Difference between revisions of "Dover station"
Jump to navigation
Jump to search
m (→History) |
m (→History) |
||
Line 18: | Line 18: | ||
!width=150|Date!!Event | !width=150|Date!!Event | ||
|- | |- | ||
|18 October 2001||Station officially | |18 October 2001||Station officially opened | ||
|- | |- | ||
|10 December 2017||rowspan=2|Station closed | |10 December 2017||rowspan=2|Station closed due to the upgrading of signaling system on the {{EWL}}<ref>[//www.channelnewsasia.com/news/singapore/2-full-day-shutdowns-shorter-operating-hours-for-19-nsewl-mrt-9425326 "2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT"]. Channel NewsAsia (21 November 2017).</ref> | ||
|- | |- | ||
|17 December 2017 | |17 December 2017 |
Revision as of 22:29, 26 July 2020
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
Template:Code/1 Dover 杜弗 டோவெர்*Graphic From SGTrains/Wikipedia/LTA | |
Statistics | |
---|---|
Address | 200 Commonwealth Avenue West Singapore 138677 |
Line(s) | East–West Line |
Structure | Elevated |
Connections | File:Bus Logo.png File:Taxi Logo.png |
Abbreviation | DVR |
Dover (EW22) is a Mass Rapid Transit (MRT) station on the East–West Line.
History
Date | Event |
---|---|
18 October 2001 | Station officially opened |
10 December 2017 | Station closed due to the upgrading of signaling system on the East–West Line[1] |
17 December 2017 |
Construction controversy
Adjacent to the Singapore Polytechnic on one side, and undeveloped land on the other, the building of the station was met with reservations by some members of the public over the small area it serviced when construction began in June 1998. There were criticisms over the spending of "taxpayers' money" chiefly for use only by students of one educational institution.[2] The Land Transport Authority proceeded with the construction anyway, to serve commuters along Singapore Polytechnic with Dover housing estate.[3]
Layout
L3 | ||
---|---|---|
Platform A | ||
Template:Route/3 | ||
Template:Route/1 | ||
Platform B | ||
L2 | Concourse | Faregates, Ticketing Machines, Passenger Service Centre |
L1 | Street Level | Singapore Polytechnic |
Exits
Exit | Disabled-Access | Location/Nearby |
---|---|---|
A | Commonwealth Avenue West, Singapore Polytechnic | |
B | Commonwealth Avenue West, School of Science & Technology |
Transport Services
First/Last Train Timing
Destination | First Train | Last Train | ||
---|---|---|---|---|
Mon − Fri | Sat | Sun & P.H. | Daily | |
File:MRTFFF.png East–West Line | ||||
EW1Pasir Ris | 05:40 | 05:40 | 06:08 | 23:49 |
EW33Tuas Link | 06:18 | 06:18 | 06:44 | 00:17 |
Bus
Bus Stop | Exit | Bus Service |
---|---|---|
19031 | Dover Stn Exit A |
|
19039 | Dover Stn Exit B |
References
- ↑ "2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT". Channel NewsAsia (21 November 2017).
- ↑ "Public should not subsidise new MRT stations". Leong Yit Chun (Straits Times (Forums), 19 August 2002)
- ↑ "New MRT station at S'pore Poly to be ready by Year 2001". Straits Times (29 July 1997).