Difference between revisions of "North-South Corridor"
(3 intermediate revisions by 3 users not shown) | |||
Line 4: | Line 4: | ||
While first conceptualised as an expressway to be completed by 2020, the corridor will be designated as the island's first "integrated transport corridor" featuring continuous bus lanes and cycling trunk routes, throughout the entire route of the expressway. Construction was initially planned to begin in 2017, with an expected completion date of 2023. However, the first contract was only awarded in November 2017, with works commencing in early 2018. | While first conceptualised as an expressway to be completed by 2020, the corridor will be designated as the island's first "integrated transport corridor" featuring continuous bus lanes and cycling trunk routes, throughout the entire route of the expressway. Construction was initially planned to begin in 2017, with an expected completion date of 2023. However, the first contract was only awarded in November 2017, with works commencing in early 2018. | ||
The North-South Corridor | |||
The North-South Corridor would be completed in two phases, starting with the viaduct segment which would be completed by the previous expected completion date of 2027, followed by the underground tunnel segment which would be delayed by another two years and completed by 2029. Reasons cited for the delay include the COVID-19 pandemic along with challenging soil conditions. | |||
<br> | <br> | ||
==See also== | |||
*[[Expressways]] | |||
==External links== | ==External links== | ||
* [http://en.wikipedia.org/wiki/North%E2%80%93South_Expressway_%28Singapore%29 Wikipedia article] | * [http://en.wikipedia.org/wiki/North%E2%80%93South_Expressway_%28Singapore%29 Wikipedia article] | ||
[[Category: Roads]] |
Latest revision as of 12:44, 7 June 2024
The North–South Expressway (Abbreviation: NSE; Chinese: 南北高速公路; pinyin: Nánbĕi Gāosù Gōnglù; Malay: Lebuhraya Utara-Selatan) will be the 11th of Singapore's network of expressways when completed. The North South Expressway will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). This new expressway was announced on 30 January 2008 as part of a major review of Singapore's transport network by the Land Transport Authority (LTA). The 21 kilometres (13 mi) expressway would cost about S$7–8 billion when fully completed by 2026 and will connect the East Coast Parkway (ECP) with the northern parts of Singapore.
On 19 Jan 2011, the government gave the green light to build the expressway between Admiralty Road West and Toa Payoh Rise. Advance work will begin in 2013, and major construction works will commence in 2015. The North South Expressway will have a total of 16 entrances and 17 exits to connect towns along the north-south corridor—Woodlands, Sembawang, Yishun, Ang Mo Kio, Bishan and Toa Payoh—with the city centre. The NSE will also provide links to existing expressways, including the Seletar Expressway (SLE), Pan-Island Expressway (PIE) and East Coast Parkway (ECP). On 15 November 2011, LTA unveiled the full alignment of the North-South Expressway.
While first conceptualised as an expressway to be completed by 2020, the corridor will be designated as the island's first "integrated transport corridor" featuring continuous bus lanes and cycling trunk routes, throughout the entire route of the expressway. Construction was initially planned to begin in 2017, with an expected completion date of 2023. However, the first contract was only awarded in November 2017, with works commencing in early 2018.
The North-South Corridor would be completed in two phases, starting with the viaduct segment which would be completed by the previous expected completion date of 2027, followed by the underground tunnel segment which would be delayed by another two years and completed by 2029. Reasons cited for the delay include the COVID-19 pandemic along with challenging soil conditions.