Difference between revisions of "List of Roads in Hougang"

From SgWiki
Jump to navigation Jump to search
(Created page with "This is a list of roads in the Jurong West Planning Area. ==List Of Roads== *Buangkok Drive *Buangkok Green *Hougang Avenue 1 *Hougang Avenue 2 *Hougang Avenue 3 *Hougang Avenue 4 *Hougang Avenue 5 *Hougang Avenue 6 *Hougang Avenue 7 *Hougang Avenue 8 *Hougang Avenue 9 *Hougang Avenue 10 *Tampines Road ===Buangkok Drive=== Buangkok Drive is a road that was completed in the second half of 1999 from Buangkok Green to Punggol Road, as the road shortens the travel driv...")
 
 
Line 1: Line 1:
This is a list of roads in the [[Jurong West]] Planning Area.
This is a list of roads in the [[Hougang]] Planning Area.


==List Of Roads==
==List Of Roads==

Latest revision as of 18:47, 29 August 2024

This is a list of roads in the Hougang Planning Area.

List Of Roads[edit]

  • Buangkok Drive
  • Buangkok Green
  • Hougang Avenue 1
  • Hougang Avenue 2
  • Hougang Avenue 3
  • Hougang Avenue 4
  • Hougang Avenue 5
  • Hougang Avenue 6
  • Hougang Avenue 7
  • Hougang Avenue 8
  • Hougang Avenue 9
  • Hougang Avenue 10
  • Tampines Road

Buangkok Drive[edit]

Buangkok Drive is a road that was completed in the second half of 1999 from Buangkok Green to Punggol Road, as the road shortens the travel drive from Ang Mo Kio Avenue 5 to Punggol Road. The second section was opened all the way to Upper Serangoon Road on December 2001 together with the extension of Upper Serangoon Road all the way to Punggol East which was opened in 2002. Buangkok East Drive was subsequently opened in 2009, all the way to the Tampines Road. The last Buangkok Drive extension, from Buangkok Green to Yio Chu Kang Road will start construction in 2017 for completion in 2019. This is under Contract 16BI030.

On 23 October 2005, bus service 43 plies through the road for the first time between Sengkang Central and Sengkang East Road, followed by on 20 September 2015, bus service 102 plies through the road for the first time between Upper Serangoon Road and Sengkang Central. Finally on 9 September 2019, bus service 43e plies through Buangkok East Drive as a public bus for the first time.

Bus Stops Services
Block 278 CP icon67621
Buangkok Drive
Block 557 icon67629
Buangkok Drive

Buangkok Green[edit]

Buangkok Green is a road that was completed in 1997 from Yio Chu Kang Road to Buangkok Drive.