Difference between revisions of "North East Line"
Jump to navigation
Jump to search
m |
m (→Stations) |
||
Line 38: | Line 38: | ||
==Stations== | ==Stations== | ||
{| class="wikitable" | <div style="overflow-y:auto;width=100%"> | ||
{| class="wikitable" style='white-space:nowrap;" | |||
!style="{{CSS/LTA}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA}}"|Station Name!!style="{{CSS/LTA}}"|Image!!style="{{CSS/LTA}}"|Working names!!style="{{CSS/LTA}}"|Notes | !style="{{CSS/LTA}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA}}"|Station Name!!style="{{CSS/LTA}}"|Image!!style="{{CSS/LTA}}"|Working names!!style="{{CSS/LTA}}"|Notes | ||
|- | |- | ||
Line 62: | Line 63: | ||
{{Stnline|{{Code/1|NE18|{{CSS/NEL|nobg=|fg=|bc=}}|dashed}}|Punggol Coast|NEL|Img=|Note=Under Construction}} | {{Stnline|{{Code/1|NE18|{{CSS/NEL|nobg=|fg=|bc=}}|dashed}}|Punggol Coast|NEL|Img=|Note=Under Construction}} | ||
|} | |} | ||
</div> | |||
==Services== | ==Services== |
Revision as of 09:45, 25 July 2020
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
|
Template:Code/1 North East Line 东北线 வடக்கு கிழக்கு வரி | |
Statistics | |
---|---|
Status | Operational |
Termini | HarbourFront Punggol |
Stations | 17 (1 U/C) |
Services | 1 |
Operator(s) | |
Rolling stock | C751A, C751C |
Line length | 19.3 km |
Track gauge | 1,435 mm standard gauge |
Electrification | 1500V DC Overhead catenary |
North East Line (NEL) is the third Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 35 minutes. The line is currently 19.3 km long with 16 stations and it is fully underground and automated. It is the first line to have artwork integrated into all its 16 stations under the Art in Transit programme.
History
Date | Event |
---|---|
20 June 2003 | HarbourFront - Punggol |
15 January 2006 | Buangkok (Opened on operational line) |
20 June 2011 | Woodleigh (Opened on operational line) |
North East Line Extension
On 17 January 2013, a 2-kilometre extension which will run from Punggol through Punggol North including the new Punggol Downtown was announced. It is expected to be completed by 2023.[1]
Possible future stations
- NE2: 1 new station between HarbourFront & Outram Park
Stations
Services
Type | Ply Between | Notes |
---|---|---|
Full | HarbourFront ↔ Punggol |
Rolling stock
The rolling stock consists of Alstom Metropolis C751A and Alstom Metropolis C751C trains. These trains operate from Sengkang Depot near Buangkok station.
References
- ↑ "North East Line Extension". Land Transport Authority. Retrieved 24 June 2020.
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line
FutureJurong Region Line • Cross Island Line | |
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 751A • 751C • 830 • 830C • 851E • 951
Future J151 • CR151 | |
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
Future Changi East • East Coast • Tengah |
Railway Lines in Singapore | [ V • T • E ] | |
---|---|---|
Mass Rapid Transit (MRT) | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Light Rail Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Cross-border | KTM Intercity | |
FutureJohor Bahru–Singapore Rapid Transit System | ||
Others | Changi Airport Skytrain • Sentosa Express | |
DefunctSentosa Monorail |
North East Line | [ V • T • E ] | |
---|---|---|
Stations | HarbourFront • Outram Park • Chinatown • Clarke Quay • Dhoby Ghaut • Little India • Farrer Park • Boon Keng • Potong Pasir • Woodleigh • Serangoon • Kovan • Hougang • Buangkok • Sengkang • Punggol • Punggol Coast | |
Rolling Stock | 751A • 751C • 851E | |
Depots | Sengkang | |
Others | Bridging Service |