Difference between revisions of "Mandai Depot"

From SgWiki
Jump to navigation Jump to search
(Change link.)
m
 
(11 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{|class="wikitable" border="1" cellpadding="2" style="float:right"
{{Infobox/Depot
|colspan="2" style="text-align:center"|<big>'''Mandai Depot'''</big><br><big>'''万礼车厂'''</big>
|Name=Mandai Depot<br>万礼车厂<br>மண்டாய் பணிமனை
|Info=
{{Infoline|Address|320 Mandai Road<br>Singapore 779405}}
{{Infoline|Line(s)|{{TEL}}}}
{{Infoline|Rolling Stock(s)|[[Kawasaki Heavy Industries & CRRC Qingdao Sifang T251|T251]]}}
}}
 
'''Mandai Depot''' is the ninth train depot in Singapore. It maintains trains for the {{TEL}}.
 
==History==
{|class="wikitable mw-collapsible" style="border-collapse:collapsed;width:50%"
|-
|-
!style="text-align:left" valign="top"|Address
!width=150|Date!!Event
|valign="top"|
|-
|-
!style="text-align:left" valign="top"|Coordinates
|31 December 2020||Depot officially opens
|valign="top"|
|-
!style="text-align:left" valign="top"|Owner
|valign="top"|Land Transport Authority
|-
!style="text-align:left" valign="top"|Operator
|valign="top"|To be announced
|-
!style="text-align:left" valign="top"|Line(s)
|valign="top"|[[Thomson East Coast Line]]
|-
!style="text-align:left" valign="top"|Capacity
|valign="top"|90 trains
|-
!style="text-align:left" valign="top"|Area
|valign="top"|320,000m²
|}
|}


The''' Mandai Depot''' is a full maintenance [[Mass Rapid Transit|MRT]] depot for the upcoming [[Thomson East Coast Line]].
==Reception Tracks==
 
On the Thomson–East Coast Line, it has 3 reception tracks, 2 that lead to {{Stn|Springleaf| station}} and 1 to {{Stn|Woodlands| station}}.
Located at a 32-hectare site <sup>[http://www.onemap.sg/?SearchVal=WOODLANDS%20AVENUE%2012&LW:Y&wO5d:JIabq_R,hhJhh_R,Jhhha_J,hhcaR_J,c (1)]</sup> bounded by Mandai Road, Seletar Expressway and Lor Lada Hitam, it is within the Mandai Agrotechnology Park.<sup>[http://orchidville.com/about_us.php (2)]</sup> and has the capacity to stable up to 90 trains.<sup>[http://www.lta.gov.sg/images/TSL%20Annex-A%2016-06-2011.pdf (3)]</sup>
 
First announced by LTA on 16 June 2011, construction of the depot would commence at the end of 2012 and is expected to be an underground depot - the third in Singapore. Construction is expected to be completed in the year 2019. As a result of the construction, the farm 'Orchidville' that previously occupied the site was acquired.<sup>[http://app.lta.gov.sg/corp_press_content.asp?start=2g8u06wb5lpg487lobzx9o7n1sfszjo7137e2b82kqgbb1lbm6 (4)]</sup> Prior to the acquiration, Orchidville was the largest orchid farm in Singapore.
 
It will serve the upcoming [[Thomson East Coast Line]] as the Operation Control Centre and provide stabling and maintenance facilities for the line's rolling stock.


==References==
==References==
# http://www.onemap.sg/?SearchVal=WOODLANDS%20AVENUE%2012&LW:Y&wO5d:JIabq_R,hhJhh_R,Jhhha_J,hhcaR_J,c
<references/>
# http://orchidville.com/about_us.php
# http://www.lta.gov.sg/images/TSL%20Annex-A%2016-06-2011.pdf
# http://app.lta.gov.sg/corp_press_content.asp?start=2g8u06wb5lpg487lobzx9o7n1sfszjo7137e2b82kqgbb1lbm6


==Related Links==
{{Mass Rapid Transit}}
{{Mass Rapid Transit}}
{{Thomson–East Coast Line}}


[[Category:Mass Rapid Transit Depot]]
[[Category:Rail Depot]]

Latest revision as of 15:34, 17 June 2023


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Mandai Depot
万礼车厂
மண்டாய் பணிமனை
Statistics
Address 320 Mandai Road
Singapore 779405
Line(s) Thomson–East Coast Line
Rolling Stock(s) T251

Mandai Depot is the ninth train depot in Singapore. It maintains trains for the Thomson–East Coast Line.

History[edit]

Date Event
31 December 2020 Depot officially opens

Reception Tracks[edit]

On the Thomson–East Coast Line, it has 3 reception tracks, 2 that lead to Springleaf station and 1 to Woodlands station.

References[edit]


icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
icon Thomson–East Coast Line [ VTE ]
Stations Woodlands NorthWoodlandsWoodlands SouthSpringleafLentorMayflowerBright HillUpper ThomsonCaldecottMount PleasantStevensNapierOrchard BoulevardOrchardGreat WorldHavelockOutram ParkMaxwellShenton WayMarina BayMarina SouthGardens by the BayFounders' MemorialTanjong RhuKatong ParkTanjong KatongMarine ParadeMarine TerraceSiglapBayshoreBedok SouthSungei Bedok
Rolling Stock T251
Depots MandaiEast Coast
Others Bridging Service