Kerbau Interchange with Downtown Line
1
Farrer Park Farrer Park-NEL.png Farrer Park
1
Boon Keng Boon Keng-NEL.png Boon Keng
1
Potong Pasir Potong Pasir-NEL.png Sennett
1
Woodleigh Woodleigh-NEL.png Woodleigh
2
Serangoon Serangoon-NEL.png Serangoon Interchange with Circle Line
1
Kovan Kovan-NEL.png Kovan
2
Hougang Hougang-NEL.png Hougang Future Interchange with Cross Island Line
1
Buangkok Buangkok-NEL.png Buangkok
2
Sengkang Sengkang-NEL.png Sengkang Interchange with Sengkang LRT
3
Punggol Punggol-NEL.png Punggol Terminus
Interchange with Punggol LRT
Future Interchange with Cross Island Line
File:MRTFFF.png North East Line Extension
1
Punggol Coast Punggol Coast Under Construction

Services

Service Starting Terminate at Notes
Full HarbourFront Punggol
Full Punggol HarbourFront

Rolling stock

The rolling stock consists of Alstom Metropolis C751A and Alstom Metropolis C751C trains. These trains operate from Sengkang Depot near Buangkok station.

References

  1. "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. Retrieved 17 January 2013.
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751C830830C851E951

Former651751B

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon North East Line [ VTE ]
Stations HarbourFrontOutram ParkChinatownClarke QuayDhoby GhautLittle IndiaFarrer ParkBoon KengPotong PasirWoodleighSerangoonKovanHougangBuangkokSengkangPunggolPunggol Coast
Rolling Stock 751A751C851E
Depots Sengkang
Others Bridging Service